Three-Dimensional Coaxial Weld Monitoring

Optical system for coaxial-viewing welding torch enables perception or measurement of depth. Light from welding area passes through beam splitter into two optical trains forming two images, each viewed along line making small angle with axis of torch. Two lines of sight intersect at weld pool. Parallax between two views provides sensation of depth over entire field view.

Gordon, Stephen S.↗

Metallographic Preparation of Space Shuttle Reaction Control System Thruster Electron Beam Welds for Electron Backscatter Diffraction

A Space Shuttle Reaction Control System (RCS) thruster failed during a firing test at the NASA White Sands Test Facility (WSTF), Las Cruces, New Mexico. The firing test was being conducted to investigate a previous electrical malfunction. A number of cracks were found associated with the fuel closure plate/injector assembly (Fig 1). The firing test failure generated a flight constraint to the launch of STS-133. A team comprised of several NASA centers and other research institutes was assembled to investigate and determine the root cause of the failure. The JSC Materials Evaluation Laboratory was asked to compare and characterize the outboard circumferential electron beam (EB) weld between the fuel closure plate (Titanium 6Al-4V) and the injector (Niobium C-103 alloy) of four different RCS thrusters, including the failed RCS thruster. Several metallographic challenges in grinding/polishing, and particularly in etching were encountered because of the differences in hardness, ductility, and chemical resistance between the two alloys and the bimetallic weld. Segments from each thruster were sectioned from the outboard weld. The segments were hot-compression mounted using a conductive, carbon-filled epoxy. A grinding/polishing procedure for titanium alloys was used [1]. This procedure worked well on the titanium; but a thin, disturbed layer was visible on the niobium surface by means of polarized light. Once polished, each sample was micrographed using bright field, differential interference contrast optical microscopy, and scanning electron microscopy (SEM) using a backscatter electron (BSE) detector. No typical weld anomalies were observed in any of the cross sections. However, areas of large atomic contrast were clearly visible in the weld nugget, particularly along fusion line interfaces between the titanium and the niobium. This prompted the need to better understand the chemistry and microstructure of the weld (Fig 2). Energy Dispersive X-Ray Spectroscopy (EDS) was used to confirm the chemical composition of the variations in contrast in these areas. Niobium alloys generally require exposure to more aggressive chemical reagents than titanium alloys for etching because of niobium s chemical resistance; therefore, the titanium portion of the sample was etched first. A five second immersion in Kroll s reagent revealed a general microstructure on the titanium portion of the sample; however, the titanium heat affected zone closest to the weld, was over-etched due to higher concentrations of refined grains and an increase in eta-phase. The Kroll s etchant also revealed some microstructure in the weld nugget itself; the niobium portion of the sample remained unetched.

Martinez, James↗

Low-Temperature Friction-Stir Welding of 2024 Aluminum

Solid state friction-stir welding (FSW) has been demonstrated to involve dynamic recrystallization producing ultra-fine, equiaxed grain structures to facilitate superplastic deformation as the welding or joining mechanism. However, the average residual, equiaxed, grain size in the weld zone has ranged from roughly 0.5 micron to slightly more than 10 micron, and the larger weld zone grain sizes have been characterized as residual or static grain growth as a consequence of the temperatures in the weld zone (where center-line temperatures in the FSW of 6061 Al have been shown to be as high as 480C or -0.8 T(sub M) where T(sub M) is the absolute melting temperature)). In addition, the average residual weld zone grain size has been observed to increase near the top of the weld, and to decrease with distance on either side of the weld-zone centerline, an d this corresponds roughly to temperature variations within the weld zone. The residual grain size also generally decreases with decreasing FSW tool rotation speed. These observations are consistent with the general rules for recrystallization where the recrystallized grain size decreases with increasing strain (or deformation) at constant strain rate, or with increasing strain-rate, or with increasing strain rate at constant strain; especially at lower ambient temperatures, (or annealing temperatures). Since the recrystallization temperature also decreases with increasing strain rate, the FSW process is somewhat complicated because the ambient temperature, the frictional heating fraction, and the adiabatic heating fraction )proportional to the product of strain and strain-rate) will all influence both the recrystallization and growth within the FSW zone. Significantly reducing the ambient temperature of the base metal or work pieces to be welded would be expected to reduce the residual weld-zone grain size. The practical consequences of this temperature reduction would be the achievement of low temperature welding. This study compares the residual grain sizes and microstructures in 2024 Al friction-stir welded at room temperature (about 30C and low temperature (-30C).

