Search NASA⌕ Search

SEARCH · Search NASA

Results for “WEC modelling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

HERO WEC V1.0 - SolidWorks Model

The attached zip file includes a SolidWorks pack-and-go assembly of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter) V1.0. This model does not include all aspects of the design (i.e. RO (reverse osmosis) system, electrical enclosure, hose, cable) it only includes the WEC and PTO (power take-off) design.

16 TIDAL AND WAVE POWER↗

Wave energy in season: a comparative approach to feasibility of seasonal deployments for remote coastal communities

Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.

WEC optimizations↗

OES Task 10 WEC Heaving Sphere Performance Modelling Verification

OES Task 10 Modelling, Verification and Validation of Wave Energy Converters (WECs) is a task under the IEA Technology Collaboration Program for Ocean Energy Systems (OES). The long-term goals are to assess the accuracy of, and establish confidence in, the use of numerical WEC models. to determine a range of validity of existing computational modelling tools, to identify uncertainty related to simulation methodologies and finally to define future research. To some extent, this project builds on the experience from a similar effort carried out to verify modelling of wind turbines as part of the IEA Wind Task 30 on wind OC3-OC5.

16 TIDAL AND WAVE POWER↗

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments in 2022 and 2024 at the Jennette's Pier test site in North Carolina demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and power take-off response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Specifically, insights from these efforts are now informing the second-generation HERO WEC (V2) to increase robustness and overall survivability. Changes from the original prototype include improved drivetrain components, refined geometry, enhanced control systems, and design. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER↗

Advancing the HERO WEC Through Integrated Modeling, Testing, and Field Deployments: Preprint

The Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC) was developed by the National Laboratory of the Rockies as a modular platform for advancing wave-powered desalination technologies. Designed to operate in either a hydraulic or electric configuration, the system enables direct comparison of mechanical-to-water and electrical-to-water conversion pathways using a single hardware architecture. Deployments at the Jennette's Pier test site in 2022 and 2024 demonstrated freshwater production between 60 and 300 gallons per day, including successful operation in wave heights as low as 0.25 m. A structured evaluation approach combining numerical modeling of hydrodynamic and PTO response, controlled laboratory testing, and in-ocean field deployments has been used to characterize and refine system performance. Insights from these efforts are now informing the second-generation HERO WEC (V2), which incorporates improved drivetrain components, refined geometry, enhanced control systems, and design updates aimed at increasing robustness and long-duration survivability. The HERO WEC platform continues to serve as an open-access research asset supporting broader marine energy and desalination development.

16 TIDAL AND WAVE POWER↗

Numerical Model of IProTech PIP WEC Device

iProTech PIP wave energy converter (WEC) is a slack moored, single hull device with no moving parts in the water, joints or bearings. This submission includes data of the simulation, reports, and code for the iProTech PIP (WEC) project. The organization of the data included in the provided archive is detailed below and in the data description of the archive. The data teamer-iprotech-nrel folder includes and explains matlab and python code developed to hydrodynamically model the PIP WEC device in WEC-Sim. The subfolders cover the following steps: 1) report: explanatory information on device geometry 2) pip_mesher: python code to generate mesh panels from device profile data 3) wec-sim_models: matlab code to run WEC-Sim The data uploaded is a snapshot as of 11/02/2121 of code residing in a Github repository administered by David Ogden of NREL.

16 TIDAL AND WAVE POWER↗

WEC Extreme Conditions Modeling Sandia Summer Intern 2017 Report

This report contains work completed by a group of student interns during the summer of 2017. Under the guidance of Ryan Coe, Aubrey Eckert-Gallup, and Nevin Martin, a series of interrelated projects were completed on topics relating to extreme response and survival analysis of wave energy converters (WECs). Jarred Canning studied long-term design response analysis methods for WECs. Sam Edwards studied how variation in the selection of an environmental contour affects the characterization of WEC response in extreme conditions. Sam also led the integration of various components of this report and overall editing. Tyler Esterly produced a catalog of analyses for different ocean sites. Bibiana Seng studied clustering analyses for comparing the wave environments of different ocean sites. Lori Smith performed a comparison between analyses conducted using spectral wave data and analyses using deterministic time-domain wave data. William ("Zach") Stuart studied the sensitivity and convergence of environmental contour methods.

