ECAR-8446 Rev 0 MARVEL BPVC Section III Division 5 HBB Fatigue Acceptance Tests

The objective of this analysis is to evaluate the fatigue and creep behavior of 316 SS materials used in the Primary Coolant System (PCS) and Guard Vessel System (GVS) for the first two years of MARVEL reactor operation. The analysis follows the requirements set forth in ASME BPVC Section III, Division 5, HBB-2800, which mandates a fatigue test if operational conditions exceed allowable thresholds. By determining whether the materials meet the HBB-T-1324(a) and HBB-T-1324(b) criteria, this evaluation establishes whether a fatigue test is necessary, as well as the maximum allowable operational hours and temperatures before fatigue testing would be required. The deliverables of this analysis include calculations validating compliance with fatigue acceptance criteria, determination of maximum operational limits for the two-year period, and identification of conditions under which a fatigue test would be necessary. This ensures that the PCS and GVS can operate safely without premature material degradation and align with the design life requirements outlined in SPC-70731. Additionally, this evaluation provides conservative estimates for Service Level B occurrences and their impact on allowable Service Level A hours and temperatures, offering guidance for future operational assessments and potential life extensions beyond the initial two-year period.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Optimal Operation and Impact Assessment of Distributed Wind for Improving Efficiency and Resilience of Rural Electricity Systems

This project aims to empower rural utilities by developing advanced optimization models and algorithms for effectively integrating distributed wind energy alongside battery storage and other distributed energy resources (DERs). The primary objectives are to reduce peak demand, ensure reliable emergency power supply, and regulate voltage and frequency. To address operational challenges, the project introduces innovative mitigation strategies and ultrafast assessment frameworks to evaluate the impacts of distributed wind and DERs on rural grids, offering actionable solutions to potential issues. Economic viability is assessed through cost-benefit analysis using real rural utility data, ensuring the practical application of the project outcomes.

17 WIND ENERGY↗

Integration of Safety, Security, and Safeguards During Design and Operations: A Technical Assessment and Regulatory Considerations for Advanced Reactor and Advanced Fuel Fabrication Facilities

This report presents the current state of knowledge, technology, methodologies, and tools that could be implemented to realize the robust integration of safety, security, and safeguards (3S) for advanced nuclear reactors (ARs) and advanced nuclear fuel cycle facilities. This report was motivated by the global development of ARs which are expected to play a key role in meeting domestic energy and climate objectives. Domestically, with many ARs in the early design phase, the integration of 3S provides an opportunity to achieve risk reduction while using less resources than traditional light water reactors by leveraging interdependencies and synergies between each domain. In addition, domestic policy considerations encourage the convergence of each 3S domain through facility design and operations. Therefore, there is a need to better understand the interdependencies and integration between 3S across ARs and advanced reactor fuel cycle facilities’ lifecycles including design, construction, and operational phases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Grid Operator Analytics and Assessment Tools for Inverter- Based Resources Dominated Grid (GOAAT-IBR) Project Update

This presentation provides an update on the OPTIMA GOAAT project, with emphasis on the cloud-native data platform developed in-house to ingest, manage, and operationalize high-resolution power system data. Since our last NASPI presentation, accessible via OSTI ID #2671437, the project team advanced the design and deployment of a scalable architecture capable of handling both synchronized and non-synchronized streams, including PMU, point-on-wave (POW), COMTRADE, and SCADA data. These materials review the project status, recent progress, and key lessons learned. The core of the presentation examines the architecture and engineering of our cloud-native ingestion and data management platform. We then explain how pipelines were designed to collect, normalize, time-align, store, and serve heterogeneous data at scale. We will discuss design choices such as data models, streaming versus batch ingestion, storage tiers, and interoperability with analytics applications. Practical experiences with cloud-native technologies were shared during the event, including benefits, limitations, and integration challenges in a utility environment, along with methods used to improve performance, reduce latency, and optimize resource usage. The presentation also showcases user interface designs and visualization tools that convert raw measurements and analytics results into intuitive, actionable insights for operators and engineers. During the presentation examples were provided demonstrating how visualization, event views, and summarized analytics enhance situational awareness and support operational decision-making. These use cases illustrate how a well-designed data infrastructure can bridge the gap between high-volume measurements and practical grid operations.

