Search NASA⌕ Search

SEARCH · Search NASA

Results for “assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Can Radiation Therapy Quality Assurance Improve Nasopharyngeal Cancer Outcomes in Low- and Middle-Income Countries: Reporting the First Phase of a Prospective International Atomic Energy Agency Study

Most new nasopharyngeal cancer cases occur in low-income and middle-income countries, and these patients experience poorer overall survival than that of new nasopharyngeal cancer cases in high-income countries. The goal of this research project is to determine whether the introduction of a radiation therapy quality assurance program can ultimately improve outcomes for nasopharyngeal cancer patients in lower-income and middle-income countries. This study reports the results of the first phase of the International Atomic Energy Agency Coordinated Research Project (325-E3-TM-47712).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Quality Assurance methodology for the ATLAS Inner Tracker strip sensor production

The production of the strip sensors for the ATLAS Inner Tracker (ITk) will start in 2020. Nearly 22,000 large area sensors will be produced over a period of about five years by Hamamatsu Photonics K.K. (HPK). The institutes involved in the sensor development and production are committed to deliver and maintain the highest quality sensors for the experiment. A Quality Assurance (QA) strategy has been prepared to be carried out during the whole production period. Once the process has been characterized as providing the required pre-irradiation specifications and the proper radiation hardness, the onus is on the manufacturer to rigidly stick to that qualified process. Still, sample testing with specific device-element structures and irradiation of devices should be implemented by the ITk sensor collaboration. A detailed irradiation and testing plan has been prepared by the ATLAS-ITk Collaboration, together with a newly designed test chip with specific structures to monitor different key technological and device parameters during the whole production. The tests and irradiations will be carried out on a sample basis. In order to have a practical methodology, samples from alternating batches will be sent for irradiations with protons, neutrons and gammas, and then tested in order to check that the characteristics remain within specifications. Here we present the detailed plan and the design and test methods for the structures in the test chip.

47 OTHER INSTRUMENTATION↗

Continuous Integration, In-Code Documentation, and Automation for Nuclear Quality Assurance Conformance

The Multiphysics Object Oriented Simulation Environment (MOOSE) is an open-source, finite element framework for solving highly coupled sets of nonlinear equations. The development of the framework and applications occurs concurrently using an agile, continuous-integration software package. Included in the framework is an in-code, extensible documentation system. Using these two tools in union with the repository management tools GitHub and GitLab, a software quality plan was created and followed such that MOOSE and a MOOSE-based application (BISON) have been shown to meet the American Society of Mechanical Engineers’ Nuclear Quality Assurance-1 standard. The approach relies heavily on automation for both testing and documentation. The resulting effort demonstrates that a rigorous software quality plan may be implemented that incurs a minimal impact on day-to-day development of the software, satisfying the stringent guidelines necessary to operate the software in a safety function within a nuclear facility.

97 MATHEMATICS AND COMPUTING↗

A functional modeling approach for quality assurance in metal additive manufacturing

Purpose: Due to the complexity of and variations in additive manufacturing (AM) processes, there is a level of uncertainty that creates critical issues in quality assurance (QA), which must be addressed by time-consuming and cost-intensive tasks. This deteriorates the process repeatability, reliability and part reproducibility. So far, many AM efforts have been performed in an isolated and scattered way over several decades. Here, a systematically integrated holistic view is proposed to achieve QA for AM. Design/methodology/approach: A systematically integrated view is presented to ensure the predefined part properties before/during/after the AM process. It consists of four stages, namely, QA plan, prospective validation, concurrent validation and retrospective validation. As a foundation for QA planning, a functional workflow and the required information flows are proposed by using functional design models: Icam DEFinition for Function Modeling. Findings: The functional design model of the QA plan provides the systematically integrated view that can be the basis for inspection of AM processes for the repeatability and qualification of AM parts for reproducibility. Research limitations/implications: A powder bed fusion process was used to validate the feasibility of this QA plan. Feasibility was demonstrated under many assumptions; real validation is not included in this study. Social implications: This study provides an innovative and transformative methodology that can lead to greater productivity and improved quality of AM parts across industries. Furthermore, the QA guidelines and functional design models provide the foundation for the development of a QA architecture and management system. Originality/value: This systematically integrated view and the corresponding QA plan can pose fundamental questions to the AM community and initiate new research efforts in the in-situ digital inspection of AM processes and parts.

