Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Schedule Tolerance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Evaluation of Classifier Complexity for Delay Tolerant Network Routing

The growing popularity of small cost effective satellites (SmallSats, CubeSats, etc.) creates the potential for a variety of new science applications involving multiple nodes functioning together or independently to achieve a task, such as swarms and constellations. As this technology develops and is deployed for missions in Low Earth Orbit and beyond, the use of delay tolerant networking (DTN) techniques may improve communication capabilities within the network. In this paper, a network hierarchy is developed from heterogeneous networks of SmallSats, surface vehicles, relay satellites and ground stations which form an integrated network. There is a tradeoff between complexity, flexibility, and scalability of user defined schedules versus autonomous routing as the number of nodes in the network increases. To address these issues, this work proposes a machine learning classifier based on DTN routing metrics. A framework is developed which will allow for the use of several categories of machine learning algorithms (decision tree, random forest and deep learning) to be applied to a dataset of historical network statistics, which allows for the evaluation of algorithm complexity versus performance to be explored. We develop the emulation of a hierarchical network, consisting of tens of nodes which form a cognitive network architecture. CORE (Common Open Research Emulator) is used to emulate the network using bundle protocol and DTN IP neighbor discovery.

Dudukovich, Rachel↗

Development of a Fan for Future Space Suit Applications

NASA's next generation space suit system will place new demands on the fan used to circulate breathing gas through the ventilation loop of the portable life support system. Long duration missions with frequent extravehicular activities (EVAs), the requirement for significant increases in reliability and durability, and a mission profile that imposes strict limits on weight, volume and power create the basis for a set of requirements that demand more performance than is available from existing fan designs. This paper describes the development of a new fan to meet these needs. A centrifugal fan was designed with a normal operating speed of approximately 39,400 rpm to meet the ventilation flow requirements while also meeting the aggressive minimal packaging, weight and power requirements. The prototype fan also operates at 56,000 rpm to satisfy a second operating condition associated with a single fan providing ventilation flow to two spacesuits connected in series. This fan incorporates a novel nonmetallic "can" to keep the oxygen flow separate from the motor electronics, thus eliminating ignition potential. The nonmetallic can enables a small package size and low power consumption. To keep cost and schedule within project bounds a commercial motor controller was used. The fan design has been detailed and implemented using materials and approaches selected to address anticipated mission needs. Test data is presented to show how this fan performs relative to anticipated ventilation requirements for the EVA portable life support system. Additionally, data is presented to show tolerance to anticipated environmental factors such as acoustics, shock, and vibration. Recommendations for forward work to progress the technology readiness level and prepare the fan for the next EVA space suit system are also discussed.

Paul. Heather L.↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fiscal Year 2025 Software Quality Assurance Activities for the ARC Software

The continued goal of the ARC SQA project in the Advanced Reactor Technologies program of DOE is to resolve the QA gaps for the ARC software that limit, or prevent, commercialization of the software for industry users. This project started in earnest in fiscal year 2023 which saw the entire code system moved from a SVN repository to a GitLab repository and an associated software quality assurance plan (SQAP) developed and ratified. Most of the QA gaps in the ARC software were identified in collaboration with industry partners and work begin in fiscal year 2023 and continued through 2024 and 2025. The continuous integration testing was extended to RCT, DASSH, and SE2ANL. Minor changes were required to the original continuous integration methodology to make this happen. When full confidence in the methodology is complete, a report will be created to detail the automated regression testing methodology and minor reports will be created to detail the tolerance settings that have been applied to the output for each ARC code. The primary documentation that is missing includes user manuals, user guides, software verification reports, and code coverage assessments. The DASSH, SE2ANL, and SE2RCT manuals were completed this fiscal year. A review of the SE2ANL software identified that it is unrealistic to include updated correlations or different geometry models and it was scheduled for deprecation in favor of DASSH. The SE2ANL manual is essential for SE2RCT as they are similar but quite different in purpose. The only piece of software missing a manual consistent with the source code is NUBOW-3D which is a focus of the coming year. The code coverage report for DIF3D was updated and code coverage reports were created for REBUS, RCT, PERSENT, GAMSRC, and DASSH. Minor coverage issues were identified for all of these pieces of software which did not prevent the work done to transition them to the OneAPI compiler. Because SE2ANL was scheduled for deprecation, it was not transitioned, but it was successfully tested with the OneAPI compiler. This leaves SE2RCT and NUBOW-3D as the only pieces of software not transitioned to OneAPI and further work is required to get SE2RCT to work properly. The SE2RCT software transition will begin early next year while the NUBOW-3D software requires a manual before it can begin. Software verification work has been completed for DIF3D, REBUS, GAMSOR, GAMSRC, VARPOW, EvaluateFlux, and SUMMAR. The PERSENT software verification work was completed this year which was somewhat delayed because of unexpected bugs in the software. The PERSENT manual was updated to detail some of the issues and discuss the bowing reactivity worth feature added in the previous fiscal year. The RCT, DASSH, SE2RCT, and NUBOW-3D software are the only maintained pieces of software without verification reports. The software verification work for DASSH will be a focus in the upcoming fiscal year and it is hoped that some of the test cases created can serve as verification tests for SE2RCT. The NUBOW-3D work will begin when the manual and requirements report are completed. Only minor industry partner software development funds were provided this year. The DASSH software was updated to handle general axial geometry for each assembly and the NUBOW-3D software was updated to incorporate a new input format and better output. Overall progress on resolving the QA gaps has been good this year.

