Search NASASearch

SEARCH · Search NASA

Results for “Vision 2030”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

43 records · Page 3

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller

Equitable Strategies for Residential Building Energy Efficiency and Electrification in San José, California

Hotter summers, heat waves, wildfires, and droughts are already affecting San Jose residents, with historically marginalized communities impacted first and worst. The City of San Jose has ambitious goals to make the city climate-neutral by 2030 and serve as an example for cities to accelerate climate action around the world. Electrifying and decarbonizing residential buildings are important priorities to achieve San Jose's plans to reach carbon neutrality while enabling residents to live the "Good Life 2.0" - a vision that aligns with community-identified priorities of safety, health, freedom, community, and positive experiences. This technical assistance built upon the Electrify San Jose: Framework for Existing Building Electrification to identify actionable strategies to make single- and multi-family buildings both energy-efficient and all-electric. This report is intended to provide the San Jose Climate Smart team and their partners with relevant data, insights, and actionable analysis to aid in-depth and nuanced engagements with key stakeholders. In particular, the findings in this report highlight opportunities and challenges for San Jose City Council, residents, building owners, developers, financial institutions, and utility partners instrumental in building support and earning buy-in for energy efficiency and electrification upgrades in existing buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Equitable Strategies for Residential Building Energy Efficiency and Electrification in San José, California [Slides]

Hotter summers, heat waves, wildfires, and droughts are already affecting San Jose residents, with historically marginalized communities impacted first and worst. The City of San Jose has ambitious goals to make the city climate-neutral by 2030 and serve as an example for cities to accelerate climate action around the world. Electrifying and decarbonizing residential buildings are important priorities to achieve San Jose's plans to reach carbon neutrality while enabling residents to live the "Good Life 2.0" - a vision that aligns with community-identified priorities of safety, health, freedom, community, and positive experiences. This technical assistance built upon the Electrify San Jose: Framework for Existing Building Electrification to identify actionable strategies to make single- and multi-family buildings both energy-efficient and all-electric. This report is intended to provide the San Jose Climate Smart team and their partners with relevant data, insights, and actionable analysis to aid in-depth and nuanced engagements with key stakeholders. In particular, the findings in this report highlight opportunities and challenges for San Jose City Council, residents, building owners, developers, financial institutions, and utility partners instrumental in building support and earning buy-in for energy efficiency and electrification upgrades in existing buildings.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Dynamic Light-Scattering Probe Used for the Very Early Detection of Cataracts and to Measure Response to Therapy (or Treatment)

Half of all blindness worldwide is due to cataracts, and 34 million Americans over the age of 65 have cataracts. This figure is expected to rise to 70 million by the year 2030. Currently, no medical treatment is available to prevent or halt the progression of a cataract; nor is there any way to reverse a cataract once it has been detected by conventional methods. The only known treatment is surgical removal of the lens. It is estimated that over $5 billion will be spent this year for the treatment of cataract patients in the United States alone. According to Carl Kupfer, M.D., former Director of the National Eye Institute at the National Institutes of Health, "A delay in cataract formation of about 10 years would reduce the prevalence of visually disabling cataracts by about 45 percent." However, this vision remains a dream because of the lack of objective methods that can be used to detect cataracts very early and, hence, can be used for screening potential anticataract drugs. This is about to change. The National Eye Institute and NASA entered into a formal interagency agreement in late 1996 to develop and test a dynamic light-scattering (DLS) device to detect the earliest changes due to cataract formation. The new DLS probe developed by Dr. Ansari at the NASA Glenn Research Center is several orders of magnitude more sensitive than conventional clinical systems. This ultrahigh sensitivity enables the probe to detect the onset of a cataract before it has any effect on vision and allows researchers to test the effectiveness of anticataract drugs in reversing cataracts. This device (see the following illustration) was originally designed to study transport phenomena in microgravity fluid physics experiments onboard the space shuttle orbiters and space station. It will be very useful in testing anticataract drugs to halt or reverse the progression of cataracts during longitudinal clinical trials.

Ansari,Rafat R.

