Upgrading Fermilab s Accelerator Control System with ACORN

The Fermilab Accelerator Complex is the largest national user facility in the Office of High Energy Physics (DOE/HEP) program and the only national user facility operating at Fermilab. Fermilab serves as the host to the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE), the laboratory’s flagship project for neutrino science that is under construction. LBNF/DUNE will be powered by megawatt beams from an upgraded accelerator, the Proton Improvement Plan II (PIP-II) that will replace the laboratory’s aging linear accelerator with a new one based on superconducting radio-frequency cavities. The Accelerator Controls Operations Research Network (ACORN) Project will support LBNF/DUNE and PIP-II by modernizing the accelerator control system. The project is at the conceptual design phase and looking to achieve Critical Decision 1 (CD-1) later this year. The scope and structure of the project will be presented, along with an overview of how that has changed in the past year. Current design and technology choices will be shared. Specific challenges facing the project will be addressed, along with current thinking on solutions.

Roehrig, Christian [Fermilab]↗

Future Circular Collider Feasibility Study Report

Volume 3 of the FCC Feasibility Report presents studies related to civil engineering, the development of a project implementation scenario, and environmental and sustainability aspects. The report details the iterative improvements made to the civil engineering concepts since 2018, taking into account subsurface conditions, accelerator and experiment requirements, and territorial considerations. It outlines a technically feasible and economically viable civil engineering configuration that serves as the baseline for detailed subsurface investigations, construction design, cost estimation, and project implementation planning. Additionally, the report highlights ongoing subsurface investigations in key areas to support the development of an improved 3D subsurface model of the region. The report describes the development of the project scenario based on the ‘avoid-reduce-compensate’ iterative optimisation approach. The reference scenario balances optimal physics performance with territorial compatibility, implementation risks, and costs. Environmental field investigations covering almost 600 hectares of terrain—including numerous urban, economic, social, and technical aspects—confirmed the project’s technical feasibility and contributed to the preparation of essential input documents for the formal project authorisation phase. The summary also highlights the initiation of public dialogue as part of the authorisation process. The results of a comprehensive socio-economic impact assessment, which included significant environmental effects, are presented. Even under the most conservative and stringent conditions, a positive benefit-cost ratio for the FCC-ee is obtained. Finally, the report provides a summary of the studies conducted to document the current state of the environment.

Benedikt, M. [European Organization for Nuclear Re↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Design Enhancements for the SNS RFQ Coaxial Coupler

The H⁻ ion linear accelerator at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory operates with reliability that routinely surpasses 90% during scheduled beam operation. With the ambitious goal of eventually achieving at least 95% availability, several upgrade and improvement projects are ongoing. One such project is the modification of the coaxial couplers that transfer radio frequency (RF) power to the accelerator’s Radio Frequency Quadrupole (RFQ). The proposed modification utilizes stub sections and capacitive coupling to construct a physically separable assembly with DC isolation. With a separated coupler assembly, the section that includes the magnetic coupling loop can be permanently mounted to the RFQ which would eliminate the need to re-adjust the couplers after maintenance activities, upgrades, and repairs. Additionally, the modified design would provide increased multipaction suppression with DC biasing and potentially lower thermal gradients across the device. This paper presents the design and simulation results of the project.

Toby, George↗

Mechanical Design of the PIP-II ORBUMP Pulsed Dipole Magnet

The Proton Improvement Plan II (PIP-II) project is a vital upgrade to the Fermilab accelerator complex. The magnet pulse rate of the PIP-II Injection system requires an increase from the current rate of 15 Hz to 20 Hz as well as a roughly 30% increase in the magnetic field of the new Orbital Bump (ORBUMP) pulsed dipole magnets in the Booster. Here, the ORBUMP magnet mechanical design is presented in this paper. The ORBUMP magnet is secured in a vacuum box and the core is made up of 0.127 mm thick, low carbon steel laminations with a C-5 inorganic magnesium phosphate coating. The core is clamped using external tie bars welded to the core end plates. ANSYS Finite Element Analysis (FEA) was used to evaluate the clamping design to minimize the deflection of the core post welding of the tie bars. The water-cooled, single turn coil, which shapes the magnetic field by acting as the pole tips, is critical for the integrated field homogeneity. The coil manufacturing tolerances and fabrication techniques were evaluated to ensure the magnetic properties of the magnet could be obtained. The coil is electrically isolated from the core using virgin Polyether ether ketone (PEEK) insulating material in the gap. An investigation into the high voltage performance of the virgin PEEK insulator was conducted via partial discharge testing using a 1:1 scale sample.