97 MATHEMATICS AND COMPUTING↗

Design and Construction Solutions in the Accurate Realization of NCSX Magnetic Fields

The National Compact Stellarator Experiment, NCSX, is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge national Laboratory. The goal of NCSX is to provide the understanding necessary to develop an attractive, disruption free, steady state compact stellaratorbased reactor design. This paper describes the recently revised designs of the critical interfaces between the modular coils, the construction solutions developed to meet assembly tolerances, and the recently revised trim coil system that provides the required compensation to correct for the “as built” conditions and to allow flexibility in the disposition of as-built conditions. In May, 2008, the sponsor decided to terminate the NCSX project due to growth in the project’s cost and schedule estimates. However significant technical challenges in design and construction were overcome, greatly reducing the risk in the remaining work to complete the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High Permeability Ternary Palladium Alloy Membranes with Improved Sulfur and Halide Tolerances

The project team consisting of Southwest Research Institute{reg_sign} (SwRI{reg_sign}), Georgia Institute of Technology (GT), the Colorado School of Mines (CSM), TDA Research, and IdaTech LLC was focused on developing a robust, poison-tolerant, hydrogen selective free standing membrane to produce clean hydrogen. The project completed on schedule and on budget with SwRI, GT, CSM, TDA and IdaTech all operating independently and concurrently. GT has developed a robust platform for performing extensive DFT calculations for H in bulk palladium (Pd), binary alloys, and ternary alloys of Pd. Binary alloys investigated included Pd96M4 where M = Li, Na, Mg, Al, Si, Sc, Ti, V, Cr, Mn, Fe, Co, Ni, Cu, Zn, Ga, Y, Zr, Nb, Mo, Tc, Ru, Rh, Ag, Cd, In, Sn, Sb, Te, Hf, Ta, W, Re, Os, Ir, Pt, Au, Tl, Pb, Bi, Ce, Sm, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu. They have also performed a series of calculations on Pd{sub 70}Cu{sub 26}Ag{sub 4}, Pd{sub 70}Cu{sub 26}Au{sub 4}, Pd{sub 70}Cu{sub 26}Ni{sub 4}, Pd{sub 70}Cu{sub 26}Pt{sub 4}, and Pd{sub 70}Cu{sub 26}Y{sub 4}. SwRI deposited and released over 160 foils of binary and ternary Pd alloys. There was considerable work on characterizing and improving the durability of the deposited foils using new alloy compositions, post annealing and ion bombardment. The 10 and 25 {micro}m thick films were sent to CSM, TDA and IdaTech for characterization and permeation testing. CSM conducted over 60 pure gas permeation tests with SwRI binary and ternary alloy membranes. To date the PdAu and PdAuPt membranes have exhibited the best performance at temperatures in the range of 423-773 C and their performance correlates well with the predictions from GT. TDA completed testing under the Department of Energy (DOE) WGS conditions on over 16 membranes. Of particular interest are the PdAuPt alloys that exhibited only a 20% drop in flux when sulfur was added to the gas mixture and the flux was completely recovered when the sulfur flow was stopped. IdaTech tested binary and ternary membranes on a simulated flue gas stream and experienced significant difficulty in mounting and testing the sputter deposited membranes. IdaTech was able to successfully test PdAu and PdAuPt membranes and saw similar sulfur tolerance to what TDA found. The Program met all the deliverables on schedule and on budget. Over ten presentations at national and international conferences were made, four papers were published (two in progress) in technical journals, and three students (2 at GT and 1 at CSM) completed their doctorates using results generated during the course of the program. The three major findings of program were; (1) the DFT modeling was verified as a predictive tool for the permeability of Pd based ternary alloys, (2) while magnetron sputtering is useful in precisely fabricating binary and ternary alloys, the mechanical durability of membranes fabricated using this technique are inferior compared to cold rolled membranes and this preparation method is currently not ready for industrial environments, (3) based on both modeling and experimental verification in pure gas and mixed gas environments PdAu and PdAuPt alloys were found to have the combination of the highest permeability and tolerance to sulfur.

