Search NASA⌕ Search

SEARCH · Search NASA

Results for “asset level data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Sensitivity of Mars surface navigation to timing errors

This study will show that the surface asset positioning process is robust and relatively insensitive to these errors. Indeed, the combination of in-situ and MN orbiter to Earth Doppler data is capable of simultaneously resolving surface asset and MN orbiter positions to an accuracy of 10 m, and clock errors to levels better than 3 msec.

Mars Network navigation timing errors↗

Coincident Aerosol and H2O Retrievals versus HSI Imager Field Campaign ReportH2O Retrievals versus HSI Imager Field Campaign Report

Two spectrally calibrated tarpaulins (tarps) were co-located at a fixed Global Positioning System (GPS) position on the gravel antenna field at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility’s Southern Great Plains (SGP) site. Their placement was timed to coincide with the overflight of a new hyperspectral imaging satellite. The intention was to provide an analysis of the data obtained, including the measured and retrieved spectral albedos for the calibration tarps. Subsequently, a full suite of retrieved values of H2O column, and the aerosol overburden, were to be compared to those determined by alternate SGP ground truth assets. To the extent possible, the down-looking cloud images would be assessed against the all-sky images. Because cloud contamination above a certain level precludes the inversion processing of the satellite data, coupled with infrequent targeting opportunities, clear-sky conditions were imposed. The SGP site was chosen not only as a target of opportunity for satellite validation, but as perhaps the best coincident field measurement site, as established by DOE’s ARM Facility. The satellite team had every expectation of using the information obtained from the SGP to improve the inversion products for all subsequent satellite images, including the cloud and radiative models and parameterizations and, thereby, the performance assessment for subsequent and historic image collections. Coordinating with the SGP onsite team, four visits, all in 2009, to the Central Facility occurred: • June 6-8 (successful exploratory visit to plan tarp placements, etc.) • July 18-24 (canceled because of forecast for heavy clouds) • Sep 9-12 (ground tarps placed, onset of clouds) • Nov 7-9 (visit ultimately canceled because of weather predictions). As noted, in each instance, any significant overcast prediction precluded image collection from the satellite. Given the long task-scheduling procedures (which were in place for each time period), coupled with other priorities and the satellite lifetime, no alternate SGP images could be obtained.

54 ENVIRONMENTAL SCIENCES↗

Understanding Impacts of Data Integrity Attacks on Transactive Control Systems

With the rapid growth of internet-connected smart devices capable of exchanging energy price information and adaptively controlling energy consumption of connected loads, the role of transactive control is expected to become more prominent in the modern grid. Transactive control systems integrate the wholesale and retail energy markets, and enable active participation of end users, thereby playing a key role in managing the rising number of distributed assets in the smart grid. The use of internet for the communication of data between the controllers at the building, distribution, and transmission levels makes the system susceptible to cyber-attacks. A skilled adversary can potentially manipulate the exchanged data with the intention of inflicting damage to the system. In this paper, four categories of metrics are put forth for evaluating the performance of the system when under data integrity attacks. A model for scaling-based data integrity attack has been described, and co-simulations have been performed on a 240 bus WECC transmission system model with detailed modeling of distribution systems at specific buses. Our results show that scaling-based data integrity attacks can have non-trivial impacts on the operational, financial, and comfort aspects of the transactive control system.

Smart grid, transactive control system, Buildings-↗

Estimating the Impact of Residual Value for Electricity Generation Plants on Capital Recovery, Levelized Cost of Energy, and Cost to Consumers

There is often a benefit to continue operating electricity generating assets after their initial contracts expire. This report discusses these benefits and associated risks, using data and illustrative calculations. The key findings are: the realized operational lives of generation technologies before retirement are typically much longer than typical measures of economic lives. The cost impact of a life extension can be comparable to the impact of other factors considered for generation investment decisions, and suggests that R&D and commercial efforts to extend generator life may be valuable. Refurbishment has a useful and economic role, but the option is often neglected during initial investment. Estimating follow-on value at the time of the original investment is complex and often neglected, but may be valuable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Big Data Framework with Machine Learning for D and D Applications - 19108

