Search NASASearch

SEARCH · Search NASA

Results for “Workmanship”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The prevention of electronical breakdown and electrostatic voltage problems in the space shuttle and its payloads. Part 2: Design guides and operations considerations

The specific electrical discharge problems that can directly affect the shuttle vehicle and its payloads are addressed. General design guidelines are provided to assist flight hardware managers in minimizing these kinds of problems. Specific data are included on workmanship practices and system testing while in low pressure environments. Certain electrical discharge problems that may be unique to the design of the shuttle vehicle itself and to its various mission operational models are discussed.

Whitson, D. W.

An Investigation of Assembly and Performance of a Resistoflex Dynatube 1/4 Inch Fitting

Installation of titanium (6Al-4V) threaded fittings on 1/4 in. tubing is sensitive to workmanship and to the state of repair of the installation tooling. Tooling with very slight out-of-specification imperfections produces less than optimum swaged fittings. A significant quantity of samples were fabricated and X-rays were used to determine the depth of swage. Joint performance was assessed through static and dynamic testing.

Ehl, J. H.

Space Telescope performance and verification

The verification philosophy for the Space Telescope (ST) has evolved from years of experience with multispacecraft programs modified by the new factors introduced by the Space Transportation System. At the systems level of test, the ST will undergo joint qualification/acceptance tests with environment simulation using Lockheed's large spacecraft test facilities. These tests continue the process of detecting workmanship defects and module interface incompatibilities. The test program culminates in an 'all up' ST environmental test verification program resulting in a 'ready to launch' ST.

Wright, W. F.

The quality assurance role in the Deep Space Network

The quality assurance section provides skilled personnel who perform the following functions: quality hardware engineering, quality software engineering, inspection and testing, and an independent assessment to quality, engineering and project requirements. The quality assurance section provides specifications, workmanship standards, process specifications and quality assurance procedures in support of DSN equipment. In addition, the quality assurance section reviews DSN engineering documents to ensure that appropriate and adequate quality provisions are included.

Sirpilla, R. L.

Protoflight photovoltaic power module system-level tests in the space power facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: The protoflight vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF), are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations are presented.

Rivera, Juan C.

Protoflight photovoltaic power module system-level tests in the Space Power Facility

Work Package Four, which includes the NASA-Lewis and Rocketdyne, has selected an approach for the Space Station Freedom Photovoltaic (PV) Power Module flight certification that combines system level qualification and acceptance testing in the thermal vacuum environment: the 'protoflight' vehicle approach. This approach maximizes ground test verification to assure system level performance and to minimize risk of on-orbit failures. The preliminary plans for system level thermal vacuum environmental testing of the protoflight PV Power Module in the NASA-Lewis Space Power Facility (SPF) are addressed. Details of the facility modifications to refurbish SPF, after 13 years of downtime, are briefly discussed. The results of an evaluation of the effectiveness of system level environmental testing in screening out incipient part and workmanship defects and unique failure modes are discussed. Preliminary test objectives, test hardware configurations, test support equipment, and operations, are presented.

Rivera, Juan C.

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.

Foster, William M., II

Force limited vibration testing

A new method of conducting lab vibration tests of spacecraft equipment was developed to more closely simulate the vibration environment experienced when the spacecraft is launched on a rocket. The improved tests are tailored to identify equipment design and workmanship problems without inducing artificial failures that would not have occurred at launch. These new, less destructive types of vibration tests are essential to JPL's protoflight test approach in which lab testing is conducted using the flight equipment, often one of a kind, to save time and money. In conventional vibration tests, only the input vibratory motion is specified; the feedback, or reaction force, between the test item and the vibration machine is ignored. Most test failures occur when the test item goes into resonance, and the reaction force becomes very large. It has long been recognized that the large reaction force is a test artifact which does not occur with the lightweight, flexible mounting structures characteristic of spacecraft and space vehicles. In new vibration tests, both the motion and the force provided to the test item by the vibration machine are controlled, so that the vibration ride experienced by the test item is as in flight.

Scharton, Terry D.

Ageing airplane repair assessment program for Airbus A300

Summary as a result of a commitment between the FAA and ATA the Airworthiness Assurance Task Force (AATF) steering committee requested the transport aircraft manufacturers to develop a program to assess the repairs on in-service aircraft since recent Supplemental Structural Inspection Programs (SSIP) had not been addressed to assessing repairs. The intent of the assessment program is to remove all existing ambiguities and to achieve a sufficient level of safety across the fleet by applying actual fatigue and damage tolerance criteria defined by FAR 25.571 to repaired structures. A general three stage program has been developed with major aircraft manufacturers and airlines cooperation including area/component classification, repair categorization and inspection/removal requirement establishment which is the basis for model specific repair assessment programs. This paper describes the current status of the repair categorization activities and includes all details about the methodologies developed for determination of the inspection program for the skin on pressurized fuselages. For inspection threshold determination two methods are defined based on fatigue life approach, i.e. a simplified and a detailed method. The detailed method considers 15 different parameters to assess the influences of material, geometry, size, location, aircraft usage and workmanship on the fatigue life of the repair and the original structure. For definition of the inspection intervals a general method is developed which applies to all concerned repairs. For this the initial flaw concept is used by considering 6 parameters and the detectable flaw sizes depending on proposed nondestructive inspection methods. An alternative method is provided for small repairs allowing visual inspection with shorter intervals.

