Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: • Federal land jurisdiction, • Existing Section 368 corridors, • Existing transmission lines, • Previously studied corridor locations, and • Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: • The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. • Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. • Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Developing High PV Penetration Cases for Frequency Response Study of U.S. Western Interconnection

Recent large penetrations of solar photovoltaic (PV) generation and the inertial characteristics of inverter-based generation technologies have caught the attention of those in the electric power industry in the United States. This paper presents a systematic approach to developing test cases of high penetrations of PV for the Western Interconnection. First, to examine the accuracy of the base case model, the Western Electricity Coordinating Council (WECC) model is validated by using measurement data from synchronized phasor measurement units. Based on the 2022 Light Spring case, we developed four high PV penetration cases for the WECC system that are of interest to the industry: 5% PV+15 % wind, 25% PV+15% wind, 45% PV+15% wind, 65% PV+15% wind). Additionally, a method to project PV is proposed that is based on collected, realistic PV distribution information, including the current and future PV power plant locations and penetrations in the WECC system. Both the utility-scale PV plant and residential rooftop PV are included in this study.

14 SOLAR ENERGY↗

Renewable Source Controls for Grid Stability

The goal of this study was to evaluate the small signal and transient stability of the Western Electricity Coordinating Council (WECC) under high penetrations of renewable energy, and to identify control technologies that would improve the system performance. The WECC is the regional entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. Transient stability is the ability of the power system to maintain synchronism after a large disturbance while small signal stability is the ability of the power system to maintain synchronism after a small disturbance. Transient stability analysis usually focuses on the relative rotor angle between synchronous machines compared to some stability margin. For this study we employed generator speed relative to system speed as a metric for assessing transient stability. In addition, we evaluated the system transient response using the system frequency nadir, which provides an assessment of the adequacy of the primary frequency control reserves. Small signal stability analysis typically identifies the eigenvalues or modes of the system in response to a disturbance. For this study we developed mode shape maps for the different scenarios. Prony analysis was applied to generator speed after a 1.4 GW, 0.5 second, brake insertion at various locations. Six different WECC base cases were analyzed, including the 2022 light spring case which meets the renewable portfolio standards. Because of the difficulty in identifying the cause and effect relationship in large power system models with different scenarios, several simulations were run on a 7-bus, 5-generator system to isolate the effects of different configurations. Based on the results of the study, for a large power system like the WECC, incorporating frequency droop into wind/solar systems provides a larger benefit to system transient response than replacing the lost inertia with synthetic inertia. From a small signal stability perspective, the increase in renewable penetration results in subtle changes to the system modes. In general, mode frequencies increase slightly, and mode shapes remain similar. The system frequency nadir for the 2022 light spring case was slightly lower than the other cases, largely because of the reduced system inertia. However, the nadir is still well above the minimum load shedding frequency of 59.5 Hz. Finally, several discrepancies were identified between actual and reported wind penetration, and additional work on wind/solar modeling is required to increase the fidelity of the WECC models.

power system stability↗

Analysis of Benefits of an Energy Imbalance Market in the NWPP

The Northwest Power Pool (NWPP) Market Assessment Committee (MC) Initiative, which was officially launched on March 19, 2012, set out to explore a range of alternatives that could help the Balancing Authorities and scheduling utilities in the NWPP area address growing operational and commercial challenges affecting the regional power system. The MC formed an Analytical Team with technical representatives from each of the member Balancing Areas in the NWPP and with staff of Pacific Northwest National Laboratory (PNNL). This Analytical Team was instructed to conduct extensive studies of intra-hour operation of the NWPP system in the year 2020 and of the NWPP region with 14,671 MW of wind penetration. The effort utilized a sub-hourly production cost model (the PLEXOS® computer model) that inputs data from the Western Electricity Coordinating Council (WECC)-wide Production Cost Model (PCM) to evaluate potential production cost savings. The Analytical Team was given two general options to evaluate: •Energy Imbalance Market (EIM): establishment of an automated, organized NWPP area market for economically supplying energy imbalance within the hour. •Enhanced Market-Operational Tools (EMT) that might augment or replace an EIM. The Analytical The Analytical Team built on the WECC-wide PCM data from prior work done in the WECC and carried forward the evolution of the original WECC Transmission Expansion Planning Policy Committee (TEPPC) 2020 PC0 data base. A large number of modifications and improvements were made to this case and the data were subjected to extensive review by the team members to improve the model representation of the Northwest (NW). MC meetings that were open to the public were held for interested parties to review and provide input to the study. Results for the test, base, and sensitivity case studies performed by the MC Initiative Analytical Team indicate that there are a wide range of benefits that could be obtained from the operation of an EIM in the NWPP depending on what assumptions are made. The instructions from the MC were to determine a "minimum high confidence" range of potential benefits. The results for the Base Case indicate that the EIM benefits ranged from approximately $40 million to $70 million in annual savings from the operation of an EIM in the NWPP footprint. A number of additional relevant sensitivity cases were performed, including low and high water conditions, low and high natural gas prices, and various flex reserve requirements, resource operations, and amounts of resource capability held back during the preschedule period. Along with the results for the Base Case, the results for these studies yielded EIM benefits that clustered within the range of $70 to $80 million dollars per year with potential benefits ranging from approximately $125 million to as little as $17 million per year. Because the design and operation of an EIM could enable participating Balancing Authorities (BAs) to collectively lower the quantity of resources they must carry to meet within-hour balancing needs, a sensitivity case was also performed to analyze the impact that such reductions might have on the benefits from an EIM. The results for this sensitivity case indicate that such reductions could increase the benefits from the operation of an EIM in the NWPP into the range of approximately $130 million to $160 million per year. Also, a sensitivity case for a WECC-wide EIM was performed with the results indicating that the potential benefits to the NWPP could increase into the range of $197 million to $233 million per year. While there may be potential reliability benefits from the coordinated dispatch process underlying the operation of an EIM, reliability benefits from an EIM were out of the scope of this study. The EIM benefit analyses that were performed by the Analytical Team are provided in this report.