Karas, D. [Fermi National Accelerator Laboratory (↗

Characterization of Interconnects

Combined-accelerated stress testing (C-AST) simultaneously combines stress factors of the natural environment (including UV radiation, temperature, humidity, electrical current, and external mechanical force) into a single test that requires fewer modules, fewer chambers, and makes it possible to discover weaknesses in new designs that are not known a-priori. C-AST reduces risk, accelerates time to market, and improves bankability by reducing costly overdesign using test levels not exceeding those seen in the natural environment. This project seeks to evaluate strengths and weaknesses of modern cell interconnect designs with combined-accelerated stress testing (C-AST) to screen multiple climates along with finite element and failure analysis to determine the potential for a 50-year life. Supporting this, we seek to develop methods of characterization to assess the degradation of interconnects, enable predictive rate models with material forensics and FEA and show C-AST's ability to find interconnect failures and benchmark it relative to other accelerated stress test methods like temperature cycling and cyclic dynamic mechanical loading. Examples of modern interconnect designs covered are Canadian Solar Hetero Technology ribbon enabling closer cell interconnections, SmartWire (eg. Meyer-Berger technology), and shingled cells with new interconnect materials.

C-AST↗

Unified Universal Control and Coordination of Inverter-Based Resources, and Validation for a PV + Battery Hybrid Plant

As renewable energy deployment grows, hybrid power plants (HPPs) combining photovoltaic (PV) and battery systems must evolve to offer both energy and grid stability services. These systems typically include a mix of grid-following (GFL) and grid-forming (GFM) inverters, presenting unique coordination and control challenges. This Department of Energy–funded project developed and validated a Unified Universal Control and Coordination (UUCC) framework for such PV + battery hybrid plants, enabling seamless and stable operation, including ultrafast black start, autonomous synchronization, and robust frequency and voltage regulation, under different grid conditions. The project significantly advanced the understanding of inverter-based resource (IBR) control by developing and validating three complementary system-level approaches for hybrid GFL/GFM operation: 1. A combined Virtual Resistance (VR)-based GFL and Virtual Oscillator Control (VOC)-based GFM method, where each inverter type is governed by a specialized control strategy. Together, these achieve stable, fast-response coordination, eliminating inrush current and enabling smooth black start and grid synchronization across a wide range of grid strengths. 2. A Deadbeat-based UUCC strategy, which uses discrete-time, switching-cycle-level control for both GFL and GFM inverters. This approach replaces traditional PI/PLL control with a control parameter-free, high-bandwidth framework that supports stable LVRT and instantaneous synchronization under all conditions. 3. A benchmark comparison with Siemens’ commercial GFM microgrid controller, which provided a fast baseline platform. The commercial approach decoupled v & f control was implemented on a commercial microgrid controller.The baseline commercial benchmark helped highlight superior transient response and black start performance offered by the deadbeat and VOC approaches. These technical contributions offer substantial improvements over conventional inverter control schemes, which often rely on slow phase-locked loop (PLL)-based synchronization, require careful control parameters tuning, and prone to unstable in weak grids with GFL inverters and in stiff grid with GFM inverters therefore challenging for hybrid GFL+GFM under all grid conditions. The deadbeat-based UUCC framework enables simpler, faster, and more robust operation of hybrid IBR systems using wide-bandgap (WBG) devices such as SiC power semiconductors. The rapid expansion of hybrid distributed energy resources (DERs), including residential and commercial PV-BESS installations such as Tesla Powerwall, PV with vehicle-to-grid (V2G) capability, and other integrated configurations, presents complex operational challenges for medium-voltage radial distribution feeders. These networks are subject to frequent disturbances such as faults, switching operations, rapid reclosing sequences, and feeder reconfigurations, all of which introduce dynamic stress on IBRs. In addition, planned feeder segmentation and deliberate islanding for resilience will require DERs that can autonomously perform blackstart, establish voltage and frequency references, and resynchronize with the main grid. The advanced deadbeat-based UUCC control and blackstart functionalities developed in this project directly address these requirements, enabling decentralized and autonomous operation of inverter-dominated DERs in distribution systems under a wide range of fault and reconfiguration scenarios. From a public benefit perspective, these innovations enable more reliable and cost-effective integration of renewable energy into distribution networks. The ability to autonomously black start and stabilize grids under varying grid conditions support accelerates recovery from outages and support decentralized resilient energy systems. By reducing system complexity and improving performance, this project lays critical groundwork for future inverter-dominated power grids that are clean, reliable, and accessible to all.