Overview of NASA ISRU Plans, Priorites, and Activities

Introduction:The National Aeronautics andSpace Administration (NASA) of the United States ofAmerica (US) has initiated the Artemis Moon to Marsprogram to send astronauts (the first woman andperson of color) back to the lunar surface, create asustainable human lunar exploration program, andlead the first human exploration mission to the Marssurface in the 2030’s [1]. A major objective of thisprogram is to characterize the resources that exist onthe Moon and Mars, and learn how to utilize them forsustained and affordable exploration. Commonlyknown as In Situ Resource Utilization (ISRU), thesearch for, acquisition, and processing of resources inspace has the potential to greatly reduce thedependency on transporting mission consumables andinfrastructure from Earth, thereby reducing missioncosts, risks, and dependency on Earth.ISRU is Enabling: Through the extraction andprocessing of resources into mission commoditiessuch as rocket propellants, life support consumables,and fuel cell reactants, ISRU enhances and evolvesthe cis-lunar, lander, and surface transportationsystems required for human exploration; expandingand enhancing HOW humans can explore and returnfrom the Moon. Through the extraction andprocessing of resources into metals, silicon, and othermanufacturing and construction feedstock, ISRUenhances and allows for the expansion of criticalinfrastructure using in situ manufacturing andconstruction capabilities that influence WHAT humanscan do on the Moon and in cis-lunar space. Becauseof this, ISRU supports and enables commercialinvolvement beyond NASA and governmentalagencies by both lowering the cost of sustainedtransportation to/from/on the Moon as well assupporting the market required for needing thesetransportation systems. Strategic Framework:To achieve this vision,NASA’s Space Technology Mission Directorate(STMD) ensures the coordinated development ofISRU and other critical space and surfaceinfrastructure elements such as propulsion, power,manufacturing, construction, and robotics through theStrategic Technology Architecture Roundtable(STAR) process. Through STAR, an integratedframework and process has been created allowing forcapabilities and technologies to be linked andassessed, gaps to be identified, specifications andmetrics to be established, and provide a means toprioritize and implement technology development andmissions. A critical part of the STAR effort has beenthe establishment of the Strategic Framework thatorganizes all work under four major Thrusts (Go,Land, Live, and Explore) and identifies the drivingOutcomes for each of these Thrusts. From the Thrustsand Outcomes, all work can be categorized and linkedbetween Capability Areas, and Technology Gaps canbe identified and addressed (Figure 1.)Figure 1. Strategic Framework and STAR FrameworkISRU Envisioned Future: To drive thedevelopment of technologies and capabilities, theSTAR process starts with establishing a ‘grand vision’of where each Outcome and Capability is aiming tobe considered complete. For ISRU, the EnvisionedFuture is “Scalable ISRU production/utilizationcapabilities including sustainable commodities on thelunar and Mars Surface”. This involves starting with10’s of metric tons of products, but evolves into 100’sto 1000’s of metric tons of water, oxygen, propellants,construction and manufacturing feedstock, andcommodities for habitat and food production andoperations. For ISRU, the ‘Prospect to Product’philosophy starts with Destination Reconnaissance &Resource Assessment, followed by ResourceAcquisition, Isolation, and Preparation, leading intoResource Processing (which is further subdivided intomission consumables and feedstocks for constructionand manufacturing). The ISRU Envisioned Futurealso considers what resources are available andattempts to address what and when these resourceswill be evaluated and harnessed, as well asconsidering which products/commodities can beobtained for early use and which ones require moretime and/or users of refined products.It Takes an Architecture: ISRU does not existon its own. By definition, it requires customers/users SHORT TITLE HERE: A. B. Author and C. D. Authorto use the products/commodities produced by ISRUsystems. Also, for an ISRU capability to exist, itmust obtain products and services from other systemsand infrastructure. An important aspect of the STARprocess and the ISRU Envisioned Futures Prioritiesstrategy is to identify and link all of these systems andcapabilities to achieve the desired end state (Figure2).Figure 2. ISRU as Part of a Larger ArchitectureISRU Capability Drivers: The guidingprinciples for NASA’s Space TechnologyDevelopment for Artemis are to develop criticaltechnologies and capabilities that enable (i) asustainable Lunar surface presence, (ii) the future goalof sending humans to Mars, and (iii) promotingcritical technologies to enable future science andcommercial missions. It is a major goal of theArtemis campaign to establish some sort of base campat the lunar South Pole by approximately the end ofthe decade. The ISRU Envisioned Futures Prioritiesstrategy is aligned with the Artemis campaign todevelop and demonstrate ISRU capabilities in thistimeframe that could lead to sustained surfaceoperations, infrastructure growth, and commercialoperations in the next decade (Figure 3).Figure 3. ISRU Dual Path to Full Implementation and CommercializationState of the Art and Gaps: To achieve theenvisioned future, an extensive effort was performedto understand the State of the Art (SOA) for ISRUgoing back decades, and to assess the SOA against thenear and long-term goals and objectives of the ISRUStrategic Outcome objectives. While the releasedISRU Envisioned Futures Priorities only includes atop-level definition of both the SOA and Gaps, furtherinformation on these for ISRU can be found in theISRU Gap Assessment Study performed for theInternational Space Exploration Coordination Group(ISECG) [2]. To provide further guidance to industryand academia, a top level assessment was performedand provide that divides critical areas of ISRUcapabilities and technologies into 3 categories:Significant Funding, Partially Covered/MoreRequired, and Limited/No Funded Activities.Envisioned Future Priorities- Next Steps forISRU: While a significant amount of work over abroad range of technology areas has been performedover the last several years for lunar ISRU, to reach theenvisioned future for ISRU, a lot more work isrequired at the technology level leading to bothsystems and technology demonstrations in the nearfuture. To guide investments within NASA, industry,and academia, 5 specific areas of high priority wereidentified. These are:1.Complete development of the Water and Oxygen Mining Paths and close technology gaps, with emphasis on oxygen extraction from Highland regolith and parallel paths for polar water mining.2.Expand development of metal extraction and feedstock for manufacturing and construction, with emphasis on aluminum and initial/easy to obtain/make construction feedstocks leading to more refined metals and other regolith resources. Also, evaluate biologically inspired/derived technologies in bio-mining, bio-plastic, and other feedstock commodities.3.Ensure the resource assessment needed for future ISRU commercial operations is coordinated with both near/long-term science objectives as well as Artemis mission locations of interest.4.Initiate NASA and industry-led system-level analyses, integration, and testing activities for ISRU capabilities. While significant work has been performed at the technology and subsystemlevel, it is now important to understand how these technology investments can be leveraged and utilized in actual systems and applications5.Initiate lunar ISRU technology flight demonstrations leading to initial ‘Pilot Plant’ end-to-end production capability demonstrations, led by industry