The nuclear industry is experiencing a steady increase in maintenance costs even though plants are maintained under high levels of safety, capability and reliability. Nuclear power plants are expected to run every unit at maximum capacity at all times, efficiently utilizing assets with minimal downtime. Surveillance and maintenance of nuclear decommissioning infrastructure provides lot challenges with respect to maintenance or decommissioning of the buildings. There is a need for a framework to analyze the huge amount of data generated by the sensors on the nuclear reactor components as well as structures, to monitor the conditions of these building over a period of time. Emerging technologies such as big data analytics have become a requirement in the nuclear industry to improve structural health monitoring and diagnostics. FIU will make use of existing mature technologies in the areas of imaging, robotics, big data, and machine learning/deep learning to assess the structural integrity of aging facilities at DOE sites. As these facilities await decommissioning, there is a need to understand the structural health of these structures. Many of these facilities were built over 50 years ago and in some cases these facilities have gone beyond the operational life expectancy. In other cases, the facilities have been placed in a state of 'cold and dark' and they are sitting unused, awaiting decommissioning. Finally, some older facilities are one-of-a-kind operational/production facilities supporting critical DOE missions and cannot be shut down. In any of these scenarios, the structural integrity of these facilities may be compromised, so it is imperative that adequate inspections and data collection/analysis be performed on a continuous and ongoing basis. The primary goals of the research include collecting various formats of data such as structured, unstructured and streaming data from the various sensors deployed in buildings, collect videos/pictures from various imaging sources, ingest them using a Hadoop distributed file system and process the data using Spark to perform batch processing and real time analytics. Research and development on various machine learning/deep learning algorithms will also be performed to analyze the heterogeneous data collected from nuclear decommission infrastructure. FIU will design the big data framework to ingest, store and process huge amounts of heterogeneous data collected from many sources and optimize the algorithms to provide insights into the data and predict anomalies observed when compared against baseline conditions. Various modules of this framework will include heterogeneous data sources, message broker, Hadoop distributed file system, Spark for stream and batch processing, machine learning/ deep learning, Cassandra - persistent data store and visualization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Bricks to Clicks: Mapping the White Space in Building Innovation

It is a critical national imperative to transform the buildings sector, yet innovation is impeded by deployment failures that leave promising technologies stranded. Conventional market reports and techno-economic analysis provide an insufficient understanding of markets and resource allocation for emerging building technologies. They omit crucial commercialization factors such as ecosystem maturity and adoption friction, where the coordinated participation of a network of suppliers, contractors, financiers, regulators, and integrators is required to scale solutions. This study addresses these gaps by introducing an evaluation framework grounded in front-line data from six years of the DOE's IMPEL incubator, comprising experience from 300 building-sector innovators and the adjacent, complex ecosystem. Our methodology synthesizes top-down market analysis with bottom-up, practitioner-level data across five megatrends: (M1) Affordable materials and industrialized construction; (M2) Healthy and efficient mechanical systems; (M3) Intelligent building operations; (M4) Buildings as grid assets; and (M5) High-density power and cooling for data centers and therein identify twelve "white space" technology opportunities. Next, we develop a multi-criteria scoring rubric to rank these opportunities based on parameters, i.e., Affordability, Quality of Life, Reliability, and Security, yielding composite ‘Demand’ and ‘Maturity’ indices. Our results indicate that the most significant white spaces may not be incremental products but a new class of ‘Ecosystem Enablers’, such as logistics platforms, orchestration layers, and automated compliance software that solve structural deployment gaps. This paper summarizes this transparent, evidence-based, practitioner-informed evaluation framework for policymakers and investors to re-evaluate policy and resource allocation and unlock scalable market transformation.