Aminifar, Farrokh↗

A Framework for the Optimization of Water Treatment Processes Under Uncertainty Assessed through Process Operability

Conference presentation conveying work conducted on developing a framework for the optimization of water treatment processes after applying robust optimization and process operability tools. The objective of this framework is to optimize treatment processes under the uncertainty of source water conditions. This work contributes to robust optimization and process operability methodologies, allowing for the extension of probability from statistical models to operability calculations.

Barber, Hunter↗

Impact of suprathermal ions on neutron yield in the pre-DT phase of ITER operation

An assessment of neutron production during the pre-fusion power-operation (PFPO) phase has been carried out for a representative set of plasma scenarios predicted by the ITER Research Plan. A range of heating systems, namely neutral beam injection (NBI) (hydrogen), electron cyclotron resonance heating (ECRH), and ion cyclotron resonance heating (ICRH) are planned to be used for PFPO studies in helium, hydrogen, and mixed hydrogen–helium plasmas. Fast ions (protons and 3He) originating from NBI and ICRH systems can increase neutron production in PFPO plasmas by directly interacting with intrinsic Be impurities or through secondary processes, as also evidenced at JET. The generation of fast ions in ITER PFPO scenarios has been modelled using the ASTRA-NBI and TORIC-SSFPQL codes. A significant impact of the synergy between hydrogen NBI and hydrogen-minority ICRH on neutron production in helium plasmas is reported. In addition, the stability of the toroidicity-induced Alfvén eigenmodes (TAE) is analyzed for PFPO plasmas with a high pressure of suprathermal ions and a weak reversed shear. The possible impact of sawtooth oscillations and TAEs on neutron production is discussed, based on a linear stability analysis.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Readiness Evaluation for Sustained Operations

Readiness evaluation for sustained operations is a continuous function that progresses from overseeing establishment of five key programmatic elements during design and construction phases to monitoring the output of those elements performing during commissioning and operations. Continuously assessing readiness for sustained operations becomes an important business function for the U.S. Department of Energy’s Office of River Protection as competition for federal funds increases with increasing waste treatment operations throughout the Office of Environmental Management complex. The five key programmatic elements are as follows: Risk management – Risks and opportunities should prioritize continuous improvement initiatives and be informed by the design and technical authorities and stakeholder monitors. Continuous improvement – All levels of the project organization should exhibit commitment to continuous improvement and learning. Continuity of design and technical authorities – The authorities are responsible for managing knowledge for its effective use in the other elements. Stakeholder monitoring – Active and deliberate monitoring of stakeholder relationships. Sustained operations integrated business planning – Integrated business planning in a federal environment competitive for congressional funding.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Probability of Assessment for Central Alarm Station Operators

This project focused on developing and analyzing a method that could be employed by operational nuclear facilities to evaluate their CAS operators and determine a probability of assessment for each operator. This method is agnostic of alarm communication and display system (AC&D), sensors and cameras in place in the field, and any other technical security measures. This security-measure-agnostic method enables operational facilities to adopt it to determine the effectiveness of their alarm station operators.

42 ENGINEERING↗

LDRD23-0184: Resilience and Hazard Risk Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI)

Recent examples provide a significant concern for the resilience of the U.S. electric grid and represent a need for enhanced decision-making to address an increasingly wide range of complex system interactions and potential consequences. In response, this LDRD project produced a proof-of-concept evaluation called the Resilience and Hazard Assessment to Prioritize Security Operations for Decisions and Impacts (RHAPSODI) methodology as an agile and flexible analytic framework capable of addressing multiple, diverse threats to desired electric grid performance. After empirically grounding needs for the future of U.S. electric grid resilience, this project employed the systems-theoretic process analysis (STPA) to develop a systems engineering risk model. The results of a completed feasibility study of a notional high voltage transmission system demonstrate an improved ability to incorporate both spatial (e.g., geographically distributed) and temporal (e.g., dynamic and time-dependent) elements of security risk to the gird. The success of this LDRD project provides the foundation for further evolution of the systems engineering risk model for the grid; derivation of quantitative approaches to evaluate risk and resilience performance; facilitation of agile experimenting and grid sensitivity to a range of vulnerabilities; and development of tools to assist decision-makers in enhancing U.S. electrical grid resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Port of New York and New Jersey Drayage Electrification Analysis

