Search NASA⌕ Search

SEARCH · Search NASA

Results for “Well Installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Crossroads of Nonproliferation and Safeguarding Technologies for Implementation in Molten Salt Reactors

Idaho National Laboratory (INL) recently conducted a workshop endorsed by the National Nuclear Security Administration (NNSA) under the auspices of the Defense Nuclear Nonproliferation R&D (DNN R&D) Office's Safeguards Portfolio. The workshop's primary objective was to foster an engaging dialogue among researchers, with a specialized emphasis on the safeguards pertaining to molten salt reactors. At INL, the installation of the state-of-the-art Molten Salt Thermophysical Examination Capability (MSTEC) is underway. This shielded argon glovebox facility, designed for both irradiated and non-irradiated actinide materials, represents the cutting edge of research infrastructure. MSTEC is poised to serve as a pivotal research platform in the realm of molten salt technology, with significant implications for safeguards applications. Participants of the workshop had the opportunity to tour the facilities, including the site where MSTEC is being installed, as well as to observe the INL's molten salt and pyroprocessing research hot cells. The event featured insightful presentations delving into molten salt chemistry and the MSTEC project. Each participating laboratory contributed to the discourse with presentations on their respective research efforts addressing safeguards in relation to molten salt reactors. The workshop culminated with a generative brainstorming session, where participants shared their thoughts on strategic integration with partner agencies, aiming to synergize efforts in advancing the field of nuclear safeguards.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Protection of Radial Circuits with High Penetration Distributed Photovoltaics

The paper addresses the shortcomings of distribution protection systems as distribution level photovoltaic installations as well as other inverter based distributed resources are added to the system. Several protection schemes have been evaluated, including distance-based, estimation-based and learning-based. The paper summarizes the results and provides recommendations.

distance protection, radial distribution feeders, ↗

Legal and Regulatory Aspects Related to Unmanned Aerial Systems (UAS) for Safeguards Implementation

The International Atomic Energy Agency (IAEA) is exploring the use of innovative technologies such as Unmanned Aerial Systems (UAS) to address safeguards verification challenges such as difficulties in accessing nuclear material in high radiation environments, and remotely located installations, as well as to increase the efficiency of safeguards implementation by automating repetitive and time-consuming tasks. As UAS continue to advance and their use becomes more frequent in high security conscious industries such as nuclear, their advantages in contributing to greater safety and security may weigh in favor of their use. However, as the IAEA begins to use these technologies, the legal, policy, and operational considerations associated with these advanced technologies will also need to be considered to identify any key opportunities, challenges, or areas of concern for the IAEA and its Member States. This paper will explore these areas and identify important considerations for the IAEA and its Member States to consider as the use of UAS is explored further for safeguards applications. It will also provide a series of recommendations for anticipating and addressing legal, regulatory, and policy challenges related to the use of UAS for safeguards implementation.

Siserman-Gray, Ioana-Cristina↗

Post-Calibration Uncertainty Analysis for Travel Times at a Naval Weapons Industrial Reserve Plant

The Naval Weapons Industrial Reserve Plant (NWIRP) in McGregor, Texas began manufacturing explosives in 1980 and several hazardous chemicals were discovered in lakes and streams surrounding the site in 1998. Contaminants traveled to local lakes and streams much faster than initially predicted. This research estimated contaminant travel times and identified locations where monitoring wells should be installed to yield the greatest reductions in uncertainties in travel-time predictions. To this end, groundwater and particle-tracking models for NWIRP site were built to predict hydraulic heads and contaminant travel times. Next, parameter (hydraulic conductivities) uncertainties, parameter identifiabilities, observation (hydraulic heads) worth, and predictive (contaminant travel times) uncertainties were quantified. Parameter uncertainties were reduced by up to 92%; a total of 19 of 158 parameters were at least moderately identifiable; travel-time uncertainties were reduced up to 92%. Additionally, travel-time predictions and post-calibration parameter distributions were generated using the null-space Monte Carlo (NSMC) technique. NSMC predicted that conservative tracers exited the flow system within a year, which matches with field data. Finally, an observations-worth analysis found that additional 11 more measurements would reduce travel-time uncertainties by factors from 1.04 to 4.3 over existing data if monitoring wells were installed at the suggested locations.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Marine Energy Environmental Permitting and Compliance Costs

