Search NASA⌕ Search

SEARCH · Search NASA

Results for “Utilizing Supervisory Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Design of a Multi-Chemistry Battery Pack System for Behind-the-Meter Storage Applications

Battery management systems (BMS) are essential for a battery pack's safe operation and longevity. This paper presents an active balancing method-based BMS for different cell chemistry structures to be used in behind-the-meter storage (BTMS) applications. The proposed system utilizes modular isolated dual active bridge (DAB) DC/DC converters to actively balance the battery pack through a low voltage (LV) bus. A supervisory controller monitors all the cell voltage, current, and state of charge (SOC) values. Based on the estimation of the SOCs, reference currents for the DAB converters are generated by the supervisory controller. Detailed modeling and the control approach of the modular DAB converters are presented in the paper. Moreover, the control strategy of the supervisory control is also analyzed. The proposed method and structure can be extended to any combination of the number of cells to design the battery pack. Simulation results are provided for a system consisting of three cells in parallel to form a cell block and three cell blocks in series to form the battery module. Experimental results are provided for three modular DAB converters operating with a LiFeMnPO4 prismatic cell with 3.2V, 20Ah rated values.

battery management systems↗

Unalakleet Microgrid Optimization for Tribal Community Resilience

The Unalakleet Microgrid Optimization Project aimed to strengthen the reliability and efficiency of the isolated electric power system that serves the Tribal community of Unalakleet, Alaska. The community relies entirely on a local wind-diesel microgrid, consisting of four 475 kW diesel generators and six 100 kW wind turbines, to provide electricity to approximately 745 residents and Tribal facilities. Because Unalakleet is not on a road system and is located nearly 400 miles from the nearest major power grid, maintaining a resilient and efficient local energy system is critical. The scope of this project included upgrading a portion of the transmission line between the wind farm and the power plant to increase voltage and reduce line losses, along with modernizing the Supervisory Control and Data Acquisition (SCADA) system to improve monitoring, control, and data management of the power system. These upgrades were designed to increase wind energy utilization, reduce diesel fuel consumption by tens of thousands of gallons annually, and improve overall grid stability. By allowing more of the community’s electricity to be supplied by local renewable wind resources, the project was designed to lower operating costs, reduce dependence on imported fuel, and strengthen the long-term resilience of the power system. These improvements represent an important step toward the community’s long-term energy vision of expanding renewable generation, incorporating energy storage, and eventually achieving “diesels-off” operation, where essential Tribal loads are powered primarily by local renewable resources.

17 WIND ENERGY↗

Employing MACS/ViBRANT as a Surrogate MARVEL Reactor for Startup Reactivity Tuning and Supervisory Control Processes

Advanced nuclear reactors are a key part of the future of nuclear energy both in the United States and globally. They offer unique benefits for various energy-demanding applications, including use in remote locations, compact size, modular manufacturing, remote monitoring, low and/or variable power rating operation, and reliance on novel technologies to enhance operational safety. To achieve economic feasibility, advanced reactors must significantly reduce their workforces in comparison with the current fleet. Achieving this reduction will occur through reducing staff workloads using technology to achieve autonomous or semi-autonomous operations, demonstrated by comprehensive testing and validation activities. These operations will require both software and hardware platforms during the design and testing phases. While simulations are useful during the design phase, their performance can significantly deviate during actual deployment on hardware. This report presents the outcomes of a collaborative technical initiative between the U.S. Department of Energy (DOE) Microreactor Program (MRP) and Advanced Sensors and Instrumentation (ASI) Program. The collaboration utilized the Microreactor Automated Control System (MACS) hardware platform to bridge the gap between theoretical reactor design and actual startup and control operations. Two key use cases were investigated: facilitating the startup testing period and demonstrating supervisory control. The first use case details the key Microreactor Applications Research Validation and Evaluation (MARVEL) reactor startup physics testing activities conducted using the MACS platform. These activities included drum worth measurements, shutdown margin assessment, temperature feedback analysis, and scram time evaluation, as well as unique testing that would apply to the MARVEL reactor to demonstrate the testing methodologies in a low-risk environment. The MACS platform, serving as a surrogate representation of the MARVEL reactor, proved instrumental in performing these tests. The exercise revealed aspects that led to optimized processes, refined hardware design, and enhanced base software capabilities. By maturing methods and technologies in this manner, the initiative promises to reduce wasted time in the actual on-site reactor deployment effort, thereby saving significant time and resources. The second use case focuses on the development and implementation of supervisory control methods aimed at managing core tilt, which can result from asymmetrical operations or manufacturing imperfections in fuel rods or reactivity control devices. A key objective was to assess and compare the use of artificial intelligence (AI) for supervisory control. The effort aimed to define the role of supervisory control to enhance performance without risking control instability. This effort explored three distinct approaches: rules-based (RB) methods, optimization techniques, and reinforcement learning (RL) algorithms. Each approach was evaluated for its ease of implementation, its usability, and its effectiveness in responding to asymmetries in neutron flux. Comparative analysis of these approaches provided valuable insights into their applicability and effectiveness, offering a robust framework for advanced reactor operations. Together, these two use cases highlight the potential of hardware test beds to help streamline the design, operation, and control of advanced nuclear reactors. This collaborative effort underscores the importance of continued innovation and experimentation in achieving the next generation of safe, reliable, and economically viable nuclear energy solutions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Grid Topology Discovery Algorithm Evaluation of Suitability for Utility Deployment (CRADA 606 Final Report)