08 HYDROGEN↗

Introducing Tropical Geometric Approaches to Delay Tolerant Networking Optimization

Delay Tolerant Networking (DTN) is the standard approach to the networking of space systems with the goal of supporting the Solar System Internet (SSI). Current space networks have a small scale and often depend on rigorously scheduled (pre-determined) contact opportunities; this manual approach inhibits scalability. The goal of this paper is to recast these scheduling problems in order to apply the optimization machinery of tropical geometry. Contact opportunities in space are dependent on such factors as orbital mechanics and asset availability, which induce time-varying connectivity; indeed, end-to-end connectivity might never occur. Routing optimization within this structure is classically difficult and typically utilizes Dijkstra's algorithm as applied to contact graphs. Alternatively, we follow the successes of tropical geometry in train schedule optimization, job assignments, and even traditional networking, by extending this approach to this more general (i.e. disconnected) problem space. These successes imply tropical geometry provides a useful framework in the context of DTNs, starting with applications to queuing theory and long-haul links. Recently, tropical geometry has been applied to parametric path optimization on graphs with variable edge weights. In this work, we extend these advances to account for the problem of routing in a space network, and find that tropical geometry is well-suited to the challenges offered by this new setting, including contact schedules featuring probabilities. Our approach leverages the combinatorial nature of the problem to give feasible shortest path trees in the presence of variable channel conditions and latency, evolving topologies, and uncertainty inherent in space routing. We discuss our tropical approach to DTN for two Python implementations, a Verilog Tropical ALU implementation, tropical frameworks for other parametric graph problems, and solution stability. Lastly, a program for future work is included to illuminate the path ahead.

Delay Tolerant Networking↗

A Mathematical Analysis of an Example Delay Tolerant Network using the Theory of Sheaves

NASA’s High-Data Rate Architecture (HiDRA) project is working towards a general yet practical toolkit and knowledge base to help usher in the era of new technologies for space systems communications, such as optical links. The High-Rate Delay Tolerant Networking (HDTN) implementation falls under the umbrellas of both the toolkit and the knowledge base, as its advancements illuminate more general areas of Delay Tolerant Networking (DTN) that need growth. The goal of this paper is to explore the usage of particular mathematical machineries, namely temporal flow networks and sheaves, to identify fundamental, underlying structures in DTN for space systems. Satellites, space assets, ground stations, etc. give rise to a disconnected network, and it is the goal of DTN to glue disparate links together into a cohesive system, that is, a network. Depending on a given link, the latencies might be beyond that which the Transmission Control Protocol (TCP) can handle, and contact times might have one-way light times in excess of minute (sometimes significantly longer). Some links might be periodic (say, due to orbital mechanics) or they might not be. This diversity has made it difficult to probe the underlying structure. An immediate consequence is that DTNs in practice today are controlled by globally distributed contact plans (schedules), which are the input to the contact graph routing (CGR) algorithm. While this is effective for smaller networks, it will be very difficult to scale for future networks. Deeper and more rigorous theory is needed to bring DTN to the next evolutionary step. To this end, this paper introduces and suggests a mathematical framework for DTN, and applies it to a space network that is simulated using an orbital analysis toolkit. The tag-line for the structure known as sheaves is that they are the mathematically precise way of gluing local data together into unique, global data. If we consider routing, we see that networking is a “sheafy” science. We then discuss a simplified sheaf model, known as the cellular sheaf. The sheaf-theoretic analysis is presented and discussed, as it is hoped that this and related papers will help form the primordial ooze of DTN theory. Finally there is a section of future work suggesting follow-on research.