Power markets, NWPP, Energy Imbalance, EIM, Renewa↗

Balancing Authority Cooperation Concepts to Reduce Variable Generation Integration Costs in the Western Interconnection: Consolidating Balancing Authorities and Sharing Balancing Reserves

The study described in this chapter demonstrates the benefits of BA consolidation with the help of a detailed WECC system model and advanced methodology, which is also described in this chapter. The study aims to determine the potential savings in production cost and reduction in balancing reserve requirements in the WECC system. The study has found that effective use of the diversity in load and variable generation over a wide area can indeed help to achieve significant savings. The implementation cost for the consolidation was beyond the scope of this study. The analysis was performed for two different scenarios of VG penetration: 11% (8% wind and 3% solar) and 33% (24% wind and 9% solar) of WECC projected energy demand in 2020. In analysis of balancing reserves, the objective was to determine the reduction in balancing reserve requirements due to BA consolidation, in terms of required capacity and ramp-rates. Hour-ahead and 10-minute ahead forecast errors for load, wind, and solar were simulated. In addition, 1-minute resolution load, wind and solar data were used to derive balancing reserve requirements i.e. load-following and regulation requirements for each individual BA and for the consolidated BA (CBA). The reduction in balancing reserves was determined by calculating the difference between total reserve requirements that need to be carried by different BAs if they operate individually, and reserve requirements that need to be carried by the CBA. The study results show that the consolidated WECC system would have about a 50% overall reduction in balancing reserves for the 11% penetration scenario and a 65% reduction for the 33% penetration scenario in comparison with total reserve requirements that need to be carried by different BAs if they operate individually.

balancing authorities consolidation↗

Renewable Generation Effect on Net Regional Energy Interchange: Preprint

Using production-cost model (PLEXOS), we simulate the Western Interchange (WECC) at several levels of the yearly renewable energy (RE) generation, between 13% and 40% of the total load for the year. We look at the overall energy exchange between a region and the rest of the system (net interchange, NI), and find it useful to examine separately (i) (time-)variable and (ii) year-average components of the NI. Both contribute to inter-regional energy exchange, and are affected by wind and PV generation in the system. We find that net load variability (in relatively large portions of WECC) is the leading factor affecting the variable component of inter-regional energy exchange, and the effect is quantifiable: higher regional net load correlation with the rest of the WECC lowers net interchange variability. Further, as the power mix significantly varies between WECC regions, effects of ‘flexibility import’ (regions ‘borrow’ ramping capability) are also observed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Balancing authorities, hurdle rates, economic disp↗

Adaptive RAS/SPS System Settings for Improving Grid Reliability and Asset Utilization through Predictive Simulation and Controls

Remedial Action Schemes (RAS) or Special Protection Schemes (SPS) are used throughout the bulk transmission system as a non-wires method of increasing transmission transfer capability. However, as the population grows within the Western Interconnection, more power needs to be transferred with less ability to build lines. This leads to a greater number of RAS, and the subsequent interaction between these disparate schemes can have unintended consequences. While the large number of RAS within the Western Electricity Coordinating Council (WECC) protect for different things, which can range from the violation of thermal limitations to transient stability issues, they can be described by common methods of operation. In order to understand these methods, a survey was sent out to members of the WECC Modeling & Validation Working Group (MVWG). The response received provides a necessary base in which to understand and build models that can be used within WECC. This report provides information on the survey results regarding RAS/SPS modeling practices for planning and operational studies within the WECC footprint, which is foundational for on-going and future work on RAS. Pacific Northwest National Laboratory (PNNL) and its industry partners are developing innovative methods for adaptively setting RAS parameters based on realistic and near real-time operational conditions to improve power grid reliability and grid asset utilization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Vulnerability Assessment Based on Power Flow and Voltage Distribution