This work presents the results of a field-informed demonstration aimed at evaluating the practical suitability of a topology discovery algorithm for utility environments. We demonstrated an algorithm that uses a graph-theory-informed state estimation approach for model selection. In collaboration with Survalent and Peninsula Light Co., the algorithm was applied to real feeder models and field measurements from supervisory control and data acquisition (SCADA) and advanced metering infrastructure (AMI) systems to identify the operational topology of a power distribution system. The demonstration assessed the algorithm’s performance under realistic data conditions, including sparse and noisy measurements, and examined its ability to identify the most likely network configurations. The results confirmed that the approach can effectively narrow down feasible topologies, providing operators with improved situational awareness of network status. Key lessons learned emphasize the need for systematic data validation and strategic sensor placement to enhance observability. These insights inform future deployment strategies and guide refinements for broader adoption in utility operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Secure Communications Concept and API Concept for Integrating XENDEE Positronix with TESLA PowerPack System at Site 300 (Final Deliverable)

The CleanStart DERMS project focuses on the management of Distributed Energy Resources (DER) for enhanced distribution grid resilience. The demonstration site has changed from Riverside Public Utility to the LLNS Site 300 DERS demonstration site. This project has so far focused only on device level controllers and local area controllers. These controllers potentially lack the ability to perform supervisory control and grid interactive control functions, essential for grid-level optimal DER management. This project seeks to close that gap in development of secure communication concept and appropriate Application Programming Interfaces (API) to enable integration with DERs, device level and local area controllers, such as Distributed Energy Resources Management System (DERMS).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Prognosis of Wind Turbine Gearbox Bearing Failures Using SCADA and Modeled Data

Predictive maintenance and condition monitoring systems for wind turbines have seen increased adoption to minimize downtime, reducing operation and maintenance costs. On today’s wind power plants, the integrated supervisory control and data acquisition (SCADA) system provides low- frequency operational data that can be leveraged to quantify a wind turbine’s health. The aim of this study is to utilize machine-learning techniques to predict axial cracking failures in wind turbine gearbox bearings up to 1 month ahead of time. The failures are assumed to have occurred when the investigated bearing was replaced. While current SCADA systems show the overall condition of a wind turbine, often they do not allow for the investigation of specific gearbox bearings’ health. To enrich bearing fault signatures, additional data are computed through physics-based models using gearbox design information. Based on SCADA data, modeled data, and bearing failure log data from an actual wind plant, the performances of different machine-learning models on unseen data are then evaluated using industry-standard metrics such as precision, recall, and F1 score. Results show the overall system performance enhancement in predicting bearing failure when modeled data are included with SCADA data. The reduction in terms of false alarms is about 50%, and improvement in terms of precision and F1 score is about 33% and 12% respectively, based on the best modeling case in this study.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

A Control-oriented Building Envelope and HVAC System Simulation Model for a Typical Large Office Building

