Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Predictive Integrated Stratigraphic Modeling (PRISM®) Work Plan Center Wide Per- and Polyfluoroalkyl Substances (PFAS) Potential Release Location (PRL) 237 Kennedy Space Center, Florida

This document presents a description of various site investigation activities that will be used to improve the conceptual site model (CSM) at the Kennedy Space Center (KSC) to develop a better understanding of the fate and transport of per- and polyfluoroalkyl substances (PFAS) in groundwater and surface water. The activities proposed herein include three primary tasks: a sequence stratigraphic analysis, groundwater and surface water gauging and sampling, and a stormwater pollutant modeling analysis.

PFAS↗

KSC Child Development Center (PRL 149) Confirmatory Sampling Report and Interim Measures Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The KSC Child Development Center (KCDC), the “site,” is designated as potential release location (PRL) 149 under the NASA RCRA permit. This report summarizes the results of the Confirmatory Sampling (CS) activities carried out on March 19, 2022, and May 16, 2023, at KCDC, PRL 149, KSC, Florida. This report additionally presents the results of an assessment conducted between July 7 and July 27, 2023, to determine whether construction activities in 2023 to replace certain playground equipment and the rubberized play surface released arsenic (As) contaminated soil.

CDC↗

The space shuttle payload planning working groups. Volume 10: Space technology

The findings and recommendations of the Space Technology group of the space shuttle payload planning activity are presented. The elements of the space technology program are: (1) long duration exposure facility, (2) advanced technology laboratory, (3) physics and chemistry laboratory, (4) contamination experiments, and (5) laser information/data transmission technology. The space technology mission model is presented in tabular form. The proposed experiments to be conducted by each test facility are described. Recommended approaches for user community interfacing are included.

Source record↗

The space shuttle payload planning working groups: Volume 9: Materials processing and space manufacturing

The findings and recommendations of the Materials Processing and Space Manufacturing group of the space shuttle payload planning activity are presented. The effects of weightlessness on the levitation processes, mixture stability, and control over heat and mass transport in fluids are considered for investigation. The research and development projects include: (1) metallurgical processes, (2) electronic materials, (3) biological applications, and (4)nonmetallic materials and processes. Additional recommendations are provided concerning the allocation of payload space, acceptance of experiments for flight, flight qualification, and private use of the space shuttle.

Source record↗

Corrosion Atmospheric Exposure Facility PRL #239 SWMU Assessment Report/Confirmation Sampling Work Plan

The National Aeronautics and Space Administration (NASA) Resource Conservation and Recovery Act (RCRA) permit requires identification and evaluation of known Solid Waste Management Units (SWMU) located at the Kennedy Space Center (KSC). The Corrosion Atmospheric Exposure Facility (CAEF), also known as facility number K8-0600, and the Corrosion Test Area (CTA); also known as facility number K8-0237, herein referred to as the site, is designated Potential Release Location (PRL) 239 under the NASA RCRA permit. A SWMU Assessment (SA) was conducted between November 2019 and February 2020 to identify potential environmental impacts related to current and historic operations being conducted at the site. The SA included a site reconnaissance visit in February 2020, interviews with various personnel possessing knowledge of past work practices and operations at the site, and review of available historical documentation, engineering drawings, and facility inspection reports. Current site conditions were documented in photographs. Soil types and wildlife habitat were also evaluated. The objective of the assessment was to identify potential locations of concern (LOC) at the site and to determine whether further evaluation is required.

Kimberly Clower↗

The space shuttle payload planning working groups. Volume 1: Astronomy

The space astronomy missions to be accomplished by the space shuttle are discussed. The principal instrument is the Large Space Telescope optimized for the ultraviolet and visible regions of the spectrum, but usable also in the infrared. Two infrared telescopes are also proposed and their characteristics are described. Other instruments considered for the astronomical observations are: (1) a very wide angle ultraviolet camera, (2) a grazing incidence telescope, (3) Explorer-class free flyers to measure the cosmic microwave background, and (4) rocket-class instruments which can fly frequently on a variety of missions. The stability requirements of the space shuttle for accomplishing the astronomy mission are defined.

Source record↗

Phase II Solid Waste Management Unit (SWMU) Assessment Work Plan Center Wide Per- and Polyfluoroalkyl Substances (PFAS) Potential Release Location (PRL) 237 Kennedy Space Center, Florida

This document presents a description of solid waste management unit (SWMU) assessment activities that will be used to identify additional locations where per- and polyfluoroalkyl substances (PFAS) may have been used at the Kennedy Space Center (KSC). The activities described herein will also be used to identify potential off-Center sources of PFAS and potential background locations for PFAS within KSC.