Costs to permit Marine Energy projects are poorly understood. In this paper we examine environmental compliance and permitting costs for 19 projects in the U.S., covering the last 2 decades. Guided discussions were conducted with developers over a 3-year period to obtain historical and ongoing project cost data relative to environmental studies (e.g., baseline or pre-project site characterization as well as post-installation effects monitoring), stakeholder outreach, and mitigation, as well as qualitative experience of the permitting process. Data are organized in categories of technology type, permitted capacity, pre- and post-installation, geographic location, and funding types. We also compare our findings with earlier logic models created for the Department of Energy (i.e., Reference Models). Environmental studies most commonly performed were for Fish and Fisheries, Noise, Marine Habitat/Benthic Studies and Marine Mammals. Studies for tidal projects were more expensive than those performed for wave projects and the range of reported project costs tended to be wider than ranges predicted by logic models. For eight projects reporting full project costs, from project start to FERC or USACE permit, the average amount for environmental permitting compliance was 14.6%.

16 TIDAL AND WAVE POWER↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. Offshore Wind Energy Noise Reduction Associated with Installation of Fixed-Bottom Foundations: Workshop Report

As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.

17 WIND ENERGY↗

Case Study: Applying the Idaho National Laboratory Resilience Framework to St. Mary’s, Alaska

The Idaho National Laboratory (INL) resilience framework has been developed to broadly apply to EEDS so that all elements of systems that contain distributed wind can be part of the resilience evaluation. The users or audience for this framework can include any stakeholders associated with the EEDS. Not all electrical energy systems have the same stakeholders; customers, owners, and operators are generally present but have different interests. Considering the broad electrical grid, customers, regulators, investors, utility planners, engineers, and operators each have an interest in system resilience driven from different motivating factors. This document focuses on the planning stage of the framework. In this document, each step is explained briefly before demonstrating its application to the St. Mary’s-Mt. Village system. The framework can be used for many types of resilience planning. It can be used to evaluate current overall resilience, or the resilience of certain subsystems. It can be used to explore existing resilience weak points and propose mitigations. It can also be used to evaluate the resilience benefits of a new investment. We use the latter application for this case study. Although the wind turbine in St. Mary’s has already been installed, the resilience benefits that the turbine provided were not well defined. It was installed with the main objective to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation, which is a resilience goal on its own, but there are other ways in which the turbine can add resilience to the system, as well as scenarios of interest to analyze how resilient the wind turbine itself is against different hazards. In this case study, we analyze the operation of the St. Mary’s power system both with the wind installed and without the wind installed during different resilience hazards of interest. This allows us to compare the performance with wind and without wind and to quantify the resilience benefits provided by wind. Our MIRACL partners at PNNL will then take the resilience benefits and assign value to the resilience provided by wind based on costs and costs avoided in the different scenarios.

17 WIND ENERGY↗

Low-energy H- beam injectors for particle accelerators: upgrade requirements, challenges and future plans [Slides]

High brightness, negative hydrogen ion sources are used extensively in large, accelerator-based, user facilities operating worldwide. Negative hydrogen beams have become the preferred means of filling circular accelerators and storage rings as well as enabling efficient extraction from cyclotrons. Much larger beams of H- ions are also utilized for neutral beams injection into fusion machines and will be discussed in a separate companion presentation. Some of the accelerator facilities include the US Spallation Neutron Source (SNS), Japan Proton Accelerator Research Complex (J-PARC), Rutherford Appleton Laboratory (RAL-ISIS), Los Alamos Neutron Science Center (LANSCE), Fermi National Accelerator Laboratory (FNAL), Brookhaven National Laboratory (BNL), the CERN LHC injector, the Chinese Spallation Neutron Source (CSNS) as well as numerous installations of D-Pace (licenced by TRIUMF) ion sources used mainly with cyclotrons. Many facilities are currently working on various improvement / upgrade projects, both in the near and long term, which are driving further development of their ion source and LEBT (Low Energy Beam Transport) and, in some cases, their overall front end injector system. This report will first provide a simple description of each facilities existing ion source and LEBT and summarize the operational parameters which are currently being routinely injected into their accelerators. Next, the parametric goals of each of the facilities upgrade projects are specified as well as development efforts currently underway to meet these requirement and improvement goals. It is hoped that that this work will not only capture the current state-of-the-art of worldwide H- beam injectors and clarify the research goals and efforts of the community in general but will also encourage further inter laboratory collaborations.