To enable advanced controls research for buildings, in this paper we present a dynamic simulation model for a typical large office building. In this model, we utilized EnergyPlus for calculating the building thermal load and the Modelica HVAC equipment library to implement the dynamic behavior of the heating, ventilation, and air conditioning (HVAC) system. We utilized a functional mockup interface to enable the run-time communication between the EnergyPlus model and the Modelica model. This simulation model can be driven by control inputs from supervisory decision making algorithms and thus can be used as a virtual testbed for advanced controls development and evaluation. To demonstrate the usage of the model, we implemented two HVAC control sequences representative for large office buildings, both based on the ASHRAE standard. Simulation results allowed us to compare the energy performance associated with the two control strategies, and the evolution of the system dynamics at a high temporal granularity.

Huang, Sen↗

Energy Management Information Systems Technical Resources Report

Guide supports federal facility staff in understanding, designing, procuring, and implementing Energy Management Information Systems (EMIS) as a valuable component of their portfolio-level energy and water planning and management strategies. As a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance, EMIS tools present significant opportunities for federal sector energy savings and improved operational performance. EMIS are at the forefront of transforming energy management best practices by providing building owners and operators with well-organized building performance and energy consumption data, enabling a host of analytic capabilities. These capabilities include portfolio-wide energy benchmarking, data visualization, and key performance indicator tracking; automated fault detection and diagnostics (AFDD); artificial intelligence for predictive analytics and control; automated measurement and verification of energy conservation measures; and supervisory control enabling automated system optimization and demand management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Smart Contract-Defined Secondary Control and Co-Simulation for Smart Solar Inverters using Blockchain Technology

This paper proposes a cooperative control approach using blockchain technology for solar inverters in a photovoltaic system. Moreover, a co-simulation method for smart inverters and a blockchain network is studied. The blockchain assisted-smart inverter (BASI) consists of a solar inverter and an internet of things device as a client node of a blockchain network, which can fully utilize emerging blockchain technologies such as distributed ledger, security functions, and smart contract. The control includes a primary-level droop control in a BASI and smart contract-defined secondary-level supervisory control in a secured blockchain network. The concept of the proposed smart contract-defined control approach is validated by simulation studies using the cyber-physical co-simulation testbed built-in MATLAB/Simulink in a PC interfacing with a Hyperledger-Fabric blockchain software implemented in a PC.

14 SOLAR ENERGY↗

Real-World Distribution System Modeling Framework for Transmission-and-Distribution Cosimulation: Preprint

This paper presents a modeling methodology for realistic distribution system simulation and analysis. The methodology involves three major approaches: utility model conversion, feeder load modeling, and feeder model validation. The feeder models obtained from the utility are converted to the format that is more flexible for analysis and algorithm development. The load profiles down to each node are modeled in detail using advanced metering infrastructure data and supervisory control and data acquisition (SCADA) system measured load data. Then the distribution system models are validated by comparing the simulated feeder-head voltage results and SCADA measured voltage data. To better understand the bulk system operations and the interactions between transmission and distribution systems, the modeled realistic distribution systems are integrated into a transmission-and-distribution cosimulation framework to perform the system simulation from the bulk system down to each node in the distribution system.

