Search NASA⌕ Search

SEARCH · Search NASA

Results for “WPTO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Modeling the Integration of Marine Energy into Microgrids - Wave Resource Assessment

This submission has wave resource assessments which were conducted for six locations based on IEC requirements using the DOE WPTO Hindcast data and MHKiT. The locations are chosen to provide varying wave climates and include PacWave South, OR; Wave Energy Testing Site (WETS), HI; Molokai, HI; St. Paul, AK; Yakutat, Ak; and Sebastion, FL. It includes the data gathered and the resulting report. This submission also includes a link to Hindcast dataset and some relevant software.

16 TIDAL AND WAVE POWER↗

Historical Hydropower Operations and Economic Value

This report on historical hydropower operations and economic value focuses primarily on addressing HydroWIRES Objective 1.3: Advance valuation of conventional and pumped-storage hydropower assets. It is informed by previous work performed by Argonne and other national laboratories on the modeling and analysis of value of pumped storage and conventional hydropower. The results from this report will feed into the new projects that are planned under the HydroWIRES initiative and that will examine hydropower’s value in providing grid reliability and resilience, as well as in improving the modeling and representation of hydropower in power system models. Other relevant DOE efforts include various WPTO-funded projects, such as the Beyond Levelized Cost of Energy Project and Integrated Hydropower and Storage Systems, that are currently addressing similar challenges associated with defining grid service values that arise from hydropower machine capabilities.

13 HYDRO ENERGY↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

Water Power Technologies Office 2019 Peer Review Final Report

The U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy’s (EERE’s) Water Power Technologies Office (WPTO, or “the office”) 2019 Peer Review was held on October 8–10, 2019, in Alexandria, Virginia. The purpose of the peer review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office, to assess progress made against stated objectives, and to assess the office’s overall management and performance. All programs within EERE are required to undertake rigorous, objective peer reviews covering their key projects, as well as 80%–90% of their funded active project portfolio every two years.

13 HYDRO ENERGY↗

Hydropower Geotechnical Foundations: Executive Summary on Current Practice and Innovation Opportunities for Low-Head Applications

The following content provides a companion executive summary of Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications (DeNeale et al. 2020), a technical report developed by Oak Ridge National Laboratory (ORNL) and Knight Piésold Consulting, with funding from the US Department of Energy (DOE) Water Power Technologies Office (WPTO). This executive summary provides a brief synopsis of the broader information contained in the technical report. This study (and the associated technical report): (1) covers background information on hydropower; (2) describes various characteristics relevant to hydropower foundations for undeveloped US streams; (3) presents the current state of practice in foundation development; (4) provides a representative assessment of conventional hydropower foundation costs and timelines; (5) addresses key challenges facing conventional hydropower foundations; and (6) presents opportunity areas and examples for innovative hydropower foundation technologies while highlighting some advances in non-hydropower industries.

13 HYDRO ENERGY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

Powering the Blue Economy - Ocean Observing Use Cases Report

The "Powering the Blue Economy" (PBE) Report identified ocean observing and autonomous underwater vehicle (AUV) recharge as near-term markets with significant potential for marine energy integration when specified qualitative and quantitative assessment criteria were used. The ocean observing market (including AUVs) scored high relative to other markets analyzed in the PBE Report with respect to market size, marine renewable energy (MRE) compatibility with functional requirements, competitive positioning (i.e., MRE versus other power sources), path to market, and alignment to the Department of Energy Water Power Technologies Office (WPTO) and other agencies' objectives. Based on this scoring, Pacific Northwest National Laboratory (PNNL) and the National Renewable Energy Laboratory (NREL) pursued the development of five use cases that represent a spectrum of ocean observation platforms, fixed and mobile, to explore the present and future power needs that might be satisfied by marine energy. The use cases were described and analyzed for this potential by examining current missions and future needs, evaluating the mix of renewable energy sources that might satisfy those needs at sea, and understanding the overall cost drivers that might enable this application.

14 SOLAR ENERGY↗

Pumped Storage Hydropower Valuation Guidebook: A Cost-Benefit and Decision Analysis Valuation Framework

As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (Penn State-PNNL): Cooperative Research and Development Final Report, CRADA Number CRD-19-00842

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development, CRADA Number CRD-19-00837 (Final Report)

The National Renewable Energy Laboratory (NREL) initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The national labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Use of Modern Tunnel Boring Machines for Underground Pumped Storage (CRADA 464)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

42 ENGINEERING↗

Making a Deal with the Devilfish: Biometric-Informed Screening Technology – Fish Protection Prize (CRADA 514)

In FY20, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams.

13 HYDRO ENERGY↗

Umida AG Fish Protection Prize, Cooperative Research and Development Agreement (CRADA) PNNL CRADA 487 (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

13 HYDRO ENERGY↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize (CRADA Final Report)

NREL initiated a prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, Southwest Research Institute (SWRI) was chosen as one of nine finalists to develop their concept in advance of the FAST Prize Pitch Contest held on October 27, 2021. The National Labs provided technical and business advisement to SWRI in preparation for this Pitch Contest.