Benavides, S.↗

Dummy End Points Maintain Orientation In Welding

Programming artifice keeps weld puddle from running off. Dummy points added during off-line programming of circular, noncontiguous computer-controlled weld path to keep weld puddle in proper orientation at ends of path. Incorporation of dummy points simple and requires only few extra minutes of programming effort.

Sliwinski, Karen E.↗

Factors influencing design and selection of GTAW robotic welding machines for the Space Shuttle main engine

Proposed hardware and software for microprocessor-controlled power supplies and welding machines are described. The application of the automatic seven-axis welding machine, which is to be preprogrammed to allow minimum intervention by the welding operator during the actual process, to the welding of the Space Shuttle main engine is discussed. The production requirements for the gas tungsten arc welds for the Space Shuttle main engine are examined. Consideration is given to positioner design, welding variables, inert shielding gas management, filler metal wire control, the up loading and down loading of data from off-line computers, process improvements, tooling, the welding variable library, and adaptive sensor control.

Flanigan, L.↗

Nondestructive testing of welds on thin-walled tubing

Special ultrasonic search unit, or transducer assembly, reliably inspects the quality of melt-through welds of fusion welded tubing couplers for hydraulic lines. This instrumentation can also be used to detect faulty braze bonds in thin-walled, small diameter joints and wall thickness of thin-walled metal tubing.

Hagemaier, D. J.↗

The use of computer graphic simulation in the development of robotic systems

This paper describes the use of computer graphic simulation techniques to resolve critical design and operational issues for robotic systems. Use of this technology will result in greatly improved systems and reduced development costs. The major design issues in developing effective robotic systems are discussed and the use of ROBOSIM, a NASA developed simulation tool, to address these issues is presented. Three representative simulation case studies are reviewed: off-line programming of the robotic welding development cell for the Space Shuttle Main Engine (SSME); the integration of a sensor to control the robot used for removing the Thermal Protection System (TPS) from the Solid Rocket Booster (SRB); and the development of a teleoperator/robot mechanism for the Orbital Maneuvering Vehicle (OMV).

Fernandez, K.↗

The use of computer graphic simulation in the development of robotic systems

This paper describes the use of computer graphic simulation techniques to resolve critical design and operational issues for robotic systems. Use of this technology will result in greatly improved systems and reduced development costs. The major design issues in developing effective robotic systems are discussed and the use of ROBOSIM, a NASA developed simulation tool, to address these issues is presented. Three representative simulation case studies are reviewed: off-line programming of the robotic welding development cell for the Space Shuttle Main Engine (SSME); the integration of a sensor to control the robot used for removing the Thermal Protection System (TPS) from the Solid Rocket Booster (SRB); and the development of a teleoperator/robot mechanism for the Orbital Maneuvering Vehicle (OMV).

Fernandez, Ken↗

The use of computer graphic simulation in the development of robotic systems

The use of computer graphic simulation techniques to resolve critical design and operational issues for robotic systems is described. Use of this technology will result in greatly improved systems and reduced development costs. The major design issues in developing effective robotic systems are discussed and the use of ROBOSIM, a NASA developed simulation tool, to address these issues is presented. Three representative simulation case studies are reviewed: off-line programming of the robotic welding development cell for the Space Shuttle Main Engine; the integration of a sensor to control the robot used for removing the Thermal Protection System from the Solid Rocket Booster; and the development of a teleoperator/robot mechanism for the Orbital Maneuvering Vehicle.

Fernandez, Ken↗

STS-103 Discovery Launch Scrub Press Conference

A press conference held on December 16, 1999, to explain the reason behind NASA's decision to delay the Discovery's launching by a period of 24 hrs is presented. According to Ron Dittemore, Space Shuttle Program Manager, the STS-103 team delayed the launch because they need extra time to check one vendor's manufacturing processes, after an x-ray inspection revealed that an improper weld rod was used to weld one of the pressuring lines (called NPS lines) in the ET (external tank). Mr. Dittemore explained that since it is in the ET (not a major load carrying structure and rebuild after each flight), it did not pose any danger to the STS-103 flight. However, the same vendor also manufactured some parts of the orbiter and the team wanted to make sure that the quality of the vendor's manufacturing processes is robust before launching the orbiter to space. He also answered some reporters' questions.