36 MATERIALS SCIENCE↗

Evidence Theory Representations for Properties Associated With Weak Link/Strong Link Systems, Part 1: Loss of Assured Safety

The use of evidence theory in the analysis of loss of assured safety (LOAS) for weak link (WL)/strong link (SL) systems is introduced and illustrated. Furthermore, article content includes (i) an introduction to evidence theory, (ii) definition of two WLs and two SLs used for illustration, (iii) belief and plausibility for the occurrence of LOAS for a one WL/two SL system, and (iv) a sampling-based procedure for the verification of belief and plausibility calculations. The presented results can be generalized to systems with more than one WL and two SLs.

42 ENGINEERING↗

Performance Assurance Planning Guide for Utility Energy Service Contracts: 2025 Edition

Administered by the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), the Utility Program has fostered collaboration among federal agencies and their serving utilities for more than 25 years. The Utility Program supports agencies using Utility Energy Service Contracts (UESCs), a well-developed, effective contracting vehicle that enable the latest approaches to cost-effective energy management at federal sites. Federal agencies have successfully used UESCs to award over 2,000 energy and water efficiency and renewable energy projects, investing approximately $\$$2.8 billion in furthering the Federal Government's efforts to reduce energy intensity. Authorized by 42 U.S. Code section 8256 (10 U.S. Code section 2913 for the Department of Defense), a UESC is a limited-source acquisition between a federal agency and an eligible serving utility for energy management services that generate savings from the implementation of energy- and water -conservation measures (collectively referred to as ECMs), with 42 U.S. Code section 8287 (Defense Federal Acquisition Regulation Supplement, Part 241), providing the term of a UESC, which may extend up to 25 years. Through a UESC, the utility partner assesses designs, and implements the desired ECMs - which can range from lighting retrofits and renewable energy systems, to combined heat and power plants or other technologies and strategies, and may provide financing for the project. The agency may use any combination of appropriations and third-party financing to pay for the project, providing useful flexibility. There is no limit to the project size, big or small, that can be implemented using a UESC. To assist agencies implementing a UESC, FEMP has developed a Utility Energy Service Contract Guide and this companion guidance document to help agencies and their utility partners better understand the best practices for to ensure UESCs continue to perform and generate savings throughout their performance period. These best practices utilize a combination of effective project management, communication, documentation, and a detailed Performance Assurance Plan. This plan is a project specific set of actionable protocols that define important tasks and responsibilities throughout the contract term and reflects the site conditions, complexities, agency capabilities, and operating and maintaining planned ECMs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Field Insights: Strengthening Digital Assurance Through On-Site Network Monitoring

The accelerating deployment of digital energy infrastructure, ranging from inverter-based resources (IBRs), battery energy storage systems (BESS), to advanced grid control platforms, has brought unprecedented visibility, flexibility, and efficiency to the electric grid. However, this digital transformation also introduces new cybersecurity challenges, particularly in the form of supply chain risks and operational blind spots at the grid edge. Over the past year, the Department of Energy’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER), through its Rapid Risk Assessment initiative, along with the Grid Deployment Office (GDO), through its Technical Assistance for Digital Assurance (TADA) initiative, have supported a series of on-site network engagements led by Idaho National Laboratory (INL). These engagements, conducted in partnership with asset owners across the country, have focused on identifying real-world vulnerabilities and misconfigurations in operational environments, many of which are not detectable through remote assessments or traditional compliance audits. The goal of this report is to distill key findings and lessons learned during network hunt engagements from INL’s fiscal year (FY) 2024 - 2025. It is intended to help asset owners—regardless of their participation in the program—better understand the evolving threat landscape and adopt practical measures to secure their digital energy infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Safety-assured, real-time neural active fault management for resilient microgrids integration