ISRU

In Situ Resource Utilization (ISRU) Envisioned Future Priorities

The National Aeronautics and Space Administration (NASA) of the United States of America (US) has initiated the Artemis Moon to Mars program to send astronauts (the first woman and person of color) back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface in the 2030’s. A major objective of this program is to characterize the resources that exist on the Moon and Mars, and learn how to utilize them for sustained and affordable exploration. Commonly known as In Situ Resource Utilization (ISRU), the search for, acquisition, and processing of resources in space has the potential to greatly reduce the dependency on transporting mission consumables and infrastructure from Earth, thereby reducing mission costs, risks, and dependency on Earth. Through the extraction and processing of resources into mission commodities such as rocket propellants, life support consumables, and fuel cell reactants, ISRU enhances and evolves the cis-lunar, lander, and surface transportation systems required for human exploration; expanding and ehancing HOW humans get to, explore, and return from the Moon. Through the extraction and processing of resources into metals, silicon, and other manufacturing and construction feedstock, ISRU enhances and allows for the expansion of critical infrastructure through in situ manufacturing and construction capabilities needed for WHAT humans do on the Moon and in cis-lunar space. Because of this, ISRU supports and enables commercial involvement beyond NASA and governmental agencies by both lowering the cost of sustained transportation to/from/on the Moon as well as supporting the market required for needing these transportation systems. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) ensures the coordinated development of ISRU and other critical space and surface infrastructure elements such as propulsion, power, manufacturing, construction, and robotics through the Strategic Technology Architecture Roundtable (STAR) process. Through STAR, an integrated framework and process has been created allowing for capabilities and technologies to be linked and assessed, gaps to be identified, specifications and metrics to be established, and provide a means to prioritize and implement technology development and missions. For lunar ISRU, three primary areas of development have been initiated, (1) understanding, mapping, extracting, and processing water and other volatiles found in polar permanently shadowed regions (PSRs), (2) methods, technologies to extract oxygen from regolith, and (3) methods, technologies, and use cases for metals, silicon, and other feedstock commodities extracted and produced from lunar resources. This presentation will briefly discuss the STAR process and elaborate on the current status and future plans for ISRU development, demonstration, and architecture implementation of NASA’s Envisioned Future Priorities plan for ISRU.