14 SOLAR ENERGY↗

Nek5000 developments in support of industry and the NRC

This year, the Nuclear Energy Advanced Modeling Simulation program (NEAMS) thermal-hydraulics verification and validation (V&V) work has focused in three areas of Nek5000 V&V-driven development. First, in a close collaborative effort with the U. S. Nuclear Regulatory Commission (NRC) staff, we have continued V&V efforts for the HYMERES-2 project using the OECD/NEA sponsored testing in the PSI PANDA facility. This year’s focus of ANL-NRC collaboration involves Nek5000 setups and validation for a range of problems relevant to and including the HYMERES-2 benchmark from PSI. The primary outcome of this year efforts is a more efficient geometry and inlet modeling simplification after a careful sensitivity study of the inlet profiles and pipe geometries. The resulting modeling choice of a short recycling/fully-developed turbulent inlet is within the experimental uncertainty estimate. This finding simplifies the next step of the cross-V&V HYMERES-2 project. In addition, the ANL team continue to provide assistance to the NRC staff in the form of Nek5000 application support in general and on the use of the HPC platforms of ALCF and INL in particular. This supports the NRC’s assessment of Nek5000 for use with the NRC Blue CRAB code suite. Second, we have implemented and tested more robust model of URANS, namely the k – τ model, a variant of the k-ω model, along with other improvements to RANS Nek5000 modeling in general. Because of its demonstrated robustness and stability, the k – τ model is the only RANS model that has been implemented in the new GPU version of the Nek5000 code, nekRS. Lastly, we report the initial implementation of Jacobian-free Newton Krylov approach to the direct Newton method for steady fluid solvers aimed at acceleration of RANS modeling and at IC improvement for LES campaigns. Also leveraging the Exascale Computing Project (ECP) ANL/CEED & SMR team’s software development effort to support NEAMS problems at large scale of the advanced computing architectures, NekRS, a GPU variant of Nek5000, built on top of kernels from libParanumal using OCCA for portability, has been successfully run on the full system of Summit (4608 nodes, 27648 GPUs).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

LDRD 2022 Annual Report: Laboratory Directed Research and Development Program Activities