Delay Tolerant Networking↗

Coordinated Fault Tolerance for High-Performance Computing

Our work to meet our goal of end-to-end fault tolerance has focused on two areas: (1) improving fault tolerance in various software currently available and widely used throughout the HEC domain and (2) using fault information exchange and coordination to achieve holistic, systemwide fault tolerance and understanding how to design and implement interfaces for integrating fault tolerance features for multiple layers of the software stack—from the application, math libraries, and programming language runtime to other common system software such as jobs schedulers, resource managers, and monitoring tools.

97 MATHEMATICS AND COMPUTING↗

STATUS OF HIGH FLUX ISOTOPE REACTOR IRRADIATION OF SILICON CARBIDE/SILICON CARBIDE JOINTS

Development of silicon carbide (SiC) joints that retain adequate structural and functional properties in the anticipated service conditions is a critical milestone toward establishment of advanced SiC composite technology for the accident-tolerant light water reactor (LWR) fuels and core structures. Neutron irradiation is among the most critical factors that define the harsh service condition of LWR fuel during the normal operation. The overarching goal of the present joining and irradiation studies is to establish technologies for joining SiC-based materials for use as the LWR fuel cladding. The purpose of this work is to fabricate SiC joint specimens, characterize those joints in an unirradiated condition, and prepare rabbit capsules for neutron irradiation study on the fabricated specimens in the High Flux Isotope Reactor (HFIR). Torsional shear test specimens of chemically vapor-deposited SiC were prepared by seven different joining methods either at Oak Ridge National Laboratory or by industrial partners. The joint test specimens were characterized for shear strength and microstructures in an unirradiated condition. Rabbit irradiation capsules were designed and fabricated for neutron irradiation of these joint specimens at an LWR-relevant temperature. These rabbit capsules, already started irradiation in HFIR, are scheduled to complete irradiation to an LWR-relevant dose level in early 2015.

07 ISOTOPE AND RADIATION SOURCES↗

Groundwork for Universal Canister System Development

The mission of the United States Department of Energy’s Office of Environmental Management is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. Some of the wastes that that must be managed have been identified as good candidates for disposal in a deep borehole in crystalline rock (SNL 2014a). In particular, wastes that can be disposed of in a small package are good candidates for this disposal concept. A canister-based system that can be used for handling these wastes during the disposition process (i.e., storage, transfers, transportation, and disposal) could facilitate the eventual disposal of these wastes. This report provides information for a program plan for developing specifications regarding a canister-based system that facilitates small waste form packaging and disposal and that is integrated with the overall efforts of the DOE’s Office of Nuclear Energy Used Fuel Disposition Campaign's Deep Borehole Field Test. Wastes to be considered as candidates for the universal canister system include capsules containing cesium and strontium currently stored in pools at the Hanford Site, cesium to be processed using elutable or nonelutable resins at the Hanford Site, and calcine waste from Idaho National Laboratory. The initial emphasis will be on disposal of the cesium and strontium capsules in a deep borehole that has been drilled into crystalline rock. Specifications for a universal canister system are derived from operational, performance, and regulatory requirements for storage, transfers, transportation, and disposal of radioactive waste. Agreements between the Department of Energy and the States of Washington and Idaho, as well as the Deep Borehole Field Test plan provide schedule requirements for development of the universal canister system. Future work includes collaboration with the Hanford Site to move the cesium and strontium capsules into dry storage, collaboration with the Deep Borehole Field Test to develop surface handling and emplacement techniques and to develop the waste package design requirements, developing universal canister system design options and concepts of operations, and developing system analysis tools. Areas in which further research and development are needed include material properties and structural integrity, in-package sorbents and fillers, waste form tolerance to heat and postweld stress relief, waste package impact limiters, sensors, cesium mobility under downhole conditions, and the impact of high pressure and high temperature environment on seals design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sheaf Theoretic Models for Routing in Delay Tolerant Networks