Singh, Reshma↗

Examples of Level Products Possible from Existing Assets

How do patterns of human environmental and infectious diseases respond to leading environmental changes, particularly to urban growth and change and the associated impacts of urbanization? We use HyspIRI high spatial resolution, multispectral, and multitemporal TIR data to track energy balance and energy flux characteristics for changing land covers/land uses through time to provide synoptic views of impacts on surface energy fluxes, emissivity and temperature and HyspIRI data in conjunction with spatial growth models to project land cover/land use changes in the future to assess impacts on natural and human ecosystems. We use multispectral thermal IR land cover maps at a high spatial resolution (60m) on a weekly basis for long-term validation of surface energy responses and changes in emissivity and integration of HyspIRI TIR data with spatial modeling to assess changes in land cover/land use through time and subsequent changes in thermal energy responses

Quattrochi, Dale A.↗

A Systems Model for System-Wide Safety Safety Demonstrator (SD-1): Wildfire Response Operations

The aim of this internship-based project was to contribute to the ongoing development of a systems model for System-Wide Safety’s first Technical Challenge 5 (TC5) series Safety Demonstrator (SD-1), which will be a demonstration of an In-Time Aviation Safety Management System (IASMS) in emerging wildfire response operations. Using Models-Based Systems Engineering (MBSE) principles to develop the model, I organized and traced previously collected stakeholder needs from the Spring 2022 NASA System-Wide Safety Wildland Firefighting Operations Virtual Workshop (https://nari.arc.nasa.gov/sws-wildfire) to system elements, creating connections which can be used in the future by the project engineers to identify and address requirements gaps throughout the system design process. I also identified and modeled preliminary use case scenarios for aerial assets in the demonstrator and, building on previously produced preliminary high-level models of the 8 SD-1 Services, Functions, and Capabilities (SFCs) and their IASMS data flows, worked to model the Real-Time Risk Assessment (RTRA) tool as an implementation of Risk Assessment and Management that can take in multiple sets of data monitored by SFCs. Project deliverables include stakeholder requirements tables and matrices and systems model diagrams produced with MagicDraw software in the SysML Systems Modeling Language, with eventual plans to connect model diagrams to a Department of Defense Operational Viewpoint (OV-1) graphic, a high-level operational concept graphic that will be used to visualize the SD-1 scenarioin a future phase. The system model serves to provide a common understanding of the scope of and activities necessary for the completion of SD-1,and traces how stakeholder needs are to be addressed.

model-based systems engineering↗

Evolving the Reuse Process at the Flight Dynamics Division (FDD) Goddard Space Flight Center

This paper presents the interim results from the Software Engineering Laboratory's (SEL) Reuse Study. The team conducting this study has, over the past few months, been studying the Generalized Support Software (GSS) domain asset library and architecture, and the various processes associated with it. In particular, we have characterized the process used to configure GSS-based attitude ground support systems (AGSS) to support satellite missions at NASA's Goddard Space Flight Center. To do this, we built detailed models of the tasks involved, the people who perform these tasks, and the interdependencies and information flows among these people. These models were based on information gleaned from numerous interviews with people involved in this process at various levels. We also analyzed effort data in order to determine the cost savings in moving from actual development of AGSSs to support each mission (which was necessary before GSS was available) to configuring AGSS software from the domain asset library. While characterizing the GSS process, we became aware of several interesting factors which affect the successful continued use of GSS. Many of these issues fall under the subject of evolving technologies, which were not available at the inception of GSS, but are now. Some of these technologies could be incorporated into the GSS process, thus making the whole asset library more usable. Other technologies are being considered as an alternative to the GSS process altogether. In this paper, we outline some of issues we will be considering in our continued study of GSS and the impact of evolving technologies.

Condon, S.↗

National Hydropower Plant Dataset, Version 1 (Update FY18Q2)

The National Hydropower Plant Dataset, Version 1, Update FY18Q2, includes geospatial point-level locations and key characteristics of existing hydropower plants in the United States that are currently online. These data are a subset extracted from NHAAP’s Existing Hydropower Assets (EHA) dataset, which is a cornerstone of NHAAP’s EHA effort that has supported multiple U.S. hydropower R&D research initiatives related to market acceleration, environmental impact reduction, technology-to-market activities, and climate change impact assessment.

