Search NASA⌕ Search

SEARCH · Search NASA

Results for “UNITED KINGDOM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Diagnostic experiments at a 3 MeV test stand at Rutherford Appleton Laboratory (United Kingdom)

A front end is currently under construction consisting of a H{sup -} Penning ion source (65 keV, 60 mA), low energy beam transport (LEBT), and radio frequency quadrupole (3 MeV output energy) with a medium energy beam transport suitable for high power proton applications. Diagnostics can be divided either in destructive techniques such as beam profile monitor, pepperpot, slit-slit emittance scanner (preferably used during commissioning) or nondestructive, permanently installed devices such as photodetachment-based techniques. Another way to determine beam distributions is a scintillator with charge-coupled device camera. First experiments have been performed to control the beam injection into the LEBT. The influence of beam parameters such as particle energy and space-charge compensation on the two-dimensional distribution and profiles will be presented.

43 PARTICLE ACCELERATORS↗

Complete Genome Sequences of Historic Clostridioides difficile Food-Dwelling Ribotype 078 Strains in Canada Identical to That of the Historic Human Clinical Strain M120 in the United Kingdom

Here, Clostridioides (Clostridium) difficile is a spore-forming anaerobic bacterium that causes severe intestinal diseases in humans. Here, we report the complete genome sequence of the first C. difficile foodborne type strain (PCR ribotype 078) isolated from food animals in Canada in 2004, which has 100% similarity to the genome sequence of the historic human clinical strain M120.

59 BASIC BIOLOGICAL SCIENCES↗

PCAST: Joint Statement to Leaders from the United States' President's Council of Advisors on Science and Technology and United Kingdom's Prime Minister's Council for Science and Technology

The President’s Council of Advisors on Science and Technology (PCAST) is the sole body of advisors from outside the federal government charged with making science, technology, and innovation policy recommendations to the President and the White House. Established by Executive Order, it is an independent Federal Advisory Committee comprised of distinguished individuals from industry, academia, and non-profit organizations with a range of perspectives and expertise. On March 14, 2024, PCAST and the UK Council for Science and Technology sent a joint letter to President Biden and Prime Minister Sunak outlining shared priorities for ongoing collaboration and the sharing of expertise between the two Councils.

99 GENERAL AND MISCELLANEOUS↗

Report on the SNL/AWE/NSF international workshop on joint mechanics, Dartington, United Kingdom, 27 29 April 2009.

The SNL/AWE joint mechanics workshop, held in Dartington Hall, Totnes, Devon, UK 26-29 April 2009 was a follow up to another international joints workshop held in Arlington, Virginia, in October 2006. The preceding workshop focused on identifying what length scales and interactions would be necessary to provide a scientific basis for analyzing and understanding joint mechanics from the atomistic scale on upward. In contrast, the workshop discussed in this report, focused much more on identification and development of methods at longer length scales that can have a nearer term impact on engineering analysis, design, and prediction of the dynamics of jointed structures. Also, the 2009 meeting employed less technical presentation and more break out sessions for developing focused strategies than was the case with the early workshop. Several 'challenges' were identified and assignments were made to teams to develop approaches to address those challenges.

42 ENGINEERING↗

Structural testing of concorde aircraft: Further report on United Kingdom tests

A summary of tests conducted on the Concorde aircraft nacelle structure is presented. The tests were conducted as a part of the structural development and certification program. The nacelle structural specimens are described. The problems associated with the intake testing and engine-bay and nozzle testing are discussed.

Harpur, N.↗

Cartographic evaluation of ERTS-1 imagery for part of the United Kingdom

The author has identified the following significant results. The area around Bristol, England contained a variety of both natural and man-made features visible on ERTS imagery, notably the Seven Estuary, the Jurassic limestones of the Cotswold scarp, and a variety of major and minor communications routes and urban developments. Visual interpretive studies were carried out on the diapositive imagery in order to ascertain the extent to which various terrain features, broadly classified into Solid and Drift Geology, Topography, and Land use, were depicted on the four independent imagery bands. Quantitative assessment of the accuracy of map content suggests that the imagery is inadequate for most mapping purposes within the area of study, at least using traditional interpretation methods.

Bickmore, D. P.↗

Submicrosecond time transfer between the United States, United Kingdom, and Australia via satellite

During 1972 time transfer experiments were run between the U.S. Naval Observatory and the Royal Greenwich Observatory and, in 1973, between the U.S. Naval Observatory and the Division of National Mapping in Canberra, Australia. In both cases the time transfer agent was the TIMATION 2 satellite, 1969-82B. The satellite ephemerides were computed from data provided by the Defense Mapping Agency TRANET. This net tracked the satellite's Doppler transmissions. The phase of the satellite clock was determined from knowledge of the position of the satellite and of the observer and the computed distance between the two. By monitoring the clock on successive passes the rate of the satellite clock was determined at Washington. By again monitoring the satellite clock at the distant station the satellite clock could be compared to the local clock and this local clock compared to the U.S. Naval Observatory clocks. In 1972 the RMS of observations at Greenwich deviated by approximately 1/4 microsecond from a straight line when compared to the Naval Observatory. In 1973 the observation errors at Canberra were approximately half as great.