load modeling↗

Field Validation of a Grid-Interactive Efficient Building Software Solution

The U.S. General Services Administration's (GSA's) Green Proving Ground (GPG) program, in partnership with the National Laboratory of the Rockies (NLR), completed a field study of a Grid-Interactive Efficient Buildings (GEB) software solution. The study focused on a single testbed facility to test the GEB functionality of the software solution, along with other features. The testbed facility - a courthouse - is a common building type in GSA's vast building portfolio, offering potentially impactful findings on a scalable level. The study evaluated Prescriptive Data's technology, Nantum OS, a connected building operating system ("GEB Solution") which aggregates multiple sources of previously siloed building data and combines that data with external sources, such as weather information or utility signals, into a single integrated platform. A GEB Solution is a type of Energy Management Information System (EMIS). EMIS is defined as a system of devices, data services, and software applications that communicates with any building system or third-party data source to aggregate and transform data into new capabilities to aid in the optimization of energy use at the building, campus, or agency level. This specific GEB Solution is an EMIS with ASO, automated system optimization, offering supervisory control of certain aspects of the Building Automation System (BAS). Multiple features were evaluated including, but not limited to, Continuous Demand Management to avoid setting new monthly kilowatt (kW) peaks, energy efficiency for reduction of kilowatt hours (kWh) and natural gas consumption, and automated demand response (ADR) for purposes of lowering demand during a utility called Demand Response (DR) event. The testbed facility was the Foley Federal Building and US Courthouse ("Foley Federal Building") located in Las Vegas, NV. This is a 209,496 sq. ft. building constructed in the 1960s with major renovations in 2004. The facility was a good candidate due to the large prevalence of office and courthouse spaces in the GSA portfolio of buildings. It also has many features which allow integration into and control of the building and a strong facilities team to assist with the study. Quantitative and qualitative performance objectives were developed using GSA's GPG GEB project template along with input from the vendor and building facility staff; these are outlined in Table 1. The quantitative performance objectives focused on continuous demand management, energy efficiency, and automated demand response. The qualitative performance objectives focused on the ease of installation and commissioning as well as the operability of the GEB solution. Other performance metrics that are reported on include carbon reduction, cost effectiveness, and occupant acceptance.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Utility Communications Standards Landscape 2025 Edition

Historically, challenges to managing electric utility data exchange have been addressed through dedicated communication solutions, enabling the transmission of data with both speed and security. Protocols have been deployed in a relatively uniform fashion; for example, field communications for Supervisory Control and Data Acquisition (SCADA) are commonly implemented using IEEE 1815 (DNP3).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Photovoltaic MPPT Charge Controller Real-Time Testbed for Cybersecurity Applications

The increasing deployment of distributed energy resources (DER) over the last decade is a great ally to combat climate change and strengthen the grid during increasingly common extreme weather events. However, DER systems, combined with the ongoing transition to a digital power grid, also pose substantial cybersecurity threats. One of the most common communication protocols used in DER integration is the Distributed Network Protocol 3 (DNP3), which is known to have many security vulnerabilities. Thus, it is essential to investigate cyberattack behaviors and mitigation on power systems using DNP3. In this paper, we designed and implemented a cybersecurity testbed for a simulated photovoltaic (PV) maximum power point tracking (MPPT) charge controller. Our testbed uses an MPPT charge controller simulated on a Typhoon HIL602+ real-time simulator with a real DNP3 communication connection over TCP/IP, allowing for safe and efficient monitoring and manipulation of data traffic between the simulated hardware and supervisory control and data acquisition (SCADA) systems.

14 SOLAR ENERGY↗

Transactive HVAC Agent - Design and Performance Evaluation

Transactive energy systems are playing an increasingly important role in the efficient and reliable marketbased operation of the power grid. Since a significant portion of the residential building energy consumption is from heating ventilation and air conditioning (HVAC) systems, HVAC is one of the most promising resources to provide load flexibility. However, utilizing HVAC flexibility to provide various grid services while simultaneously maintaining consumer comfort and cost-reductions is challenging. This paper presents a design of a transactive HVAC agent (T-HVAC) to be used as a supervisory control for the HVAC system that can simultaneously ensure comfort and cost-reduction. In particular, the T-HVAC a) estimates HVAC thermal dynamics, b) ensures optimal operations of the HVAC system, and c) participates into markets, and d) implements a market-based control via controlling the thermostat temperature set-point. The T-HVAC performance is demonstrated through multiple scenarios and illustrations.

Demand flexibility, distribution system, HVAC, Tra↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Consolidated Hydropower Data Repository: Value and Opportunities