13 HYDRO ENERGY↗

Achieving Actionable Results from Available Inputs: Metamodels Take Building Energy Simulations One Step Further

Modeling commercial building energy usage can be a difficult and time-consuming task. The increasing prevalence of optimization algorithms provides one path for reducing the time and difficulty. Many use cases remain, however, where information regarding whole-building energy usage is valuable, but the time and expertise required to run and post-process a large number of building energy simulations is intractable. A relatively underutilized option to accurately estimate building energy consumption in real time is to pre-compute large datasets of potential building energy models, and use the set of results to quickly and efficiently provide highly accurate data. This process is called metamodeling. In this paper, two case studies are presented demonstrating the successful applications of metamodeling using the open-source OpenStudio Analysis Framework. The first case study involves the U.S. Department of Energy's Asset Score Tool, specifically the Preview Asset Score Tool, which is designed to give nontechnical users a near-instantaneous estimated range of expected results based on building system-level inputs. The second case study involves estimating the potential demand response capabilities of retail buildings in Colorado. The metamodel developed in this second application not only allows for estimation of a single building's expected performance, but also can be combined with public data to estimate the aggregate DR potential across various geographic (county and state) scales. In both case studies, the unique advantages of pre-computation allow building energy models to take the place of topdown actuarial evaluations. This paper ends by exploring the benefits of using metamodels and then examines the cost-effectiveness of this approach.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrating High-Resolution Taskable Imagery into a Sensorweb for Automatic Space-Based Monitoring of Flooding in Thailand

Several space-based assets (Terra, Aqua, Earth Observing One) have been integrated into a sensorweb to monitor flooding in Thailand. In this approach, the Moderate Imaging Spectrometer (MODIS) data from Terra and Aqua is used to perform broad-scale monitoring to track flooding at the regional level (250m/pixel) and EO-1 is autonomously tasked in response to alerts to acquire higher resolution (30m/pixel) Advanced Land Imager (ALI) data. This data is then automatically processed to derive products such as surface water extent and volumetric water estimates. These products are then automatically pushed to organizations in Thailand for use in damage estimation, relief efforts, and damage mitigation. More recently, this sensorweb structure has been used to request imagery, access imagery, and process high-resolution (several m to 30m), targetable asset imagery from commercial assets including Worldview-2, Ikonos, Radarsat-2, Landsat-7, and Geo-Eye-1. We describe the overall sensorweb framework as well as new workflows and products made possible via these extensions.

sensorweb operations↗

Storm DEPART(Damage Estimate Prediction And Recovery Tool)

Damage prediction, materials needed, and resource allocation modeling capability in order to support pre-incident planning and preparation by predicting damage to the power generation capacity, transmission grids, distribution networks, and communications assets. The capabilities will be developed by multiple factors to include wind bands, storm surge, and flooding forecasts to participant’s assets which will result in a report of predicted damages. Additional factors to include available participants infrastructure data to include class, age, construction, location, wind rating, and additional information not in the public domain. Based on predicted damages, the output will be a bill of materials (BOM) to support short-term recovery operations. The extensiveness and level of detail for this BOM will depend on the replacement configuration specifications provided for each individual participant asset. Any limiting factors for the model will be applied related supply chain and resource constraints.

Klett, Mary↗

Utilization of Unsupervised Anomalies Detector as a Tool for Managing the TDRS Constellation at GSFC