13 HYDRO ENERGY↗

Price Formation in Zero-Carbon Electricity Markets: The Role of Hydropower

In April 2019, Water Power Technologies Office (WPTO) launched the HydroWIRES Initiative to understand, enable, and improve hydropower and pumped storage hydropower’s (PSH’s) contributions to reliability, resilience, and integration in the rapidly evolving U.S. electricity system. The unique characteristics of hydropower, including PSH, make it well suited to provide a range of storage, generation flexibility, and other grid services to support the cost-effective integration of variable renewable resources. The U.S. electricity system is rapidly evolving, bringing both opportunities and challenges for the hydropower sector. While increasing deployment of variable renewables such as wind and solar have enabled low-cost, clean energy in many U.S. regions, it has also created a need for resources that can store energy or quickly change their operations to ensure a reliable and resilient grid. Hydropower (including PSH) is not only a supplier of bulk, low-cost, renewable energy but also a source of large-scale flexibility and a force multiplier for other renewable power generation sources. Realizing this potential requires innovation in several areas: understanding value drivers for hydropower under evolving system conditions, describing flexible capabilities and associated tradeoffs associated with hydropower meeting system needs, optimizing hydropower operations and planning, and developing innovative technologies that enable hydropower to operate more flexibly.

13 HYDRO ENERGY↗

Irrigation Modernization Task 4: Accelerating Energy Solutions (FY2022 Final Report)

This report offers insights on energy solutions for irrigation modernization that serve the needs of farmers as well as residents and industry in the local community. Solutions are found in the irrigation districts where local generation from renewable energy sources – solar, hydro, and wind – can be combined with energy storage and customer loads. These combined resources configured in microgrids can lower costs during peak loads and provide resiliency by maintaining electricity supply during outages. The goal of this project, as stated in the FY2022 AOP, is to promote realization of energy solutions that are tailored to physical location, community, infrastructure, and energy value streams. Further, it is to develop examples of how to increase value of, and overcome barriers to, energy solutions in the context of irrigation modernization. In pursuit of that goal, the project looked at options for: 1) Reducing the cost of energy consumed in irrigation systems, 2) Increasing the revenue from surplus power generation, and 3) Deploying new power generation configured as part of a local microgrid. Potential solutions to reducing energy costs and increasing surplus power revenue revolve around addressing regulatory and legal constraints tied to how power is purchased by and sold to the irrigator or irrigation district. Some headway was made in identifying barriers and ways to push utilities to be more accommodating to distributed energy sources; however, for the most part, real progress hinges on changes at the regulatory and legislative level. Deployment of local, renewable generation systems can be implemented provided the economics of the project and the location are favorable. In concert with Famers Conservation Alliance and Energy Trust of Oregon, a number of approaches were studied in the past year, including off-grid solar powered pumps, grid-tied community solar projects, and in-conduit canal hydropower systems. Ultimately three viable projects were identified: 1) North Unit Irrigation District/City of Redmond, Oregon Critical Facility Microgrid – offers combined in-conduit hydro and solar power generation. 2) Wallowa County/Joseph, Oregon Irrigation System Upgrades – centered on upgrades to a non-powered dam that will add a turbine as well as in-conduit power in canal feeders downstream. 3) Medford, Oregon Wastewater Treatment Plant Biogas Cogeneration System – centered on building out biogas storage and grid upgrades to power the plant, sell excess power, and provide emergency backup power (supplanting a diesel generator). Each of these projects has characteristics that broaden the understanding of the value of microgrids employing renewable energy to achieve resiliency and net-zero carbon goals. The first two projects are centered on new hydropower systems. Although the Medford project is only tangentially tied to an irrigation district, it was selected for study analysis as it was the only one mature enough (with sufficient data) to complete an analysis within this project year. Thus, we chose to move forward developing a case study, in concert with the Community Water-Power Resilience project, to demonstrate a method for evaluating such projects. Essentially, this case study serves as a template for studies to be carried out next year that more directly involve irrigation system hydropower, e.g., the project at the Wallowa County/Joseph, Oregon Irrigation System. Lastly, it is recognized that the locations and case studies in this report are all located in Oregon. We recognize this as a limitation. While the intent is not to ignore other states or regions, this result is driven by the fact that we have cultivated a collaboration with non-profit entities in Oregon that focus on these topics – Farmers Conservation Alliance and Energy Trust of Oregon. These partners were central to identifying projects that may be good fits for this program. A goal in the coming year is to establish collaboration with entities in other states/regions that, similarly, can connect us to potential projects in their geographic area. The potential benefits from the WPTO’s support for demonstration projects as energy solutions in irrigation districts include: (1) Alternative power supplies for communities and farms using renewable, carbon-free energy resources, (2) Cost savings for electricity for communities and farms, (3) Resiliency of power supplies for critical loads when electricity from the grid is not available, (4) Resiliency of power supplies for critical infrastructure in the event of catastrophic events, and (5) Demonstration of irrigation modernization projects that provide resilience and a reduced carbon footprint to irrigation districts and nearby communities. These deployments can serve as vanguards/archetypes spurring similar projects in other districts and states.

13 HYDRO ENERGY↗