Aging Aircraft

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method developed to verify commercial printed-circuit boards for a Shuttle orbital flight is discussed. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Temperature definition and vibration tests are performed next. Final assembly testing is performed to simulate the Shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 h of trouble-free operation. Verification is successful when all components and final assemblies have passed each test. This method was very successful in verifying that commercial printed-circuit boards will survive in the Shuttle environment.

Foster, William M., II

Factors of safety

Factors of safety serve three purposes: provides against trouble arising from unexpectedly large loads, allows for imperfections of workmanship, represents a depreciation allowance.

FACTORS OF SAFETY

Requirements for Printed Wiring Boards

In order to maintain the high standards of the NASA printed wiring programs, this publication: prescribes NASA's requirements for assuring reliable rigid printed wiring boards; describes and incorporates basic considerations necessary to assure reliable rigid printed wiring boards; establishes the supplier's responsibility to train and certify personnel; provides for supplier documentation of the fabrication and inspection procedures to be used for NASA work, including supplier innovations and changes in technology; and provides visual workmanship standards to aid those responsible for determining quality conformance to the established requirements.

Source record

Requirements for Conformal Coating and Staking of Printed Wiring Boards and Electronic Assemblies

In order to maintain the high standards of the NASA conformal coating and staking program, this publication: prescribes NASA's requirements for assuring reliable conformal coating and staking for printed wiring boards and electronic assemblies; describes and incorporates basic considerations necessary to assure reliable conformal coating and staking; establishes the supplier's responsibility to train and certify personnel; provides for supplier documentation of the fabrication and inspection procedures to be used for NASA work, including supplier innovations and changes in technology; and provides visual workmanship standards to aid those responsible for determining quality conformance to the established requirements.

Source record

An expert system for diagnosing anomalies of spacecraft

Although the analysis of anomalous behavior of satellites is difficult because it is a very complex process, it is important to be able to make an accurate assessment in a timely manner when the anomaly is observed. Spacecraft operators may have to take corrective action or to 'safe' the spacecraft; space-environment forecasters may have to assess the environmental situation and issue warnings and alerts regarding hazardous conditions, and scientists and engineers may want to gain knowledge for future designs to mitigate the problems. Anomalies can be hardware problems, software errors, environmentally induced, or even the cause of workmanship. Spacecraft anomalies attributable to electrostatic discharges have been known to cause command errors. A goal is to develop an automated system based on this concept to reduce the number of personnel required to operate large programs or missions such as Hubble Space Telescope (HST) and Mission to Planet Earth (MTPE). Although expert systems to detect anomalous behavior of satellites during operations are established, diagnosis of the anomaly is a complex procedure and is a new development.

Lauriente, Michael

Analytical Verifications in Cryogenic Testing of NGST Advanced Mirror System Demonstrators

Ground based testing is a critical and costly part of component, assembly, and system verifications of large space telescopes. At such tests, however, with integral teamwork by planners, analysts, and test personnel, segments can be included to validate specific analytical parameters and algorithms at relatively low additional cost. This paper opens with strategy of analytical verification segments added to vacuum cryogenic testing of Advanced Mirror System Demonstrator (AMSD) assemblies. These AMSD assemblies incorporate material and architecture concepts being considered in the Next Generation Space Telescope (NGST) design. The test segments for workmanship testing, cold survivability, and cold operation optical throughput are supplemented by segments for analytical verifications of specific structural, thermal, and optical parameters. Utilizing integrated modeling and separate materials testing, the paper continues with support plan for analyses, data, and observation requirements during the AMSD testing, currently slated for late calendar year 2002 to mid calendar year 2003. The paper includes anomaly resolution as gleaned by authors from similar analytical verification support of a previous large space telescope, then closes with draft of plans for parameter extrapolations, to form a well-verified portion of the integrated modeling being done for NGST performance predictions.

Cummings, Ramona

Mars Exploration Rover thermal test program overview

In January 2004, two Mars Exploration Rovers (MER) landed on the surface of Mars to begin their mission as robotic geologists. A year prior to these historic landings, both rovers and the spacecraft that delivered them to Mars, were completing a series of environmental tests in facilities at the Jet Propulsion Laboratory. This paper describes the test program undertaken to validate the thermal design and verify the workmanship integrity of both rovers and the spacecraft. The spacecraft, which contained the rover within the aeroshell, were tested in a 7.5 m diameter thermal vacuum chamber. Thermal balance was performed for the near earth (hot case) condition and for the near Mars (cold case) condition. A solar simulator was used to provide the solar boundary condition on the solar array. IR lamps were used to simulate the solar heat load on the aeroshell for the off-sun attitudes experienced by the spacecraft during its cruise to Mars. Each rover was tested separately in a 3.0 m diameter thermal vacuum chamber over conditions simulating the warmest and coldest expected Mars diurnal temperature cycles. The environmental tests were conducted in a quiescent nitrogen atmosphere at a pressure of 8 to 10 Torr. In addition to thermal balance testing, the science instruments on board the rovers were tested successfully in the extreme environmental conditions anticipated for the mission. A solar simulator was not used in these tests.

thermal vacuum test