Hydropower is one of several types of generating assets that provides energy, capacity, and services to electric power systems. It does so under rubrics and objectives—market driven and regulated, internal and external to asset and fleet owners—that address reliability, cost, price, and, increasingly, flexibility of output. The aggregation of data from multiple hydropower units can provide insights into asset operations and maintenance practices and needs and assist in meeting hydropower objectives. This paper examines the concept and potential benefits of aggregating hydropower asset data—primarily supervisory control and data acquisition (SCADA) information—with examples of insights developed from data aggregated by the Hydropower Research Institute (HRI). Data aggregation as discussed herein, and as implemented by the HRI, extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. Examples of research and analytics from such aggregated datasets range from unit load dependency analyses to modeling sensor measurements to detect and diagnose anomalies in assets. These examples showed the benefits of utilizing the entire dataset for insights into how the sensor layout of a single unit or set of units compares to the hydropower industry overall. Such insights include whether additional sensors are needed to complete analyses or to make decisions. In addition, utilizing multiple sensors of the same kind within a unit can provide an indication of possible current or upcoming problems with equipment. Although other analyses are possible, their use requires the development of complex models and, potentially, access to types of data that are currently not included with the example dataset used in this study. However, the examples studied herein confirmed the value of data aggregation in the fleet and unit contexts, and the value extends beyond multiple units in a powerhouse and beyond multiple hydropower facilities in an electric utility fleet or river system. The assessments also provided insights into potential extensions to the data aggregation concept that could further add to their value to the hydropower community, and these are included in this document as a set of recommendations.

13 HYDRO ENERGY↗

Automated Glovebox Work-cell Design - 18370

Los Alamos National Laboratory (LANL) is the primary plutonium science and manufacturing facility in the United States supporting multiple national security programs. It is responsible for completing a high variety of small-batch manufacturing tasks requiring the handling and precision machining of Special Nuclear Materials (SNM). Given the myriad of tasks that must be completed in a limited workspace, LANL intends to utilize flexible, multi-use robotic work-cells capable of completing a variety of mission critical tasks in a single glovebox with no re-tooling needed between batch jobs. This approach would allow LANL more flexibility in its production schedule and to meet its future production and research objectives. In this paper, we present a system that integrates multiple sensors and other manufacturing peripherals into existing glovebox infrastructure. Currently, a technician can place an object in the work area where vision sensors and supervisory software identify the object and its pose and automatically determine which manufacturing task to complete. Pose uncertainty is addressed in real-time by the task planner, eliminating the need for fixtures. Grasps are validated using pressure sensors, payload sensors, and grasp quality metrics to ensure that objects are not dropped or damaged during manipulation. The robot, sensors, and peripherals are controlled using open-source software built utilizing ROS (Robot Operating System), which minimizes redevelopment and allows for re-use and extensibility. Established capabilities support vision, collision-free path planning, and more, minimizing development time. For this effort, particular attention was given to the integration of general peripheral devices (drill, chuck, etc.), which is critical to efficiently utilizing ROS in manufacturing environments. This integration is achieved with an in-development framework that allows for quick integration of peripherals, including I/O devices and motors. Contact tasks utilize the Generalized Contact Control Framework (GCCF) previously developed at UT Austin. GCCF allows application developers to easily define multiple contact control tasks for a single robot. This paper summarizes the key software components necessary to develop the multi-use work-cell including existing ROS components. UT-developed software for grasp validation, peripheral integration, and contact control is presented in more depth. Finally the glovebox system is demonstrated completing a set of tasks with no fixturing necessary. Primary tasks include surface preparation/ablation, drilling, press-fitting, and sorting, as well as supporting material transfer and inspection tasks. The glovebox work-cell reduces cost, operator dose, ergonomic issues, and time loss due to material transfer between gloveboxes that only support one task. If multiple glovebox work-cells are in use, they have the potential to eliminate bottlenecks and scale production capabilities beyond current limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Substation Circuit Breaker SCADA Cut-Over

The electric power industry has a unique set of issues related to the infrastructure put in place since the 1880s. As methods of generation, delivery and protection evolve, so must the equipment used by the utility. Furthermore, the equipment in use has a finite life and must be replaced over time. The substation at which this project takes place was originally built in the 1950s, though most of the equipment had already gone through several updates. The issue presented was upgrading the Supervisory Control and Data Acquisition (SCADA) system for all the devices connected to the last SCADA system installed a few decades ago. Though the SCADA system being replaced was connected to substation transformers, breakers, disconnects, relays and other devices, the scope of this report will focus on the cut-over of a single gas circuit breaker. After connecting the circuit breaker to the new SCADA, a system and operability (SO) test would need to be designed and carried out to validate the proper function of the device before returning it to service. This report will follow the design approach, execution, testing, and troubleshooting for the substation circuit breaker SCADA cut-over.

24 POWER TRANSMISSION AND DISTRIBUTION↗