NASA’s Goddard Space Flight Center (GSFC) operates a constellation of ten geosynchronous Tracking and Data Relay Satellites (TDRS). The mission of the TDRS constellation is to provide relay communications from low-earth orbiting spacecraft to the primary ground station at the White Sands Complex in Las Cruces, New Mexico. Major customers include the International Space Station and Hubble Space Telescope. The NASA Space Network project office at GSFC manages the constellation of spacecraft. The constellation is over 30 years old, and a wide range of technologies and manufacturing techniques are represented on-orbit. Since 1983, the TDRS constellation has recorded thousands of gigabytes of telemetry data. Spacecraft telemetry data has changed throughout the three generations of TDRS spacecraft, however each spacecraft has the same basic functions with some generational enhancements. The constellation includes several spacecraft that have significantly outlived the manufacturer's projected lifetime. This has provided NASA with a significant benefit in terms of return on investment, however it places a burden on efficient management of the assets for maximum life without permitting a TDRS spacecraft to become stranded in its geosynchronous orbital slot. Consequently, the highest level of attention is paid to systems whose failure could strand a TDRS spacecraft in orbit. In this paper, we proposed two stages of analyzing spacecraft anomalies using data mining (DM) to enhance on-going predictions of spacecraft life, subsystem performance, and analysis of subsystem anomalies. The first stage conducts the unsupervised anomaly detector to detect potential anomalies in real-time telemetry data. The second stage introduced telemetry weight (TW) to each telemetry parameter to determine which parameter caused the strongest anomaly. We will present case studies of some of these analyses and how the data can impact decisions on the management of the constellation.

Ma, Kenneth Y.↗

An Optimum Space-to-Ground Communication Concept for CubeSat Platform Utilizing NASA Space Network and Near Earth Network

National Aeronautics and Space Administration (NASA) CubeSat missions are expected to grow rapidly in the next decade. Higher data rate CubeSats are transitioning away from Amateur Radio bands to higher frequency bands. A high-level communication architecture for future space-to-ground CubeSat communication was proposed within NASA Goddard Space Flight Center. This architecture addresses CubeSat direct-to-ground communication, CubeSat to Tracking Data Relay Satellite System (TDRSS) communication, CubeSat constellation with Mothership direct-to-ground communication, and CubeSat Constellation with Mothership communication through K-Band Single Access (KSA).A Study has been performed to explore this communication architecture, through simulations, analyses, and identifying technologies, to develop the optimum communication concepts for CubeSat communications. This paper will present details of the simulation and analysis that include CubeSat swarm, daughter shipmother ship constellation, Near Earth Network (NEN) S and X-band direct to ground link, TDRS Multiple Access (MA) array vs Single Access mode, notional transceiverantenna configurations, ground asset configurations and Code Division Multiple Access (CDMA) signal trades for daughter mother CubeSat constellation inter-satellite crosslink. Results of Space Science X-band 10 MHz maximum achievable data rate study will be summarized. Assessment of Technology Readiness Level (TRL) of current CubeSat communication technologies capabilities will be presented. Compatibility test of the CubeSat transceiver through NEN and Space Network (SN) will be discussed. Based on the analyses, signal trade studies and technology assessments, the functional design and performance requirements as well as operation concepts for future CubeSat end-to-end communications will be derived.

CubeSat RF Communication↗

Modelling economic losses of historic and present-day high-impact winter windstorms in Switzerland

This study investigates the wind gusts and associated economic loss patterns of high-impact winter windstorms in Switzerland between 1871 and 2011. A novel approach for simulating windstorm-related gusts and losses at regional to local scales is applied to a sample of 84 windstorms. The approach involves the dynamical downscaling of the Twentieth Century Reanalysis (20CR) ensemble mean to 3-km horizontal grid size using the Weather Research and Forecasting (WRF) model. Economic losses are simulated at municipal level for present-day asset distribution based on the downscaled (parameterised) wind gusts at high spatiotemporal resolution using the open-source impact model climada. A comparison with insurance loss data for two recent windstorms (“Lothar” in 1999, “Joachim” in 2011) indicates that the loss simulation allows to realistically simulate the spatial patterns of windstorm losses. The loss amplitude is strongly underestimated for ‘Lothar’, while it is in reasonable agreement for ‘Joachim’. Possible reasons are discussed. Uncertainties concerning the loss simulation arise from the wind gust estimation method applied; estimates can differ considerably among the different methods, in particular over high orography. Furthermore, the quality of the loss simulation is affected by the underlying simplified assumptions regarding the distribution of assets and their susceptibilities to damage. For the whole windstorm sample, composite averages of simulated wind gust speed and loss are computed. Both composites reveal high values for the densely populated Swiss Plateau and lower values for south-eastern Switzerland; metropolitan areas stand out in the loss composite. Eight of the top 10 events concerning the losses simulated for present-day asset distribution and summed over all Swiss municipalities occurred after 1950. It remains uncertain whether this is due to decadal-scale changes of winter windstorms in Switzerland or merely due to a possible bias of the 20CR ensemble mean towards lower wind speeds in the period before around 1950.