In Situ Resource Utilization

NASA Electric Vertical Takeoff and Landing (eVTOL) Aircraft Technology for Public Services – A White Paper

History has shown that our personal life is highly dependent on the technology that people have developed. A strategic scan of the aerospace environment at the beginning of the 21st century strongly suggests that the world might be approaching a new age of airpower—the era of electrified/hybrid aircraft propulsion. Undeniably, starting from the Montgolfier Brothers balloon flight in 1783, to the Wright Brothers piston engine flight in 1903, and the jet engine of the 1960s, or the space age of today, one can say that leaps in propulsion technology have marked the different ages of human flight. The technological advancements, brought at the beginning of 21st century by the revolution in data exchange, computational power, sensors, wireless communication, internet, and autonomy, contributed to the vision of this new age of propulsion we are approaching. Historically, conventional vertical takeoff and landing (VTOL) aircraft have been equipped with propulsion units relying on complex internal combustion machines (turbines, piston engines, for example), and complex mechanical arrangements (gearboxes, shafts, variable pitch propeller). By contrast, electric VTOL aircraft (eVTOL)1 rely on simpler propulsion units (electric motors and in some cases fixed-pitch propellers). This promotes redundancy and improves tolerance to failures, in turn improving safety. The use of simpler electric propulsion units should also allow significant acquisition and operating cost reductions. Whether full-electric (relying solely on batteries) or hybrid-electric (relying on a combination of batteries, fuel-powered engines, and generators.), eVTOLs are also expected to generate less noise and air pollution than conventional aircraft with similar payloads. According to the 2019 Annual Review of IATA (International Air Transport Association) [ref.1], due to an expected increase in air transport traffic by 5% every year and a doubling of air transport passenger numbers to 8.2 billion by 2037 significant challenges are posed to the aviation industry. Furthermore, this report does not factor in the expected demand for short-range (intra-city) air transportation, which is in development and yet to be operational. The increased demand to fly creates a responsibility to expand in a sustainable manner and an endeavor to develop more environmentally-friendly aircraft. eVTOL aircraft, either piloted or autonomous, is gathering considerable interest worldwide. Modern and novel full-electric or hybrid-electric eVTOL configurations enable a new paradigm shift in air transportation as the aviation industry remains committed to its goals of carbon-neutral growth from 2020 onwards and cutting CO2 emissions to half 2005 levels by 2050. While electric power has been used for decades, recent developments in mobile electric/hybrid propulsion coupled with advanced materials and autonomous systems may create the possibility to transition into the next age of air mobility propelled by electric/hybrid VTOL aircraft technology. Although eVTOL aircraft might seem like an incremental improvement or even a counterintuitive regression with regard to past VTOL development, it has in fact the potential to transform air mobility across a wide range of government applications. Previous transformations in aviation generated dramatic leaps in performance, but the cost was commensurate with performance, limiting quantity produced. This next age appears to take a different approach. Performance may not increase, but at this moment technology is poised for future urban mobility that will spawn commercial passenger drone services, that is, autonomous (pilotless) air taxis and thereby add a new dimension to the urban transportation mix of the future [ref. 2]. Advances in electric propulsion, autonomous flight technology, and 5G communication networks will enable this fast new-growing market to become a reality. It is now time to envision the introduction of electric/hybrid eVTOL aircraft for Public Services2. We believe that in the next decades eVTOL aircraft will have the potential to become an essential tool to Public Service agencies around the world in applications such as firefighting, public safety, search and rescue, disaster relief and law enforcement. This is due to several major factors. • First, with the increasing popularity of small, unmanned aircraft vehicles (UAVs) or drones, many companies today are focusing on the development of passenger UAVs designed to accommodate up to five passengers or equivalent cargo payload. Many such configurations are electric or hybrid-electric designs with VTOL capabilities. Several of these projects have started a flight test program and many more are expected to be in the experimental