Each year, Brookhaven National Laboratory (BNL) is required to provide a report of its completed Laboratory Directed Research and Development Program (LDRD) projects to the Department of Energy (DOE) Office of Scientific and Technical Information in accordance with DOE Order 413.2C Chg1 (MinChg) dated August 2, 2018. This report provides a detailed look at the scientific and technical activities for each of the LDRD projects funded by BNL in FY 2022, in fulfillment of that requirement. In FY 2022, the BNL LDRD Program funded 70 projects, 30 of which were new starts, at a total cost of $17.2M. The investments that BNL makes in its LDRD program support the Laboratory’s strategic goals. BNL has identified seven scientific initiatives that define the Laboratory’s scientific future and that will enable it to realize its overall vision. This requires simultaneous excellence in all aspects of BNL’s work – from science and operations, to external partnerships with the local, state, and national communities, and beyond. This is enabled by safe, efficient, and secure operations; by an unwavering commitment to a diverse, equitable, and inclusive environment, including workforce development, both with staff and reaching out to the community; and by a strong focus on renewed infrastructure. The seven scientific initiatives are: 1) Nuclear Physics: uncover the structure of visible matter by constructing and operating the Electron-Ion Collider at BNL to maintain international leadership in nuclear physics for decades; 2) Clean Energy and Climate: support a net-zero U.S. economy through fundamental research in basic energy and climate sciences to revolutionize grid-scale storage, renewable integration, and the study of atmospheric processes with a new facility to improve climate predictability; 3) Quantum Information Science and Technology: discover new quantum materials to enhance quantum computers and develop an entanglement sharing quantum network as a prototype for the first quantum internet; 4) Discovery Science Driven by the Human-AI Facility Integration: revolutionize the operation of experiments across the sciences at user facilities and in core programs; 5) High Energy Physics: understand the origin of space and time with the ATLAS high luminosity upgrade at CERN and the future Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment; 6) Isotope Production: accelerate and expand isotope production to ensure the security of the Nation’s supply; 7) Accelerator Science and Technology: harness the cross-cutting accelerator science expertise at BNL to develop new facilities, improve and expand its user facilities, and promote the use of accelerators in industry. The funded projects support BNL’s seven scientific initiatives and priority programs as well as new areas of research and competencies at the Laboratory that are consistent with the Laboratory’s vision and mission. In total, these LDRD investments supported 43 postdoctoral researchers in whole or in part and resulted in 138 publications and 7 awards. This Program Activities Report represents the future of BNL science; it is an impressive body of exploratory work that investigates many scientific and technical directions in support of the DOE and BNL missions.

99 GENERAL AND MISCELLANEOUS↗

Panel Session 35: Strategies and Successes in Increasing Efficiency and Reducing Cost to Accelerate Work While Maintaining Operational Excellence (R1.5)

This panel focused on results-based project execution and ways to improve the effectiveness of large radioactive clean-up site operations while increasing efficiency and reducing cost. Panelists discussed best practices and lessons learned from their sites and projects as they work within budgetary, resource and technological constraints. Panelist with presentations: CNS Journey (Morgan Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long Term Degradation of LSM Based SOFC Cathodes: Use of a Proven Accelerated Test Regimen

The overall goals of the program were: • To understand the microstructural basis of long-term performance loss in solid oxide fuel cells (SOFCs) with cathodes based on lanthanum strontium manganite (LSM, (La 1–x Sr x ) 1–yM nO 3±z ); • To develop strategies for optimizing LSM–based cathodes that achieve improved long-term performance, while exhibiting microstructural and chemical stability, for commercial fuel cell systems. The research project carried out accelerated testing of SOFCs with LSM-based cathodes of selected compositions. After intervals of accelerated testing (and control tests using non-accelerated conditions), the cells underwent extensive microstructural characterization to determine the physical and chemical changes in the cells. By analysis of a) the results of the testing, b) the observed microstructural changes, and c) the differences in these correlations between different cathode compositions and test durations, the research: • Identified a correlation between microstructural change and performance loss: specifically, between decrease of three-phase boundary (TPB) density and increase of area specific re-sistance (ASR) during operation; • Identified a cathode composition parameter — Mn excess, defined as 1/(1–y) in (La 1–x Sr x ) 1–y MnO 3±z ) — and how it affects TPB density, ASR and change of cell performance over time.

08 HYDROGEN↗

TCLK Must Stay! CAMAC Must Go! How Does Fermilab Move Forward

The current Timing System at Fermilab has been around for 40 years and currently relies on 7 CAMAC crates and over 100 CAMAC cards to produce the Tevatron Clock (TCLK). Thanks to the ingenuity of those before us, this has allowed Fermilab the flexibility to change the timing and Events for its accelerator as beamlines and projects have changed over the years. With the advent of the Proton Improvement Plan-II (PIP-II), the Timing System at Fermilab is being reimagined into a single chassis with even greater flexibility and functionality for decades to come while tackling the ever-challenging task of maintaining backwards compatibility.