20CR↗

Assessing wind power operating costs in the United States: Results from a survey of wind industry experts

This paper draws on a survey of wind industry professionals to clarify trends in the operational expenditures (OpEx) of U.S. land-based wind power plants. We find that average all-in lifetime OpEx has declined from approximately $80/kW-yr (~$35/MWh) for projects built in the late 1990s to a level approaching $40/kW-yr (~$11/MWh) for projects built in 2018. Turbine operations and maintenance costs represent the single largest component of overall OpEx and the primary source of cost reductions. We observe wide ranges of OpEx over time; respondents cite a range in average expected costs for recently commissioned projects from $33/kW-yr to $59/kW-yr. We also use historical OpEx learning rates, showing a 9% OpEx reduction for each doubling of global wind capacity, to project a further $5-$8/kW-yr reduction from 2018 to 2040. These findings suggest that continued OpEx reductions may contribute 10% or more of the expected reductions in land-based wind's levelized cost of energy. Moreover, these estimates understate the importance of OpEx owing to the multiplicative effects through which operational advancements influence not only operations and maintenance costs but also component reliability, performance, and plant-level availability - thereby also affecting levelized costs by enhancing annual energy production and plant lifetimes. Given the limited quantity and comparability of previously available OpEx data, the trends reported here may inform OpEx assumptions used by electric planners, analysts, and modelers. The results may also provide useful benchmarks to the wind industry, helping developers and asset owners compare their expectations with historical experience and other industry projections.

17 WIND ENERGY↗

Deep Analysis Net with Causal Embedding for Coal-fired Power Plant Fault Detection and Diagnosis (DANCE4CFDD)

Fault detection and diagnosis is critical to power plant operation to ensure attaining high reliability while reducing operation cost. As more renewable power is introduced to the power grid, traditional fossil power plants take on the extra burden of excessive load cycling to compensate the generation variability from renewable power. Such load cycling will pose more reliability challenges to power plant operation. There are a number of challenges faced by today’s asset health management system in coal- fired (or gas) power plants: 1) high-dimensional nonlinear interaction among multiple time series measurements; 2) high measurement variance induced by operational conditions/modes; 3) variation among asset types and plant configurations; and 4) a small number of faulty events to learn from. To cope with these challenges, today’s fielded asset health management systems rely heavily on manual efforts from domain experts and hand-crafted features or rules based on domain knowledge. Despite its role in plant reliability, such a practice is costly and hinders its scalability and sustainability, particularly when a plant undergoes modifications. The objective of this project is to develop a novel end-to-end AI learning system that is trainable (i.e., the AI representation of a complex system behavior can be directly learned from properly labeled data) for accurate fault detection and root cause analysis. The ability to create a fault detection model directly from time series could alleviate the efforts associated with today’s asset management solution development. In the course of this project, we have achieved the following: Created an AI model development environment incorporating state-of-the-art neural network architectures for rapid model development and evaluation; Developed novel learning strategies for training of fault detection model; Developed special-purpose neural network architecture embedded with variable association graph aiming for better interpretability; Developed a learning strategy to leverage a small number of faulty events for enhanced fault detection capability; Conducted detailed experimental study based on public benchmark datasets and demonstrated the effectiveness of the proposed solution; and Validated the developed system with data from both a coal-fired plant boiler dynamic simulation model and real-world coal-fired power plant covering multiple asset and fault types. Overall, the project attained a technology readiness level of TRL 5 from TRL 2 at the beginning of the project.

20 FOSSIL-FUELED POWER PLANTS↗