16 TIDAL AND WAVE POWER↗

Numerical Modeling & Optimization of the iProTech Pitching Inertial Pump (PIP) Wave Energy Converter (WEC) (CRADA Final Report)

This project represents a continuation of the collaboration between iProTech and NLR to simulate, optimize and design the iProTech Pitching Inertial Pump (PIP) device. The objectives of this TEAMER project are twofold: 1. Refining the physical characteristics of the existing iProTech PIP WEC-Sim model to enhance the model’s fidelity and include controllable components. Key model enhancements target the inclusion of Coulomb friction, the introduction of a controllable bypass valve, and the replacement of traditional check valves with advanced motorized ones. 2. Exploring traditional and advanced control algorithms. From traditional methods like latching control to cutting-edge reinforcement learning (RL) algorithms, the goal is to ensure the PIP device's adaptability and optimal performance across a range of ocean conditions. NLR is tasked with augmenting the WEC-Sim model and implementing the control algorithms, culminating in performance comparison analyses. iProTech will update their existing 3D models, advise on model improvements, and determine crucial system metrics. WEC-Sim, developed in MATLAB/SIMULINK with Simscape Multibody, is the main piece of software that will be used in this project. Coupled with the MATLAB RL Toolbox, it offers a robust platform for in-depth simulation and optimization of the iProTech PIP device. Building on previous work to explore the PIP design space and optimize its geometry, mass distribution, center of gravity and other key parameters, this project aims to refine iProTech’s existing numerical models and develop effective control algorithms that can seamlessly integrate into their future hardware testing campaigns.

16 TIDAL AND WAVE POWER↗

TEAMER - AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Sim Model

Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of a utility scale wave energy converter (WEC). SNL and NREL in collaboration with AquaHarmonics, will set up and run WEC Simulator (WEC-Sim) models of the AquaHarmonics WEC, building off past model developments for inclusion of custom PTO (power take-off) dynamics. The intent is to review, update, and verify or validate a new WEC-Sim model against wave tank experimental data. Furthermore, the WEC-Sim model will be coupled to an energy storage system model to better understand the wave-to-wire functionality. Project is part of the TEAMER (Testing & Expertise for Marine Energy) RFTS (request for technical support) system of WEC research projects. Testing data can be found in the associated MHKDR link below.

16 TIDAL AND WAVE POWER↗

TEAMER - AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Test Logs and Results

Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of a utility scale wave energy converter (WEC). SNL and NREL in collaboration with AquaHarmonics, will set up and run WEC Simulator (WEC-Sim) models of the AquaHarmonics WEC, building off past model developments for inclusion of custom PTO (power take-off) dynamics. The intent is to review, update, and verify or validate a new WEC-Sim model against wave tank experimental data. Furthermore, the WEC-Sim model will be coupled to an energy storage system model to better understand the wave-to-wire functionality. This data set is described in the "Test Log" excel file. Please refer to that document for details on each specific test date/time, constraint parameters and model hardware setup details. Sim model can be found in the associated MHKDR link below.

16 TIDAL AND WAVE POWER↗

Modeling and Design of the Triton OWC System (Final Report)

Two versions of the Triton Oscillating Water Column type device will be modeled in WEC Sim. First, a model of a wave-tank scale device which can be tuned and validated against tank test data. Second, a model of the deployment-scale device will be constructed following the method of the tank-scale device to ensure that relevant physics are captured. In the latter case, the geometry, PTO architecture, and other design details are not yet finalized, so the model will serve as a platform for design iteration as time and budget allows. A subset of this iteration will be automated using existing WEC-Sim capabilities. A primary focus of this work will be familiarizing Triton personnel with the WEC-Sim workflow and model details so that the model of the deployment device can continue to be enhanced after project end.

16 TIDAL AND WAVE POWER↗

Implementing Nonlinear Buoyancy and Excitation Forces in the WEC-Sim Wave Energy Converter Modeling Tool: Preprint

Wave energy converters (WECs) are commonly designed and analyzed using numerical models that combine multi-body dynamics with hydrodynamic models based on the Cummins Equation and linearized hydrodynamic coefficients. These modeling methods are attractive design tools because they are computationally inexpensive and do not require the use of high performance computing resources necessitated by high-fidelity methods, such as Navier Stokes computational fluid dynamics. Modeling hydrodynamics using linear coefficients assumes that the device undergoes small motions and that the wetted surface area of the devices is approximately constant. WEC devices, however, are typically designed to undergo large motions in order to maximize power extraction, calling into question the validity of assuming that linear hydrodynamic models accurately capture the relevant fluid-structure interactions. In this paper, we study how calculating buoyancy and Froude-Krylov forces from the instantaneous position of a WEC device (referred to as instantaneous buoyancy and Froude-Krylov forces from herein) changes WEC simulation results compared to simulations that use linear hydrodynamic coefficients. First, we describe the WEC-Sim tool used to perform simulations and how the ability to model instantaneous forces was incorporated into WEC-Sim. We then use a simplified one-body WEC device to validate the model and to demonstrate how accounting for these instantaneously calculated forces affects the accuracy of simulation results, such as device motions, hydrodynamic forces, and power generation.