Austin, M. R. [Fermilab]↗

Custom Equipment Development for Processing of Surplus Plutonium

The Strategic Laboratory Assessment (SLA), a collaborative team of SRNL and ORNL personnel, has been established to advance the objectives of the Surplus Plutonium Disposition (SPD) Project, by identifying and developing technologies to accelerate disposition, reduce life cycle costs, minimize worker radiation exposure, improve worker safety, and minimize Surplus Plutonium Disposition Program risks. [1] The SLA team has identified can cutting and plutonium (Pu) oxide size reduction as two glovebox processes where technology enhancements would be valuable. The DOESTD-3013 package currently in use for Pu downblending requires cutting two nested cans before the inner convenience can that holds the Pu oxide may be accessed for further processing. A rotary tubing-style cutter is used for opening the 3013 packages within the glovebox. Collet changeouts are required between cutting of the outer and inner cans. The SLA team is currently developing and testing an adjustable-clamp can cutter design that eliminates collet changeouts and allows cutting of the outer and inner can at the same time, resulting in significant reduction of radiological dose and process time, as well as improved ergonomics. To meet the Pu oxide particle size requirement, size reduction of Pu oxide agglomerations must be performed within the process gloveboxes. The SLA team has identified jaw crushing technology as an alternative to the currently employed rotary mill. Jaw crusher advantages include reduced dust within the glovebox, increased batch sizes, and easier integration with other glovebox processes due to the flow-through nature of jaw crushing. Commercially manufactured jaw crushers are either too large and/or too heavy for implementation in the SPD gloveboxes, so the SLA team is developing and testing a custom jaw crusher to meet the needs of the SPD Project.

Krementz, Daniel [Savannah River National Laborato↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Single Spoke Resonator (SSR) Cryomodules Assembly Tooling and Procedure for PIP-II

This report is a resume of the activities in which I was involved during my internship at Fermilab Particle Physics and Accelerator Laboratory in Batavia. The project at whom my work is connected is the PIP-II (Proton Improvement Plan – II), in particular I worked on the SSR cryomodules. The main task of my training program was to write an Engineering Note concerning the design of the lifting holders for the SSR1 and SSR2 string assembly. In the meanwhile, I was also commissioned to design some additional components that will take part actively in the project as well. During the initial phase I was lightly trained about the project and its general design, then I was supervised on my specific tasks. I want to thank primarily Jacopo Bernardini that was my supervisor, he attempted to create a favorable workplace, suggesting, listening and meeting all the requests, without his help achieving the result would have been greatly harder. Donato Passerelli and Mattia prise deserve a special thanks too for being always available for support and source of motivation. I had also the chance to share my work during the "Weekly Students Meetings" dealing with other bright engineers and students such as Colin Narug and Caleb Denton. I want also to express my gratitude to Simone Donati, Giorgio Bellettini and Emanuela Barzi that make this unique experience possible organizing this program for decades.

42 ENGINEERING↗

TPCpp-10M: Simulated proton-proton collisions in a time projection chamber for AI foundation models

Scientific foundation models hold great promise for advancing nuclear and particle physics by improving analysis precision and accelerating discovery. Yet, progress in this field is often limited by the lack of openly available large scale datasets, as well as standardized evaluation tasks and metrics. Furthermore, the specialized knowledge and software typically required to process particle physics data pose significant barriers to interdisciplinary collaboration with the broader machine learning community. This work introduces a large, openly accessible dataset of 10 million simulated proton-proton collisions, designed to support self-supervised training of foundation models. To facilitate ease of use, the dataset is provided in a common NumPy format. In addition, it includes 70,000 labeled examples spanning three well defined downstream tasks: track finding, particle identification, and noise tagging, to enable systematic evaluation of the foundation model's adaptability. The simulated data are generated using the Pythia Monte Carlo event generator at a center of mass energy of $\sqrt{s}$ = 200 GeV and processed with Geant4 to include realistic detector conditions and signal emulation in the sPHENIX Time Projection Chamber at the Relativistic Heavy Ion Collider, located at Brookhaven National Laboratory. This dataset resource establishes a common ground for interdisciplinary research, enabling machine learning scientists and physicists alike to explore scaling behaviors, assess transferability, and accelerate progress toward foundation models in nuclear and high energy physics. The complete simulation and reconstruction chain is reproducible with the sPHENIX software stack. All data and code locations are provided under Data Accessibility.

Data Analysis, Statistics and Probability (physics↗