One key to communications scalability is routing; as such the goal of this paper is to build upon successful efforts towards general routing for space-based networks. With the ever-increasing accessibility of space, the number of assets is increasing, which becomes a critical communications burden in terms of scheduling, spectrum allocation, and resource allocation. In order to mitigate these concerns, a true networking approach is necessary; a standard approach for space systems is Delay Tolerant Networking (DTN). For DTN to be a meaningful answer to the Solar System Internet (SSI) question, DTN must offer meaningful routing solutions that span the heterogeneous collection of links and nodes. This, in turn, depends on the general structure of these disconnected networks -- a structure that remains largely unknown. In ground communications networks, routing decisions are made based on several pathfinding algorithms working in tandem. In previous work, we modeled Dijkstra's pathfinding algorithm using sheaves and provided a more general framework for determining paths using sheaves over graphs. Continuing our sheaf-theoretic approach, we introduce here an expansion of our pathfinding sheaf to handle more general information, and we expand on additional pathfinding algorithms that can be represented using sheaves. Moreover, we demonstrate means of combining multiple algorithms into a single sheaf structure so that changes of scale can be presented in the language of sheaves. In addition, space communications networks rely upon radio transmitter antennas which can establish broadcast and multicast communications options, rather than the primarily unicast options available to wired networks. Last year, we also introduced a multicast routing sheaf for presenting broadcast, unicast, and multicast communications over a graph. Extending that work, we also introduce queuing sheaves so that we can blend these communications options together to simulate a variety of routing options across space networks. In addition, we include examples to illustrate the applicability of this abstract theory to routing in disconnected networks.

Robert Short↗

Shooting the Moon

This story is about an unlikely NASA mission to the Moon. It was unlikely because it was started with far too little time and too-little money to complete. It was unlikely because it was able to take chances to accept risk of failure. It was unlikely because it was searching for the unthinkable: water-ice on the moon... Figure 1-1: LCROSS Mission. The mission of the Lunar CRater Observation and Sensing Satellite (LCROSS) was to investigate the possibility of water ice in craters on the Moon s poles. This is certainly an interesting scientific topic in itself, but I intend to focus on the compelling experience of managing the LCROSS Project in the context of this storied Agency. Perhaps most interesting are the implications this story has for managing any development effort, lunar or not, and working a balance to achieve success. NASA is by design a risk-taking agency within the US Government. It could be argued that NASA s purpose in the aerospace community is to take on the really big challenges that either the corporate world can t afford, are not yet profitable endeavors, or are just too risky for private corporations to entertain. However, expectations of the Agency have evolved. A combination of grim human tragedies and some very public cost and schedule overruns have challenged the public s and Congress s tolerance for risk-taking within the Agency. NASA, which is supposed to be in the business of taking risks to do bold, difficult things, has become less and less able to do so within its cost framework. Yet effectively replacing prudent risk management with attempts to "risk-eliminate" is completely unaffordable. So where does risk-taking fit within the Agency, or within private/corporate organizations for that matter? Where astronauts play there is clearly concern about risk. When an organization puts humans in harm s way, it is understandably going to take extra effort to assure nobody gets hurt. Doing so, of course, costs money - a lot of money to pay for labor and hardware which is attempting to assure nothing will go wrong. Sophisticated designs, with doubly- or triply-redundant systems, extensive testing to verify those systems, and numerous engineering test units built to learn and evolve a hardware design, all drive the cost and time required to implement. Human spaceflight is an expensive business because of the exceptional system complexity and levels of assurance required for human space travel. What about missions that do not involve human spaceflight? What about missions whose potential failure will not take a human life, whose costs are small and whose urgency and importance are limited by design? A portfolio consisting of this type of mission can be designed to be risk tolerant, not requiring large expenditures to guarantee against failure. With the money saved, the number of missions that can be executed within the portfolio grows, or the total cost of the portfolio can be reduced. The NASA LCROSS mission is a pathfinder example of a low-cost, quick turn-around mission which struck a balance on mission risk, while accomplishing big objectives, like defining how we understand the Moon.