Risk assessment of large scale power systems has been an important problem in power system reliability study. Probabilistic technique provides a powerful tool to solve the task. In this paper, we present the results of a study on probabilistic vulnerability assessment on WECC system. Cumulant based expansion method is applied to obtain the probabilistic distribution function (PDF) and cumulative distribution function (CDF) of power flows on transmission lines and voltage. Overall risk index based on the system vulnerability analysis is calculated using the WECC system. The simulation results based on WECC system is used to demonstrate the effectiveness of the method. The methodology can be applied to the risk analysis on large scale power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-Water Impacts on Interconnection-Scale Electricity System Planning

A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities for Joint Water–Energy Management: Sensitivity of the 2010 Western U.S. Electricity Grid Operations to Climate Oscillations

The 2016 SECURE Water Act report’s natural water availability benchmark, combined with the 2010 level of water demand from an integrated assessment model, is used as input to drive a large-scale water management model. The regulated flow at hydropower plants and thermoelectric plants in the Western U.S. electricity grid (WECC) is translated into potential hydropower generation and generation capacity constraints. The impact on reliability (unserved energy, reserve margin) and cost (production cost, carbon emissions) of water constraints on 2010-level WECC power system operations is assessed using an electricity production cost model (PCM). Use of the PCM reveals the changes in generation dispatch that reflect the inter-regional interdependencies in water-constrained generation and the ability to use other generation resources to meet all electricity loads in the WECC. August grid operational benchmarks show a range of sensitivity in production cost (-8 to +11%) and carbon emissions (-7 to 11%). The reference reserve margin threshold of 15% above peak load is maintained in the scenarios analyzed, but in 5 out of 55 years unserved energy is observed when normal operations are maintained. There is 1 chance in 10 that a year will demonstrate unserved energy in August, which defines the system’s historical performance threshold to support impact, vulnerability, and adaptation analysis. For seasonal and longer term planning, i.e., multi-year drought, we demonstrate how the Water Scarcity Grid Impact Factor and climate oscillations (ENSO, PDO) can be used to plan for joint water-electricity management to maintain grid reliability.

adaptation↗

Analysis of Drought Impacts on Electricity Production in the Western and Texas Interconnections of the United States

Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectric generation. Texas, conversely, is vulnerable because of its heavy dependence on thermoelectric generation, which relies on surface water for cooling, along with the fact that this basin seems to experience more severe drought events on average. Further modeling analysis will be performed in conjunction with the modeling teams at the participating interconnections (WECC and ERCOT) to explore the transmission implications of the drought scenarios in more detail. Given the first-order nature of this analysis, more detailed study of the potential impacts of drought on electricity generation is recommended. Future analyses should attempt to model the potential impacts of drought at the power-plant level, including potential mitigation strategies; include the effects of drought duration; understand the impacts of climate change; and consider economic impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Incorporating Demand Response into Western Interconnection Transmission Planning