The National Renewable Energy Laboratory (NREL) evaluated the potential for drayage electrification in the Port of New York and New Jersey (PoNYNJ), with a focus on operators: Harbor Freight Transport (HF), Safeway Trucking (SWT), and International Motor Freight Inc (IMF). This report summarizes the data collection and electrification evaluation of all three drayage operators, includes detailed operational data, and identifies the performance requirements for battery electric tractors (BETs) and corresponding infrastructure operated within the context of PoNYNJ drayage operation. This report also details a methodology to evaluate opportunities, strategies, and challenges associated with future expansions of BETs in meeting PANYNJ emissions goals. The Port Authority has established a goal of achieving Net Zero carbon emissions by 2050 across all facilities, including from tenant and stakeholder sources such as drayage trucks. NREL used real-world performance data collected on the three PoNYNJ drayage operations, along with modeling and analysis tools to compare BET to diesel trucks. From March to July 2021, NREL collected 1Hz vehicle and engine data from 46 drayage trucks at the three operators totaling nearly 121,000 miles of operation, providing enough information to assess vehicle operations for electrification potential. A Future Automotive Systems Technology Simulator (FASTSim) electric truck powertrain model was validated using PoNYNJ data and scenarios were run to evaluate drayage truck electrification requirements over the real-world cycles. The first scenario examined BET viability with minimal changes to existing operations. This assumes the trucks charge when stopped for two hours or longer, have a functional battery size of 375 kWh, and can charge at 270 kilowatts (kW) average which are the specification of the commercially available Freightliner eCascadia. The second scenario looked at what operational, charging infrastructure, and BET technology changes would be needed to fully electrify. Finally, detailed analysis was run on charging rate structure to understand operational costs to the fleets. The studied drayage trucks averaged 5.1 MPG, spent roughly 9% of their energy at idle, and drove an average of 140 miles per day with a maximum daily distance of 573 miles. The FASTSim model results indicate a comparable BET would use 417 kWh of energy per day on average accounting for cargo weight, which is close to the full usable capacity of the eCascadia currently available on the market. Based on the daily average operating data, partial fleet electrification is possible with current technology. However, some specific days of operation would require over 1,600 kWh of energy due to longer distances traveled by the trucks and more intense operation. Trucks used for long distance and intense operation cannot be readily electrified with current technology without operational changes. Full adoption of BETs could reduce CO 2 emissions from these fleets by roughly 75% today, eliminating 76 metric tons of CO 2 (MTCO 2 ) per vehicle each year, which equates to 24,100 MTCO 2 per year for all three operators. Commercially available direct current fast chargers (DCFC) have charge rates up to 350 kW. Based on the average daily modeled energy use for each operator, current industrial rate structures, and the assumption of 350 kW peak charging, full drayage electrification would increase electricity consumption. In addition, peak demand usage would increase with unmanaged charging along with cost of electricity having a direct impact on cost per mile for electric vehicles. The resulting cost per mile for BETs along with comparable cost per mile for conventional diesel trucks are also examined at $\$$4.00 per gallon of diesel. It will be important for PANYNJ and the drayage operators within the PoNYNJ to consider these load impacts to their existing electrical infrastructure and devise operational strategies that avoid coincident charging of vehicles to mitigate demand charges. Despite these electricity cost increases, savings from reductions in diesel consumption will help offset the costs of this increased electricity consumption. However, prices of both electricity and diesel are subject to change based on various factors meaning the realized savings will vary over time. This shows BETs could be cost-competitive on an energy cost per mile basis for all scenarios while diesel is above $\$$3.00/gal. Further, if diesel prices dropped to the 15-year low of $2.33/gal, it would still be cost competitive to operate the EVs with electricity costs of 16.3 ¢/kWh or less.

33 ADVANCED PROPULSION SYSTEMS↗

Failure Analysis for Molten Salt Thermal Energy Storage Tanks for In-Service CSP Plants