and development phase in 2020. Such revolutionary vehicles could be in commercial operations by 2030. These eVTOL systems could be ready for selected Public Services missions even sooner. • Second, although these advanced eVTOL vehicles under development still need access to fuel (hybrid) and/or electric charging capability, they can take off and land from almost anywhere. Therefore, such vehicles, both manned and unmanned can be successfully integrated for the critical missions of the Public Services with extra deployment flexibilities. • Third, advancement in electric propulsion systems in the automotive industry together with NASA’s leading efforts in electrification of aircraft propulsion systems, FAA’s ongoing active eVTOL certification programs, and EASA’s proposed framework for the certification of electric/hybrid small category VTOL aircraft in Europe [ref. 3] will help accelerate industry electric propulsion system development and integration. • Finally, eVTOL vehicles could be deployed for Public Services sooner than air taxi or other commercial applications, since Public Services missions may be more easily approved based on specific mission criteria, localized airworthiness authority for public-use aircraft3, and are normally operating under centralized airspace management and control by the theater command. Moreover, public perception and acceptance are generally less of a concern when operations save lives and benefit the wider community. The prioritized introduction of eVTOL aircraft in Public Services is ambitious, but we believe it is achievable in the coming decades if fundamental enablers (people and technologies) are engaged in defining the objectives and needs of these missions. The revolution that is currently taking place in eVTOL aircraft represents an unprecedented opportunity to develop a safer, more affordable, more available and more environmentally friendly future of vertical flight. To ensure that these novel aircraft meet the future expectations of Public Services, it is essential to take a collaborative and multi-disciplinary approach to their development, across engineering disciplines, policy-making, program management, business case development, manufacturing, and flight demonstrations. It should be noted that the term eVTOL (in the near term) used throughout this publication implies aircraft capable of transporting up to 5 persons which may or may not include a pilot if operated fully autonomously, assuming an average of 200 pounds (91 kg) per person or equivalent payload and a range up to 60 miles plus a suitable reserve. Hybrid or hydrogen powered eVTOLs would have greater range. For example, a “3-seat” eVTOL aircraft may only be able to carry two fully equipped firemen, and payload capacity is more relevant when used for the supply mission. Moreover, this paper concentrates on the “last-mile” solutions with a deployment time of no more than 6 hours. Although not specifically discussed in this document, it is understood that the future of Transformative Vertical Flight in general and Public Services, in particular, will also involve smaller UAVs that will undoubtedly play a crucial role in future aerial operations. For example, smaller unmanned aircraft may be used to dispatch medical supplies, portable filtration systems or perform the Search task of future Search and Rescue (SAR) operations. Close collaboration between the aircraft industry, the Civil Aviation Authorities (CAA), e.g., Federal Aviation Administration (FAA), European Aviation Safety Agency (EASA), Transport Canada Civil Aviation (TCCA) and the Department of Defense (DoD) certifiers, will help identify Public Services requirements, define expectations and limit development cost and timescales. Take the US Air Force Agility Prime as an example, the majority of the eVTOL application opportunities and mission elements identified are in line with the NASA TVF WG-4 objectives and use cases. Together, it forms a strong partnership to accelerate the development, certification, and practical deployment for public service missions. The US Air Force Agility Prime has been a collaboration partner on this white paper, and provided valuable input and recommendations. Most of the eVTOL public service mission elements discussed in this paper and additional use cases envisioned by the NASA TVF WG-4 team are shared by the Agility Prime program. The focus and efforts of the Agility Prime in product and system development, industry and government partnership, accelerated certifications as well as early test and deployment are totally in sync with the path forward recommended by this white paper. This kind of collaboration and partnership will help enable the practical use of the eVTOL for public service missions, benefit the eVTOL public acceptance, and accelerate the eVTOL industry revolution.

Johnny T. Doo