43 PARTICLE ACCELERATORS↗

The Mu2e Calorimeter

The EM CsI crystals and SiPM readout calorimeter of the Mu2e experiment is fully assembled, with all components completed and tested; the mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. The digital electronics is being produced and installed. We summarise the Calorimeter characteristics and the assembly status, as well as the move, installation and commissioning plans of the final disks in the Mu2e hall.

Borrel, L. [Caltech]↗

Field Experiments and Model Validation: The EGS Collab Project

Implementing enhanced geothermal systems (EGS) will require improvements in understanding stimulation of crystalline rock to create appropriate flow pathways, and the ability to effectively simulate both the stimulation and the flow and transport processes in the resulting fracture network. The US Department of Energy (DOE) is addressing these and other challenges at multiple scales. The EGS Collab project, addressed here, is performing tests and modeling at the 10 m scale. The FORGE project is performing tests at the full reservoir scale. The EGS Collab team created an underground testbed at the Sanford Underground Research Facility (SURF) in Lead, South Dakota, at a depth of approximately 1.5 km to examine hydraulic fracturing (Experiment 1). We are currently building a second testbed at SURF at a depth of about 1.25 km aimed at investigating shear stimulation (Experiment 2). In Experiment 1, we drilled eight boreholes in a well-characterized phyllite and installed geophysical sensors in six of them to create a well-instrumented testbed to allow careful monitoring of stimulation events and flow tests. Numerical simulation was used to answer key experimental design questions, to forecast fracture propagation trajectories and extents, and to analyze and evaluate results both in near-real-time and in detailed process studies. Stimulations performed in this testbed allowed quantification of processes occurring during stimulation and the examination of dynamic flow occurrences. Long-term ambient temperature and chilled water flow tests were performed in addition to many tracer tests to examine system behavior. Our second testbed, targeted at shear stimulation, is currently being built at the SURF Facility at a depth of about 1.25 km in amphibolite under a different set of stress and fracture conditions than Experiment 1.

artificial intelligence↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Integration of a Smart Outlet-Based Plug Load Management System with a Building Automation System

The growth of and reliance on renewable energy necessitate a multi-pronged approach to achieve grid reliability and economics. As they represent a notable portion of U.S. energy consumption, commercial buildings must play an active role in this effort. Conserving energy and responding to grid conditions through demand flexibility can be achieved through the integration of major building systems. Integration of plug and process loads with lighting and heating, ventilation, and air conditioning systems maximizes the effectiveness of integrated building energy management. In this research, we demonstrate the integration of smart outlets into a building automation system. We cover the installation process as well as the architecture required for smart outlets to communicate data to the building automation system and to receive commands back. After recording power measurements for one week as a baseline, we configured the building automation system to turn the smart outlets on and off according to a set schedule. This resulted in energy savings of 66% during 1 week on 25 plug loads. This work demonstrates that grid-interactive efficient buildings are achievable through building system integration.

building automation system↗

International MNSR Training Center

Plans for the conversion of the Chinese origin miniature neutron source reactors (MNSRs) to low-enriched uranium (LEU), and the return of the high- enriched uranium (HEU) core to China, were initiated in February 2011 when an international MNSR Working Group (WG) was established to coordinate these activities. Based on a Ghana Atomic Energy Commission (GAEC) decision, the MNSR core at the GHARR-1 facility was selected for pilot shipment. Working on the preparation of the HEU MNSR materials’ removal from the GHARR-1 facility as a training tool, a mock-up MNSR vessel was built for operator training. Experiencing the usefulness of the mock-up vessel in operator training in the Ghana case has since been developed further into a full-scale training facility, named the International MNSR Training Center (IMTC), which is now available for training operators from MNSR operating countries. The main objective of this Book is to document the IMTC as a full-scale MNSR training facility in operator training for HEU MNSR core discharge and packaging. The goal is to describe the IMTC in its full complexity — that is: (1) to present the IMTC’s buildings with its internal and outer areas; (2) to provide a full listing of the installed equipment, as well as a functional description, available at the IMTC site; (3) to introduce the training materials, tutorials, and training program; and (4) to present the training sessions and Dry-run demonstration of the recently completed NIRR-1 operator training, with their experiences and lessons-learned included. This Book serves as a kind of user manual for the IMTC, which contains all of the information to launch training courses at the site at any time. The target audience for this Book is the MNSR community, especially MNSR operators and regulators who are facing HEU-LEU core conversion and HEU material transportation, who require operator training to carry out their jobs safely and professionally.