Easton, R. L.↗

Optical identifications of radio sources with accurate positions using the United Kingdom Schmidt Telescope (UKST) IIIa-J plates

Several programs are making use of UKST Sky Survey plates to identify southern radio sources. The fine-grain modern plates and accurate radio positions give a much improved identification rate. It seems that it will very soon be possible to determine whether or not there is a quasar redshift cut-off at z of about 4. There is an urgent need for more accurate fundamental reference star positions in the South.

Savage, A.↗

The Southern Hemisphere lower stratosphere during August and September 1987 - Analyses based on the United Kingdom Meteorological Office Global Model

This paper presents a series of meteorological analyses used to aid the interpretation of the in situ Airborne Antarctic Ozone Experiment (AAOE) observations obtained aboard the ER-2 and DC-8 aircraft and examines the basis and accuracy of the analytical procedure. Maps and sections of meteorological variables derived from the UK Meteorological Office Global Model are presented for ER-2 and DC-8 flight days. It is found that analyzed temperatures and winds are generally in good agreement with AAOE observations at all levels; minor discrepancies were evident only at DC-8 altitudes. Maps of potential vorticity presented on the 428-K potential temperature surface show that the vortex is essentially circumpolar, although there are periods when major distortions are apparent.

Mckenna, D. S.↗

Use of Nuclear Divers in Decommissioning of Spent Fuel Pools/Ponds in the United Kingdom - 17431

Magnox Ltd. (Operated by the Cavendish Fluor Partnership) has initiated decommissioning of spent fuel pools/ponds utilizing divers. This decommissioning technique is being employed to disassemble and size reduce underwater equipment and furniture, as well as the collection of sludge and debris prior to draining of the pool. This technique has proven to be highly effective at reducing the radiological exposure to the workforce over previously implemented methods and is expected to significantly reduce overall decommissioning durations and costs. The decommissioning of the UK Nuclear Decommissioning Authority's (NDA) Dungeness A power station spent fuel ponds was initiated in 2015 to eliminate the mobile hazards and prepare the facilities for entry into a Care and Maintenance period. This dual reactor site has two spent fuel ponds each containing 1000 m{sup 3} of water, with the fuel removed since April 2012, which will utilize divers to remove solid wastes from the ponds prior to drain down. This technique has overcome many challenges to implementation including regulatory approval and high airborne contamination. The use of divers for decommissioning was a new technique for the Magnox Sites and required early engagement with the UK Office for Nuclear Regulation (ONR) and the Health and Safety Executive (HSE). The use of plasma arc cutting underwater required the pond area to be classified as an airborne contamination area. The implementation of local ventilation has controlled this hazard. The initial demonstration dives at Dungeness A were completed in April 2016 and the decommissioning dives are expected to be completed in March 2017. This is a substantial improvement to the project schedule and will allow the project completion 5 1/2 years ahead of the Licence Condition milestone. This technique is planned to be implemented at two further NDA Magnox power stations over the next three years. This paper provides the accomplishments and lessons learned to date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Workshop on Characterization and PIE Needs for Fundamental Understanding of Fuels Performance and Safety

The International Workshop on Characterization and PIE Needs to Support Science-Based Development of Innovative Fuels was held June 16-17, 2011, in Paris, France. The Organization for Economic Co-operation and Development (OECD), Nuclear Energy Agency (NEA) Working Party on the Fuel Cycle (WPFC) sponsored the workshop to identify gaps in global capabilities that need to be filled to meet projected needs in the 21st century. First and foremost, the workshop brought nine countries and associated international organizations, together in support of common needs for nuclear fuels and materials testing, characterization, PIE, and modeling capabilities. Finland, France, Germany, Republic of Korea, Russian Federation, Sweden, Switzerland, United Kingdom, United States of America, IAEA, and ITU (on behalf of European Union Joint Research Centers) discussed issues and opportunities for future technical advancements and collaborations. Second, the presentations provided a base level of understanding of current international capabilities. Three main categories were covered: (1) status of facilities and near term plans, (2) PIE needs from fuels engineering and material science perspectives, and (3) novel PIE techniques being developed to meet the needs. The International presentations provided valuable data consistent with the outcome of the National Workshop held in March 2011. Finally, the panel discussion on 21st century PIE capabilities, created a unified approach for future collaborations. In conclusion, (1) existing capabilities are not sufficient to meet the needs of a science-based approach, (2) safety issues and fuels behavior during abnormal conditions will receive more focus post-Fukushima; therefore we need to adopt our techniques to those issues, and (3) International collaboration is needed in the areas of codes and standards development for the new techniques.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Panel Session 19: Developments in the Clean-up Mission of Sellafield

This panel focused on the progress towards closure of the legacy ponds and silos on the Sellafield Site. The discussion included progressive learning, technical challenges, safety, and regulatory flexibility required to achieve cleanup. The panel included NDA, regulators and Sellafield Ltd. Presentations proposed include: 1 - Developments in the Cleanup of Sellafield: An Owners Perspective (Adrian Simper, Nuclear Decommissioning Authority UK (United Kingdom)); 2 - Sellafield Ltd (Lee Peck, Sellafield Ltd. (United Kingdom)); 3 - Developments in the Clean-up Mission at Sellafield (Ian Dallas, Office for Nuclear Regulation (United Kingdom)); 4 - Developments in the Clean-up Mission of Sellafield, UK (Steven Thomson, National Nuclear Laboratory (United Kingdom))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