Krista D Sommerfeldt↗

Formulation of consumables management models: Test plan for the mission planning processor working model

The test plan and test procedures to be used in the verification and validation of the software being implemented in the mission planning processor working model program are documented. The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. An overview of the working model is presented. Execution of the test plan will comprehensively exercise the working model software. An overview of the test plan, including a testing schedule, is presented along with the test plan for the unit, module, and system levels. The criteria used to validate the working model results for each consumables subsystem is discussed.

Connelly, L. C.↗

Formulation of consumables management models. Development approach for the mission planning processor working model

The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.

Connelly, L. C.↗

Abstract communication for coordinated planning

work offers evidence that distributed planning agents can greatly reduce communication costs by reasoning at abstract levels. While it is intuitive that improved search can reduce communication in such cases, there are other decisions about how to communicate plan information that greatly affect communication costs. This paper identifies cases independent of search where communicating at multiple levels of abstraction can exponentially decrease costs and where it can exponentially add costs. We conclude with a process for determining appropriate levels of communication based on characteristics of the domain.

coordination↗

Large space structures controls research and development at Marshall Space Flight Center: Status and future plans

Work performed in Large Space Structures Controls research and development program at Marshall Space Flight Center is described. Studies to develop a multilevel control approach which supports a modular or building block approach to the buildup of space platforms are discussed. A concept has been developed and tested in three-axis computer simulation utilizing a five-body model of a basic space platform module. Analytical efforts have continued to focus on extension of the basic theory and subsequent application. Consideration is also given to specifications to evaluate several algorithms for controlling the shape of Large Space Structures.

Buchanan, H. J.↗

Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples will be collected at locations SW0001, SW0002, and SW0003 during both the March and September 2017 events. Team consensus was also reached at the October 2017 KSCRT meeting to continue with operation and maintenance (O&M) of the AS system at SW3.

REPORT↗

Evapotranspiration as a Regional Climate Priority: Results from a NASA/USDA Workshop

On April 5 to 7, 2011, the National Aeronautics and Space Administration (NASA) and the United States Department of Agriculture-Agricultural Research Service (USDA-ARS) sponsored a Workshop on Evapotranspiration (ET) in Silver Spring Maryland. The workshop was a response to a recommendation in the 2009-2011 GEO (Group on Earth Observations) Work Plan that a workshop on ET should be held to discuss issues related to ET products and services and the potential for incorporating ET activities into the 2012-2015 GEO Work Plan. The workshop had a regional emphasis, although there were several excellent international and global presentations including one on the GEWEX LANDFLUX project. The different scales of these activities suggests that a framework is needed that can accommodate both regional and global ET activities. Despite limitations with the workshop's scheduling, it attracted 76 experts who contributed informative presentations and insightful discussions. The goals of the workshop involved the exchange of information and ideas and the development of plans for providing more visibility for ET issues. Specific objectives included 1) defining the needs and requirements for evapotranspiration data in weather and climate studies, in natural and agro-ecoystem monitoring, and in water resource management; 2) reviewing the methods used to measure and model evapotranspiration; 3) assessing surface and satellite observation systems required to support ET measurement, modeling and evaluation; 4) assessing the feasibility of developing a proposal for a task on evapotranspiration for the 2012-2015 GEO Work Plan, and 5) exploring the level of support and consensus for developing a strategy for establishing evapotranspiration as an Essential Climate Variable (ECV) within the Global Climate Observing System (GCOS) framework The workshop featured a combination of oral presentations and breakout group sessions focused on the above objectives. There were also poster presentations providing opportunities for one-on-one discussions of ET modeling and measurement techniques. Presentations by users of ET data set the tone for the workshop. In the USA at the national and regional levels water rights issues represent a major opportunity for ET applications. ET data play a major role in estimating water loss due to irrigation, the largest cause of consumptive water loss in the USA, particularly in the West. Irrigation requirements are relatively specific since the needs are clearly defined by the geometry and number of the irrigation systems and can be monitored with high resolution satellite data. There was a strong consensus that land surface temperature (LST) at high resolution is critical for monitoring irrigation. State governments have made commitments to more efficient water management in the western US, but they need full access to improved and more timely ET data and applications to implement this plan. Water managers also reported that in spite of the recent development of. new techniques, the procedures used in some of the water balance calculations in some states are out of date and do not take advantage of new observational and data assimilation systems. The development of ET forecasts for water management is also seen as a priority. Although ET forecasts are currently being produced on an experimental basis these predictions could be improved by considering ET as a dynamic prediction variable in models and by increasing the time resolution of these ET predictions.

Lawford, Richard↗

Work management plan for data systems and analysis directorate

A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

Nichols, L. R.↗