This report documents the demand response (DR)-related analyses developed by LBNL and its collaborators for the Western Electricity Coordinating Council (WECC) transmission planning studies conducted within the 2011 and 2012 study cycles and includes four distinct study cases: the 10-Year Reference Case (termed the WECC 10-Year Common Case), the 10-Year State-Provincial Steering Committee (SPSC) High DSM/DG Case, the 20-Year WECC Reference Case, and the 20-Year SPSC High DSM/DG Case.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, environmental impact, and reliability, the availability of water is an emerging issue. Toward this growing need, thermoelectric expansion should consider competing demands from other water use sectors balanced with fresh and non-traditional water supplies subject to climate variability. To address this need the Department of Energy's Office of Electricity Delivery and Energy Reliability supported an integrated planning project with funding through the American Reinvestment and Recovery Act (2009). Specifically, an integrated energy-water analysis was performed to support transmission system planners in the Western and Texas Interconnections to explore the potential implications of water availability and cost for long-term transmission planning. The project brought together electric transmission planners (e.g., Western Electricity Coordinating Council (WECC) and the Electric Reliability Council of Texas (ERCOT)) with western water planners (e.g., Western Governors' Association and the Western States Water Council). Efforts were organized into ten specific tasks: (1) project coordination and outreach; (2) thermoelectric water use; (3) non-thermoelectric water use; (4) water availability; (5) water cost; (6) environmental risk; (7) climate variability; (8) energy for water; (9) decision support system interface; and, (10) transmission planning support. Major accomplishments associated with this effort include: For the first time water availability was used to inform generation expansion planning by WECC and ERCOT. For the first time, projections of intensifying drought and its effect on reservoir levels, and thermal effluent discharge permitting were used to inform operational and expansion planning by ERCOT. Water withdrawal and consumption were characterized for each power plant in the WECC and ERCOT service areas/regions. Water use factors were also developed for a range of unit processes that allowed projection of future water demands related to electric generation expansion planning. Working with state water managers current and future water use (withdrawal and consumption) were projected throughout the Western United States at an 8-digit Hydraulic Unit Code (HUC-8) level (over 1200 watersheds). In a similar fashion water availability and cost were mapped across the Western United States. Considered were five different sources of water: unappropriated surface water, unappropriated groundwater, appropriated water, municipal wastewater and brackish groundwater. Water basins (at the HUC-8 level) were mapped across the Western United States with regard to their potential for conflicts between aquatic and riparian species and habitats listed under the Endangered Species Act and water availability for future energy development. Water planners were engaged through the Western States Water Council and thus reflects their membership of the 17 contiguous western states (i.e., Texas up through the Dakotas and West). Power plants at greatest risk to the impacts of drought were identified. The analysis considered the hazards of low flows, insufficient reservoir storage, and elevated water temperatures under intensifying drought conditions projected for the future. The electricity used to provide water-related services was mapped at a county level throughout the Western U.S. Considered was the electricity required for interbasin conveyance, agricultural pumping, drinking water and wastewater services. To communicate our results the project has produced 6 journal articles, 1 book chapter, 11 reports, and 47 presentations at related conferences.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of Climate Change Impacts on Renewable Energy Resources in Western North America

We examine a 25 km resolution climate model dataset to evaluate how regional climate change impacts solar and wind energy under a high-emission scenario. Our study considers the Western Electricity Coordinating Council (WECC) region, which covers the western United States and southwestern Canada, focusing specifically on locations with existing solar and wind infrastructure. First, we conduct a historical model comparison of solar and wind energy capacity factors to highlight model uncertainties across the study area. Using future climate projections, we then assess the seasonal patterns of solar and wind capacity factors for three timeframes: historical, mid-century, and end of century. Additionally, we estimate the frequency of solar and wind resource droughts during these periods for the entire WECC and its five operational subregions, finding that certain subregions are more susceptible to energy droughts due to limited renewable resources. Finally, we present day-ahead capacity factor forecasts to support energy storage planning and provide estimates of offshore wind energy capacity within the WECC. Our results indicate that offshore wind capacity factors are nearly twice as high as onshore values, with less seasonal variation, which suggests that offshore wind could offer a more consistent renewable energy supply in the future.

climate change↗

Effect of modeled time horizon on quantifying the need for long-duration storage

Long-Duration Energy Storage (LDES) has gained interest due to its key role in attaining a decarbonized, low-cost, and stable grid driven by variable renewable electricity (VRE). Currently, there is a wide range of LDES technologies being developed to provide electricity with 8+ hours of consecutive discharge. However, current capacity expansion models used in long-term planning processes rarely consider low cost LDES as a candidate technology. If they do, the storage balancing horizon (SBH) of the model usually only considers non-consecutive 1-day periods that do not capture the potential of LDES to shift energy across multiple days or even seasons. Addressing these limitations in existing models, this work explores the ways in which the optimal energy storage changes when increasing the number of consecutive days in the SBH and how these changes will impact planners who are determining the future roles of energy storage. Our analysis uses SWITCH, an open-source capacity expansion model with a high spatial resolution for the entire Western Electricity Coordinating Council (WECC) in a zero-carbon scenario in 2050. We find that the number of consecutive days in the SBH changes both the total selected power and energy capacity of LDES when storage energy and power capacity overnight costs are $\$$13 USD/kWh (or less) and $113 USD/kW, respectively. We also find that the amount of required energy in storage to drive a future VRE-driven WECC grid ranges from 2.5 TWh to 16.0 TWh depending on the length of the SBH. The optimal storage duration (energy to power ratio) we obtain ranges from 10 h to 620 h among all the scenarios. Furthermore, depending on the storage cost assumption, we observe different charge/discharge patterns when varying the length of the SBH. Given our results, we anticipate that as more LDES technologies become commercially available, it will be critical to increase the length of the SBH to fully capture the benefits of LDES assets in long-term planning processes of high VRE-driven grids.

42 ENGINEERING↗