Thermal Energy Storage (TES) is a fundamental component in concentrating solar power (CSP) plants to increase the plant's dispatchability, capacity factor, while reducing the levelized cost of electricity. In central receivers CSP plants, nitrate molten salts have been used for several years for operation temperatures of up to 565 degrees C. Despite many efforts to advance nitrate salt to higher operation temperatures (even considering a replacement with molten chloride salts) to achieve higher energy conversion efficiencies, the 565 degrees C temperature is currently considered the state-of-the art. Although molten salt tanks have been broadly deployed in commercial CSP plants worldwide, several failures have been reported in these tanks after a few months or years of operation, causing significant economic loss and mistrust in CSP technologies. Most of these failures are associated with the infancy of the technology and multiple issues related to tank design, fabrication, commissioning, and aggressive operation. A technical standard dedicated to the design and fabrication of molten nitrate TES tanks does not exist today. Current in-service molten salt tanks have been generally designed based on the American Petroleum Institute's (API) 650 and ASME Section II standards. The API 650 code provides guidelines for dimensions and fabrication for oil storage tanks up to 260 degrees C. The ASME standard provides allowable stress values for various materials at a range of temperatures and conditions. Both standards seem to be limited for molten salt TES tanks where high temperatures, thermal cycling, and transient conditions are expected. In 2020, NREL released the Concentrating Solar Power Best Practices Study (NREL/TP-5500-75763) that summarized multiple issues in CSP plants, along with potential alternatives and recommendations to address those issues based on information collected from participants representing about 80% of operating CSP plants in the world. One of the recommendations from this study was the development of accurate and validated models to evaluate the plant's transient operation, capable of capturing the effect of short-term clouds and operator response, while being flexible in being adapted to various spatial and temporal resource data. The "Failure Analysis for Molten Salt Thermal Energy Tanks for In-Service CSP Plants" project was inspired on this recommendation and was focused on (1) the development and validation of a physics-based model for a representative, commercial-scale molten salt tank, (2) performing simulations to evaluate the behavior of the tank as a function of typical plant operation conditions, (3) understanding tank failures mechanisms, (4) determining the residual stress and distortion in the tank floor after welding fabrication and evaluating their impact in the stresses developed in the tank during operation, (5) assessing the impact of key operation parameters on the temperature and stress distribution, (6) conduct a preliminary evaluation of design features to reduce stress and improve tank's reliability, and (7) estimate the tank's service life based on the stress developed under diverse operation scenarios. From the analysis conducted in the project and presented in this report, it was found that maximum stresses surpassing the yield strength point of the stainless steel (SS) 347H are developed on the tank floor near the perimeter. These large stresses are strongly influenced by the initial residual stresses and distortion of the tank floor after welding fabrication. During operation, large stresses are developed in the tank floor at high operation temperatures with large salt inventory levels during transient operation. High stresses are also related to elevated temperature gradients in the tank floor that could be attributed to insufficient mixing within the salt inflow and the salt inventory. Based on the analysis, creep is the predominant failure mechanism. However, the large stress levels could favor the plastic deformation into buckles, and crack formation due to stress relaxation cracking during cycle operation. A lifetime below 3 years was estimated for the typical plant operation conditions and a specific initial residual stress and deformation distribution of the tank floor. The estimated life agrees with the service time to failure reported in several commercial molten salt tanks. Desing and operation guidelines can be extracted from the analysis presented in this report, which could be adopted by tank manufacturers and CSP operators to advance toward an ultimate solution for tank failures by reducing residual and operational stresses to achieve a tank service life of more than 30 years. Addressing failures in molten salt TES tanks is fundamental for the CSP industry's survivability, but it is also important for other industrial and power generation applications using this technology, including nuclear and concentrating solar thermal.

14 SOLAR ENERGY↗

INTEGRATION OF FLEX EQUIPMENT AND OPERATOR ACTIONS IN PLANT FORCE-ON-FORCE MODELS WITH DYNAMIC RISK ASSESSMENT

The overall operation and maintenance cost to protect nuclear power plants accounts for approximately 7% of the total cost of power generation, with labor accounting for half of this cost. In the current research, from interaction with utilities and other stakeholders, it was determined that physical security forces account for nearly 20% of the entire workforce at several nuclear power plants. Labor costs continue to rise in the U.S., so any measures to reduce the cost of operating a nuclear power plant will need to include a reduction in labor. The physical security pathway within the DOE’s Light Water Reactor Sustainability program aims to lower the cost of physical security through directed research into modeling and simulation, application of advanced sensors or deployment of advanced weapons. This report presents a modeling and simulation framework for integrating Diverse and Flexible Mitigation Capability (FLEX) portable equipment performance with Force on Force models of a plant’s physical security posture. The generic framework is described in detail, followed by a case study of modeling an adversarial attack aimed at causing a radiological release by sabotaging the plant’s power supply and its ultimate heat sink capabilities at a hypothetical nuclear power plant. Two different FLEX deployment strategies, series and parallel, are modeled with distinct timelines. The results of the adversarial attack modeled in a commercial Force on Force tool are integrated with the FLEX deployment model in INL’s dynamic modeling tool EMRALD. Monte Carlo simulation is used to model the distribution of the timeline in FLEX deployment strategies. The results demonstrate that, even in the extreme case of a successful adversarial attack, deployment of FLEX equipment can result in a significantly high likelihood of preventing radiological release. The modeling and simulation framework integrating FLEX equipment with Force on Force models enables the nuclear power plants to credit FLEX portable equipment in the plant security posture, resulting in an efficient and optimized physical security.