99 - GENERAL AND MISCELLANEOUS↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗

ActiveBAS: A Low-cost, Scalable Control Solution for Grid-Interactive Small and Medium Sized Commercial Buildings

This project aims to develop and enhance a low-cost, highly scalable control solution for Small and Medium-Sized Commercial Buildings (SMCB), assess the business potential at multiple sites, and perform commercialization efforts. The technology can be applied to any buildings served by multiple units, with the benefits being greatest for open-spaced buildings, such as banks, retail stores, restaurants, and factories. This project aims to develop an affordable control solution for: 1) SMCB grid responsiveness, 2) reduction of GHG by changing unit operations, 3) greater reduction in utility costs, and 4) rapid adoption in the marketplace. The proposed technology will be built on a previously developed and demonstrated MPC solution. The minimal sensor requirement and less need of control expertise are the unique feature of the algorithm that leads to low capital and maintenance costs, and short installation and implementation time. These attributes contribute to low capital and maintenance costs, as well as a short installation and implementation time. However, these advantages come with a trade-off: increased difficulties and unreliability when applying traditional modeling and MPC control approaches due to limited information. This final report describes the modeling approaches developed and tested to overcome these challenges. It begins by outlining the modeling challenge posed by minimal sensor requirements, then delves into the proposed modeling approaches, which primarily involve system identification. Finally, preliminary test results for a simulation case study are presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Strain in the Vadose Zone During Sinusoidal-Rate Well Tests to Characterize an Aquifer

Well tests with sinusoidal variation in pumping rate are appealing because of the ability to filter competing signals and they also can be set up with no net removal of water, which is an advantage at contaminated sites. Current methods of interpreting sinusoidal-rate well tests analyze the phase lag and amplitude of pressure signals in the aquifer. This approach is restricted by the availability of monitoring wells. An alternative approach could be to measure the stain in the vadose zone instead of pressure in the aquifer. The goal of this research is to evaluate the feasibility of using signals from in-situ sensors in the vadose zone to characterize sinusoidal-rate well tests. Well tests with a variety of periods and amplitudes were performed using a well completed in an unconfined saprolite aquifer with a water table at 9m depth at our test site near Clemson, South Carolina. Vertical strain was measured every meter between 1 to 7 m using a distributed optical fiber sensing technique called coherence length gated microwave photonics interferometry (CMPI). A novel packaging system was designed to couple the optical fiber to the saprolite. The results show that strain measured in the vadose zone during sinusoidal-rate pumping varies periodically with amplitudes from 0.1 to 3 microstrain, depending on the amplitude of the sinusoidal pumping rate. Hydraulic heads at similar radial distances were also periodic with changing amplitudes ranging up to ±0.2 meters. The strain in the vadose zone responds to pressure in the underlying aquifer—the strain is tensile when the pressure is falling, and compressive when the pressure is rising. The phase lag between the pumping rate and the strain was 3 min with a pumping period of 15 minutes, and this gives a hydraulic diffusivity of 0.06 m2/s. This is the same diffusivity obtained by analyzing a constant rate pumping test, and it is slightly larger than the diffusivity (0.044 m2/s) obtained by analyzing the phase lag of the pressure in a nearby monitoring well. Strain measurements in the vadose zone could be made with much less cost and effort than installing a deep monitoring well. These results suggest that strain measurements in the vadose zone could be used to supplement monitoring wells, thereby increasing the resolution, and reducing costs of analyzing well tests.

well test, sinusoidal, periodic pumping, strain↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