Federated-learning-based active fault management (AFM) is devised to achieve real-time safety assurance for microgrids and the main grid during faults. AFM was originally formulated as a distributed optimization problem. Here, federated learning is used to train each microgrid's network with training data achieved from distributed optimization. The main contribution of this work is to replace the optimization-based AFM control algorithm with a learning-based AFM control algorithm. The replacement transfers computation from online to offline. With this replacement, the control algorithm can meet real-time requirements for a system with dozens of microgrids. By contrast, distributed-optimization-based fault management can output reference values fast enough for a system with several microgrids. More microgrids, however, lead to more computation time with optimization-based method. Distributed-optimization-based fault management would fail real-time requirements for a system with dozens of microgrids. Controller hardware-in-the-loop real-time simulations demonstrate that learning-based AFM can output reference values within 10 ms irrespective of the number of microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ORCA Software Quality Assurance Plan

This document summarizes the software quality assurance (SQA) planning activities conducted for the Optimization of Real-time Capacity Allocation (ORCA) plug-in. It outlines the approaches and document structures adopted to maintain high standards of software quality. It also gives examples of certain SQA documents.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cyber-Enabled Sabotage, Critical Function Assurance, and Cyber-Informed Engineering

Cyber-enabled Sabotage, Critical Function Assurance, and Cyber-Informed Engineering: This discussion will introduce the idea of cyber-enabled sabotage, and the role engineering plays in the cyber defense of critical functions with a focus on electric power systems. It will outline how and why engineering practice must be used to apply cybersecurity principles to establish safe and reliable operations even in the face of determined and skilled adversaries, and give an overview of INL’s Consequence-Driven Cyber-Informed Engineering methodology to apply these principles. There will be an opportunity for audience questions and answers at the end of the session.

42 ENGINEERING↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Challenging problems of quality assurance and quality control (QA/QC) of meteorological time series data

Abstract Representativeness and quality of collected meteorological data impact accuracy and precision of climate, hydrological, and biogeochemical analyses and predictions. We developed a comprehensive Quality Assurance (QA) and Quality Control (QC) statistical framework, consisting of three major phases: Phase I—Preliminary data exploration, i.e., processing of raw datasets, with the challenging problems of time formatting and combining datasets of different lengths and different time intervals; Phase II—QA of the datasets, including detecting and flagging of duplicates, outliers, and extreme data; and Phase III—the development of time series of a desired frequency, imputation of missing values, visualization and a final statistical summary. The paper includes two use cases based on the time series data collected at the Billy Barr meteorological station (East River Watershed, Colorado), and the Barro Colorado Island (BCI, Panama) meteorological station. The developed statistical framework is suitable for both real-time and post-data-collection QA/QC analysis of meteorological datasets.

54 ENVIRONMENTAL SCIENCES↗

Correlation approach for quality assurance of additive manufactured parts based on optical metrology

Surface topography and surface finish are two significant factors for evaluating the quality of products in additive manufacturing (AM). AM parts are fabricated layer by layer, which is quite different from traditional formative or subtractive methods. Despite rapid progress in additive manufacturing and associated optical metrology for quality control and in-situ monitoring, limited research has been conducted to investigate the reliability of 3D surface measurement data. The surface topologies scanned by multiple optical systems demonstrated significant differences due to varying sampling mechanisms, resolutions, system noises, etc. The 3D datasets should be trustworthy in order to extract parameters for quality assurance or feedback control from 3D surface measurements. In this paper, we set up new standards to evaluate the reliability of 3D surface measurement data and analyze the variation in the topographical profile. In this study, two non-contact optical methods based on Focus Variation Microscopy (FVM) and Structured Light System (SLS) were adopted to measure the surface topography of the target components. The two optical metrology systems generated two entirely different point cloud datasets. Statistical methods were applied to test the difference between the data obtained from the two systems. By using a data analytics approach for comparison, it was found that the surface roughness estimated from the point cloud data sets of FVM and SLS has no significant difference, though the point cloud data sets were completely different. This paper provides standard validation approach to evaluate the plausibility of metrology data from in-situ real-time surface analysis for process planning of AM.