97 MATHEMATICS AND COMPUTING↗

Equipment Assessment Guide: A Technical Inspection and Hardening Guide for Devices in Power Grid Operations

This Equipment Assessment Guide, developed by Idaho National Laboratory (INL), provides a comprehensive framework designed to enhance the security of operational technology (OT) devices within power grid operations. The guide outlines essential steps for asset owners to conduct technical inspections and harden vulnerable hardware and firmware components commonly found in embedded systems. It focuses on components frequently targeted by cyber threats, offering valuable identification techniques for locating and recognizing critical components on devices. Additionally, the guide presents recommended secure configurations aimed at minimizing exposure and reinforcing defenses, along with impact analysis that highlights the potential consequences for grid operations if components are compromised. By implementing the recommendations outlined in this guide, asset owners can significantly enhance their cybersecurity posture, reduce the attack surface of field-deployed devices, and improve the resilience of grid services against emerging cyber threats.

42 - ENGINEERING↗

SOSAT: Geohazard Risk Assessment in Carbon Sequestration Operations

Like all operations in which fluids are injected into the subsurface, geologic carbon storage (GCS) presents inherit risks that must be assessed and mitigated to successfully deploy such technology in the field. For example, alterations to pore pressure and the stress state due to fluid injection may trigger certain geohazards, such as potential fault activation and induced seismicity or unintentional hydraulic fracturing. Here we present capabilities for assessing these potential risks using the State of Stress Analysis Tool (SOSAT): a Python library and web-based application capable of probabilistically estimating the subsurface state of stress informed by various field observations. Using posterior distributions of principal stress components, SOSAT can assess the risk of fault activation within the injection formation for either a critically oriented fault or a fault with a user-prescribed orientation. Additionally, SOSAT can estimate the probability of unintentional hydraulic fracturing of the intact reservoir rock. Here, we demonstrate these SOSAT capabilities using a hypothetical GCS site. This type of risk assessment can assist with the effective deployment of GCS technology in the field by informing safe design and management practices.

Haagenson, Ryan J.↗

Water Management Cost Assessment of CO2 Storage Operations

A three panel poster providing an analysis of treatment of produced waters from potential CO2 storage reservoirs. Selected water treatment technologies are modeled for several formations in five sedimentary basins in the lower 48 states assessing storage costs across a range of water quality present in these potential CO2 storage reservoirs.

Wendt, Anna↗

Assessing compounding climate-related stresses and development pathways on the power sector in the central U.S.

Future configurations of the power system in the central region of the USA are dependent on relative costs of alternative power generation technologies, energy and environmental policies, and multiple climate-induced stresses. Higher demand in the summer months combined with compounding supply shocks in several power generation technologies can potentially cause a “perfect storm” leading to failure of the power system. Potential future climate stress must be incorporated in investment decisions and energy system planning and operation. We assess how projected future climate impacts on the power system would affect alternative pathways for the electricity sector considering a broad range of generation technologies and changes in demand. We calculate a “potential supply gap” metric for each pathway, system component, and sub-region of the US Heartland due to climate-induced effects on electricity demand and power generation. Potential supply gaps range from 5% in the North Central region under mild changes in climate to 21% in the Lakes-Mid Atlantic region under more severe climate change. We find increases in electricity demand to be more important in determining the size of the potential supply gap than stresses on power generation, while larger shares of renewables in the power system contribute to lower supply gaps. Our results provide a first step toward considering systemic climate impacts that may require changes in managing the grid or on potential additional capacity/reserves that may be needed.

Gurgel, Angelo Costa↗