Andrews, Daniel R.↗

Phased Development of Accident Tolerant Fue

The United States Department of Energy (U.S. DOE) Advanced Fuels Campaign (AFC) has adopted a three-phase approach for the development and eventual commercialization of enhanced, accident tolerant fuel (ATF) for light water reactors (LWRs). Extending from 2012 to 2016, AFC is currently coming to the end of Phase 1 research that has entailed Feasibility Assessment and Prioritization for a large number of proposed fuel systems (fuel and cladding) that could provide improved performance under accident conditions. Phase 1 activities will culminate with a prioritization of concepts for both near-term and long-term development based on the available experimental data and modeling predictions. This process will provide guidance to DOE on what concepts should be prioritized for investment in Phase 2 Development/Qualification activities based on technical performance improvements and probability of meeting the aggressive schedule to insert a lead fuel rod (LFR) in a commercial power reactor by 2022. While Phase 1 activities include small-scale fabrication work, materials characterization, and limited irradiation of samples, Phase 2 will require development teams to expand to industrial fabrication methods, conduct irradiation tests under more prototypic reactor conditions (i.e. in contact with reactor primary coolant at LWR conditions and in-pile transient testing), conduct additional characterization and post-irradiation examination, and develop a fuel performance code for the candidate ATF. Phase 2 will culminate in the insertion of an LFR (or lead fuel assembly) in a commercial power reactor. The Phase 3 Commercialization work will extend past 2022. Following post-irradiation examination of LFRs, partial-core reloads will be demonstrated. The commercialization phase will further entail the establishment of commercial fabrication capabilities and the transition of LWR cores to the new fuel. The three development phases described roughly correspond to the technology readiness levels (TRL) defined for nuclear fuel development. TRL 1–3 corresponds to the “proof-of-concept” stage (Phase 1), TRL 4–6 to “proof-of-principle” (Phase 2), and TRL 7–9 to “proof-of-performance” (Phase 3). This paper will provide an overview of the anticipated activities within each phase of development and will provide an update on the current ATF development status.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phased development of accident tolerant fuel

The United States Department of Energy (U.S. DOE) Advanced Fuels Campaign (AFC) has adopted a three-phase approach for the development and eventual commercialization of enhanced, accident tolerant fuel (ATF) for light water reactors (LWRs). Extending from 2012 to 2016, AFC is currently coming to the end of Phase 1 research that has entailed Feasibility Assessment and Prioritization for a large number of proposed fuel systems (fuel and cladding) that could provide improved performance under accident conditions. Phase 1 activities will culminate with a prioritization of concepts for both near-term and long-term development based on the available experimental data and modeling predictions. This process will provide guidance to DOE on what concepts should be prioritized for investment in Phase 2 Development/Qualification activities based on technical performance improvements and probability of meeting the aggressive schedule to insert a lead fuel rod (LFR) in a commercial power reactor by 2022. While Phase 1 activities include small-scale fabrication work, materials characterization, and limited irradiation of samples, Phase 2 will require development teams to expand to industrial fabrication methods, conduct irradiation tests under more prototypic reactor conditions (i.e. in contact with reactor primary coolant at LWR conditions and in-pile transient testing), conduct additional characterization and post-irradiation examination, and develop a fuel performance code for the candidate ATF. Phase 2 will culminate in the insertion of an LFR (or lead fuel assembly) in a commercial power reactor. The Phase 3 Commercialization work will extend past 2022. Following post-irradiation examination of LFRs, partial-core reloads will be demonstrated. The commercialization phase will further entail the establishment of commercial fabrication capabilities and the transition of LWR cores to the new fuel. The three development phases described roughly correspond to the technology readiness levels (TRL) defined for nuclear fuel development. TRL 1-3 corresponds to the 'proof-of-concept' stage (Phase 1), TRL 4-6 to 'proof-of-principle' (Phase 2), and TRL 7-9 to 'proof-of-performance' (Phase 3). This paper will provide an overview of the anticipated activities within each phase of development and will provide an update on the current ATF development status. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Proposed Clock Synchronization Method for the Solar System Internet