36 MATERIALS SCIENCE↗

Quality assurance test of silicon photomultipliers and electronic boards for STAR event plane detector

The event plane detector (EPD), installed in the Solenoid Tracker at the Relativistic Heavy-Ion Collider located at the Brookhaven National Laboratory is a plastic scintillator-based device that measures the reaction centrality and event plane in the forward region of the relativistic heavy-ion collisions. We used silicon photomultiplier (SiPM) arrays to detect the photons produced in the scintillator via the fiber connection. Signals from the SiPM arrays were amplified by the front-end electronic (FEE) board, and sent to the analog-to-digital converter (ADC) boards for further processing via the receiver (RX) board. The full EPD system consisted of 24 super-sectors (SSs); each SS was equipped with two SiPM boards, two FEE boards and two RX boards, and they corresponded to 744 readout channels. All these boards were mass produced at the University of Science and Technology of China, with a dedicated quality assurance (QA) procedures applied to identify any problems before deployment. This article describes the details of the QA method and the related test system. As a result, the QA test results are presented along with the discussions.

EPD↗

Pre-production results from ATLAS ITk Strip Sensors Quality Assurance Testchip

The production of strip sensors within the framework of the ATLAS Inner Tracker (ITk) development is a process which requires continuous evaluation during the full production period (about 4 years). Such an evaluation is divided into two different parts: Quality Control (QC), which focuses on the final product (the actual sensors) and tries to identify possible defects once the fabrication is completed, and Quality Assurance (QA), which aims to prevent deviations in the manufacturing process and uses specifically-designed test structures. The initial sensor pre-production consists of 5% (1041 sensors) of the total number of sensors expected during production. As part of pre-production, the collaboration has measured key parameters from miniature strip sensors (minis), monitor diodes (MD8), and the ATLAS Testchip, before and after irradiation. In this contribution we focus on the analysis of the results of the MD8 and the Testchip. All parameters have been obtained from the test structures (MD8, bias resistors, interdigitated structures, field oxide capacitors, coupling capacitors, punch-through protection structures and cross-bridge resistors) measured at the different test sites (KEK/Tsukuba, Birmingham, Toronto, Ljubljana, Valencia, Carleton, Prague, CNM-Barcelona). The results are compared to predefined pre- and post-irradiation specifications for each tested parameter.

47 OTHER INSTRUMENTATION↗

Establishing the Quality Assurance programme for the strip sensor production of the ATLAS tracker upgrade including irradiation with neutrons, photons and protons to HL-LHC fluences

The successful pre-production delivery of strip sensors for the new Inner Tracker (ITk) for the upgraded ATLAS detector at the High Luminosity LHC (HL-LHC) at CERN was completed and based on their performance full production has commenced. The overall delivery period is anticipated to last 4 years to complete the approximately 22000 sensors required for the ITk. For Quality Assurance (QA), a number of test structures designed by the collaboration, along with a large area diode and miniature version of the main sensor, are produced in every wafer by the foundry Hamamatsu Photonics K.K (HPK). As well as Quality Control (QC) checks on every main sensor, samples of the QA pieces from each delivery batch are tested both before and after irradiation with results after exposure to neutrons, gammas or protons to fluences and doses corresponding to those anticipated after operation at the HL-LHC to roughly 1.5 times the ultimate integrated luminosity of 4000 fb -1 . In this paper the procedures are presented and the studies carried out to establish that the seven ITk QA Strip Sensor irradiation and test sites meet all the requirements to support this very extensive programme throughout the strip sensor production phase for the ITk project.

47 OTHER INSTRUMENTATION↗