Source record↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

Solid state welding processes for an oxide dispersion strengthened nickel-chromium-aluminum alloy

Solid-state welding processes were evaluated for joining TD-NiCrAl (Ni-16Cr-4Al-2ThO2) alloy sheet. Both hot-press and resistance spot welding techniques were successfully applied in terms of achieving grain growth across the bond line. Less success was achieved with a resistance seam welding process. In stress-rupture shear and tensile shear tests of lap joints at 1100 C, most failures occurred in the parent material, which indicates that the weld quality was good and that the welds were not a plane of weakness. The overall weld quality was not as good as previously attained with TD-NiCr, probably because the presence of alumina at the faying surfaces and the developmental TD-NiCrAl sheet, which was not of the quality of the TD-NiCr sheet in terms of surface flatness and dimensional control.

Moore, T. J.↗

Use of photostress to analyze behavior of an aft skirt test specimen

Strains at twenty-one selected points in the critical lower weld region of a aft skirt of a solid rocket booster of the shuttle were measured using photoelastic coatings and stress separator gages. Data were taken at loads of 5, 14, 20, 28, 42, 56, and 70 percent of the design limit load. Results indicate that general yielding occurred in the weld metal and for a short distance outside the fusion boundaries on either side of the weld metal. The fusion boundaries did not yield at the 70 percent load. Slight non-linearity in the load strain curves were observed at several points above the 20 percent load level. Maximum measured strains occurred at points in the forged metal of the holddown post along a line 0.50 inches from the centerline of the weld. Maximum shearing strains within the area covered by the photoelastic coating occurred at points approximately 0.33 inches to the right of the weld centerline near points 6 and 7 and lying along a yellow vertical line extending from just below point 6 to point 11. Photoelastic coatings were shown to be an excellent method to provide the whole field strain distribution in the region of the critical weld and to enhance the overall understanding of the behavior of the welded joint.

Gambrell, S. C., Jr.↗

Technique cuts time and cost of bending jacketed piping

Technique uses a stiff medium in the annular space between inner and outer pipes of jacketed piping in transfer lines. The process eliminates splitting and welding and makes possible the use of standard pipe-bending tools.

Gardner, J. N.↗

Real-time control for manufacturing space shuttle main engines: Work in progress

During the manufacture of space-based assemblies such as Space Shuttle Main Engines, flexibility is required due to the high-cost and low-volume nature of the end products. Various systems have been developed pursuing the goal of adaptive, flexible manufacturing for several space applications, including an Advanced Robotic Welding System for the manufacture of complex components of the Space Shuttle Main Engines. The Advanced Robotic Welding System (AROWS) is an on-going joint effort, funded by NASA, between NASA/Marshall Space Flight Center, and two divisions of Rockwell International: Rocketdyne and the Science Center. AROWS includes two levels of flexible control of both motion and process parameters: Off-line programming using both geometric and weld-process data bases, and real-time control incorporating multiple sensors during weld execution. Both control systems were implemented using conventional hardware and software architectures. The feasibility of enhancing the real-time control system using the problem-solving architecture of Schemer is investigated and described.

Ruokangas, Corinne C.↗

Verification Of Tooling For Robotic Welding

Computer simulations, robotic inspections, and visual inspections performed to detect discrepancies. Method for verification of tooling for robotic welding involves combination of computer simulations and visual inspections. Verification process ensures accuracy of mathematical model representing tooling in off-line programming system that numerically simulates operation of robotic welding system. Process helps prevent damaging collisions between welding equipment and workpiece, ensures tooling positioned and oriented properly with respect to workpiece, and/or determines whether tooling to be modified or adjusted to achieve foregoing objectives.

Osterloh, Mark R.↗

Unique methods for on-orbit structural repair, maintenance, and assembly

This paper reviews the MDA independent research and development (IRAD) efforts since 1986 in the development of two distinctly different approaches to on-orbit tube repair: (1) one-piece mechanical tube fittings that are forced, under pressure, onto the tube outer surface to effect the repair; and (2) electron beam weldings as demonstrated with the Paton-developed universal hand tool (UHT) space welding system for the repair of fluid lines and tubular components. Other areas of potential on-orbit repair using the UHT include damage to the flat or curved surfaces of habitation modules and truss assemblies. This paper will also address MDA evaluation of the Paton UHT system for on-orbit coating, cleaning, brazing, and cutting of metals. MDA development of an on-orbit compatible nondestructive evaluation (NDE) system for the inspection of tube welds is an important part of this complete space welding capability and will be discussed in a separate paper.

Anderson, Ray↗

Simple device facilitates inert-gas welding of tubes

Metal Y-tube simultaneously directs argon streams over weld areas on both sides of tubes being joined along a line on their outer periphery. The device is advanced along the junction in step with the welding operation.