Networked communications in space are necessary to achieve scalability in terms of the number of communicating nodes but also in terms of the overall system complexity. A key component to such a system is the ability to synchronize clocks, which is the focus of this paper. The so-called Solar System Internet (SSI) will be built upon Delay Tolerant Networking (DTN), which, in analogy to the Internet Protocol (IP), can be considered a suite of protocols necessary for networking in the space domain. Therefore, our goal is to extend this suite to include a DTN clock synchronization capability, analogous to the Network Time Protocol (NTP) used in the Internet. A motivating example of a network in space is NASA’s LunaNet, a vision for a multi-hop multi-path network extending to the moon wherein not all nodes will have direct connections to an authoritative reference clock. In this paper, we propose a general clock synchronization methodology and algorithm that could be used for LunaNet as well as more elaborate time-varying networks. In recent years, DTN has benefited from modeling efforts founded on the mathematical tool of sheaves. Here we continue this work to provide an approach to clock synchronization. Due to the time-varying nature of space networks, absolute consensus is not possible. However, the sheaf Laplacian provides a practical, distributed approach to approximating consensus by allowing data to diffuse through the network. In particular, the sheaf Laplacian is readily computable, lending our approach to implementation. Our approach is well suited to handle the difficulties of space networks. For instance, differences in clock accuracy mean certain nodes are more authoritative than others; we can account for these differences through hierarchies in the network, generalizing the strata in NTP. Furthermore, just as error estimation is an integral part of NTP, we are able to give concrete error bounds for our approach. Indeed, different applications (e.g., communications schedules, pointing, navigation, distributed science) will have different requirements, hence it is necessary to maintain clocks within a given tolerance. We outline some of the necessary steps to turn our approach into a practical network protocol that could be used in DTN, and we conclude the paper with suggestions for future research.

Michael Moy↗

Girder Alignment Plan

The girders for the LCLS undulator system contain components which must be aligned with high accuracy relative to each other. The alignment is one of the last steps before the girders go into the tunnel, so the alignment must be done efficiently, on a tight schedule. This note documents the alignment plan which includes efficiency and high accuracy. The motivation for girder alignment involves the following considerations. Using beam based alignment, the girder position will be adjusted until the beam goes through the center of the quadrupole and beam finder wire. For the machine to work properly, the undulator axis must be on this line and the center of the undulator beam pipe must be on this line. The physics reasons for the undulator axis and undulator beam pipe axis to be centered on the beam are different, but the alignment tolerance for both are similar. In addition, the beam position monitor must be centered on the beam to preserve its calibration. Thus, the undulator, undulator beam pipe, quadrupole, beam finder wire, and beam position monitor axes must all be aligned to a common line. All relative alignments are equally important, not just, for example, between quadrupole and undulator. We begin by making the common axis the nominal beam axis in the girder coordinate system. All components will be initially aligned to this axis. A more accurate alignment will then position the components relative to each other, without incorporating the girder itself.

43 PARTICLE ACCELERATORS↗

On the role of Battery Energy Storage Systems in the day-ahead Contingency-Constrained Unit Commitment problem under renewable penetration

The integration of variable Renewable Energy Sources (vRES) to alleviate greenhouse gas emissions has introduced significant challenges for power systems operations. These challenges include high levels of uncertainty due to the intermittence associated with vRES and therefore impose the need to devise a reliable and cost-effective day-ahead unit commitment and power and reserves scheduling for real-time operations. Also, this increasing penetration of vRES requires higher ramping capabilities from units originally designed for other purposes (e.g., base-load generation), which might be exacerbated during contingency states. Hence, in this work, we propose a methodology to address the day-ahead Contingency-Constrained Unit Commitment (CCUC) problem that leverages the participation of Battery Energy Storage Systems (BESSs) to address load-following and post-contingency management, therefore alleviating the ramping burden on conventional thermal generators. To do so, we formulate a three-level optimization problem that represents the decision-making process of obtaining the least-cost commitment, generation and reserves scheduling, while restricting the Conditional Value-at-Risk (CVaR) of the system imbalance at real-time operations to user-defined tolerance levels. In addition, we devise a computationally efficient solution approach for the proposed problem based on the Column-and Constraint Generation (CCG) algorithmic framework. Two numerical experiments are conducted to empirically illustrate the benefits of the proposed methodology. Key results indicate a reduction in real-time ramping needs and a better usage of the system resources, with a reduction in the overall system commitment levels and reserve scheduling costs when compared to a benchmark case in which storage is not available.

Moreira, Alexandre↗