13 HYDRO ENERGY↗

Centipod WEC, Advanced Controls, WaveDyn Models

Archive containing the WaveDyn models used for analysis of the Centipod WEC with and without Advanced Controls, i.e. the WaveDyn files contain a baseline model which can be run alone, and a model predictive control (MPC) model which must be run when connected to the MPC controller. The controller dynamic link library (DLL) is also contained within this archive. The code archive for the MPC controller is linked in this submission.

16 TIDAL AND WAVE POWER↗

HERO WEC V1.0 2024 - WEC-Sim Detailed Simulation Runs and Summary Data

This dataset includes results from simulations of NREL's hydraulic and electric reverse osmosis wave energy converter (HEREO WEC). Simulation runs include 135 wave cases that were based on the updated WEC-Sim model, which is linked below. The data represented in this repository is based on an updated WEC-Sim model using laboratory data to tune and refine the original WEC-Sim model for the V1.0 HERO WEC. The 135 wave cases represent waves with the following wave height and wave period ranges: - Significant Wave Height: 0.25 - 3.75m in 0.25m increments - Wave Period: 5 - 13 sec in 1 sec increments Each run was simulated using a Pierson-Moskowitz irregular wave spectrum with a 100 second ramp time, a total simulation time of 3,100 seconds, and a simulation time-step of 0.005s. A reference table has been included to map each multi condition run (MCR) case with each wave condition. Summary data set includes a spreadsheet and image files with matrices that are associated with data from simulation runs. All matrices cover the same significant wave height and wave periods from the simulation runs, in the same increments. The following matrices are included: - Power Abs: The average absorbed power from the WEC (calculated from anchor reaction force and heave velocity) - Power Hyd: The average hydraulic power output at pump (calculated from pump output flow and pressure) - Power - Hyd ROi: The average hydraulic power measured at the RO system inlet (calculated from RO system pressure and flow (pre-accumulator)) - Flow - Pump out: The average flowrate measured at the pump outlet - Flow - Perm: The average permeate (clean water) production - Flow - RO (pre): The average flowrate measured at the inlet of the RO system before the accumulators - Flow - RO (post): The average flowrate measured after the accumulator bank in the RO system - Pressure - RO: The average pressure measured at the inlet of the RO system This data set has been developed by the National Renewable Energy Laboratory, operated by the Alliance for Sustainable Energy, LLC, for the U.S. Department of Energy (DOE) under Contract No. DE-AC36-08GO28308. Funding provided by the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Water Power Technologies Office.

16 TIDAL AND WAVE POWER↗

NREL's Water Power Software Makes a Splash; NREL Highlights, Research & Development, NREL (National Renewable Energy Laboratory)

WEC-Sim is a DOE-funded software tool being jointly developed by NREL and SNL. WEC-Sim computationally models wave energy converters (WEC), devices that generate electricity using movement of water systems such as oceans, rivers, etc. There is great potential for WECs to generate electricity, but as of yet, the industry has yet to establish a commercially viable concept. Modeling, design, and simulations tools are essential to the successful development of WECs. Commercial WEC modeling software tools can't be modified by the user. In contrast, WEC-Sim is a free, open-source, and flexible enough to be modified to meet the rapidly evolving needs of the WEC industry. By modeling the power generation performance and dynamic loads of WEC designs, WEC-Sim can help support the development of new WEC devices by optimizing designs for cost of energy and competitiveness. By being easily accessible, WEC-Sim promises to help level the playing field in the WEC industry. Importantly, WEC-Sim is also excellent at its job! In 2014, WEC-Sim was used in conjunction with NREL’s FAST modeling software to win a hydrodynamic modeling competition. WEC-Sim and FAST performed very well at predicting the motion of a test device in comparison to other modeling tools. The most recent version of WEC-Sim (v1.1) was released in April 2015.

16 TIDAL AND WAVE POWER↗

Numerical Analysis on Hydraulic Power Take-Off for Wave Energy Converter and Power Smoothing Methods: Preprint

One of the primary challenges for wave energy converter (WEC) systems is the fluctuating nature of wave resources, which require the WEC components to be designed to handle loads (i.e., torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater power take-off (PTO) capacity than the average power output and indicates a higher cost for the PTO. Moreover, additional design requirements, such as battery storage, are needed, particularly for practical electrical grid connection, and can be a problem for sensitive equipment (e.g., radar, computing devices, and sensors). Therefore, it is essential to investigate potential methodologies to reduce the overall power fluctuation while trying to optimize the power output from WECs. In this study, a detailed hydraulic PTO model was developed and coupled with a time-domain hydrodynamics model (WEC-Sim) to evaluate the PTO efficiency for WECs and the trade-off between power output and fluctuation using different power smoothing methods, including energy storage, pressure relief mechanism, and a powerbased setpoint control method. The study also revealed that the maximum power fluctuation for WECs can be significantly reduced by one order of magnitude when these power smoothing methods are applied.

16 TIDAL AND WAVE POWER↗