Search NASA⌕ Search

SEARCH · Search NASA

Results for “backfilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Low Particulates Nitrogen Purge and Backfill During Prototype HB650 Cryomodule String Assembly

A low particulate vacuum and purging system was developed to support PIP-II cryomodule string assembly. The overpressure can be controlled at a precision of 1 mbar above the atmospheric pressure regardless of the cavity or string assembly air volume. The system minimized the risk of uncontrolled nitrogen flow during the string assembly. Design features are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of weld metal microstructure in a Ni-30Cr alloy with additions of niobium and molybdenum

Additions of niobium (Nb) and molybdenum (Mo) were made to an Alloy 690 base alloy in order to investigate the formation of a eutectic constituent at the end of solidification and to evaluate the effect of the eutectic liquid on backfilling (or healing) of solidification cracks. Solidification cracking was induced using the cast pin tear test (CPTT) and regions of backfilling were located and characterized via optical and electron microscopy. Computational predictions of fraction eutectic and composition of the eutectic constituent were compared to experimental findings and were found to correlate well in both cases. The extent of crack backfilling increased significantly with increasing Nb content, but the addition of Mo did not seem to influence the amount of eutectic constituent or the degree of backfilling. SEM/EDS analysis confirmed that the eutectic composition is constant and that increasing Nb above 4 wt% has little effect on expanding the solidification temperature range, but has a beneficial effect on mitigating solidification cracking by a crack healing effect. - Highlights: • Increasing fraction eutectic as a function of Nb, as predicted by ThermoCalc™, is consistent with image analysis results. • Nb, unlike Mo, had a significant effect on the fraction eutectic formed. • Both influence the composition of the eutectic. • Thermocalc™ predictions regarding Nb content in eutectic are consistent with EDS results, but are high for the Mo content. • Increased levels of niobium resulted in a higher degree of crack backfilling and leads to a lower cracking susceptibility. • Mo may influence the eutectic liquid along solidification grain boundaries, improving backfill and thus cracking resistance.

36 MATERIALS SCIENCE↗

Modeling nuclear waste disposal in crystalline rocks at the Forsmark and Olkiluoto repository sites – Evaluation of potential thermal–mechanical damage to repository excavations

We conduct coupled thermo-hydro-mechanical modeling of a KBS-3V repository design in crystalline rocks, using data and conditions from the Forsmark in Olkiluoto repository sites in Sweden and Finland. The study focuses on repository performance related to the impact of thermal and hydraulic evolution on the potential for thermal–mechanical damage to underground repository excavations. For the designs and conditions considered at the Forsmark and Olkiluoto repository sites, the simulations show a peak temperature well under the adopted performance target of a 100°C maximum temperature, whereas there is still a high potential for thermal–mechanical damage to the KBS-3V waste deposition holes. The thermal–mechanical damage is much more likely if rock permeability is so low that it delays saturation and swelling of bentonite-clay-based backfill beyond the time for the thermal–mechanical peak, which occurs 50 to 100 years after nuclear waste deposition. We also found that sidewalls of the KBS-3V emplacement tunnels are vulnerable to tensile fracturing due to the combined effect of thermal stressing and backfill swelling. The study highlights a strong interaction between bentonite-based backfill and host rock through capillary suction along with induced rock desaturation. A careful design and selection of the bentonite-clay-based backfill materials for KBS-3V tunnels and deposition holes can facilitate a timely saturation and backfill swelling that in turn can minimize thermal–mechanical damage.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conservation of Helium while Maintaining High System Purity

Recent helium shortages and helium price increases have lead to an increased emphasis being placed on conserving helium. The need to conserve helium must be balanced with need to maintain the high levels of purity necessary to prevent operational problems caused by contamination. Helium losses and contamination control are especially important for test stands that have cryogenic distribution systems operating continuously with frequent changeover of cryogenic temperature components that are being tested. This paper describes a mathematical model to estimate the quantity of helium lost and the purity of the helium after the pump and backfill procedure is complete. The process to determine the optimal time during pump down to cut off pumping and start backfilling is described. There is a tradeoff between trying to achieve the lowest possible pressure during pumping and the quantity of air leaking into the volume while pumping is occurring. An additional benefit of careful sel ection of pump and backfill parameters in conjunction with real-time pressure monitoring can reduce the labor and time required to complete a successful pump and backfill procedure. This paper is intended to be a tool for engineers to review their pump and backfill procedures and measured data to optimize helium losses, system purity, and labor required.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Electrical Resistivity Tomography Monitoring of In Situ Soil Flushing at the Hanford 100-K East Area: 100KE Soil Flushing Monitoring

Former operations in the 100-KE Area at the Hanford Site resulted in vadose zone hexavalent chromium that provides a source of groundwater contamination. Previous efforts to remediate vadose zone chromium involved excavation and offsite treatment of contaminated soils. Although much of the chromium was removed, contamination still exists in native soil between the water table and the bottom of the pit, which has since been backfilled. In-situ soil flushing was tested at the 100-KE Area to accelerate the removal of the remaining hexavalent chromium in the vadose zone. Soil flushing works by applying clean flush water at the surface, which mobilizes and transports chromium as it migrates downward to the water table. Once the chromium reaches the water table, it is hydraulically contained, extracted, and treated through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. Therefore, performance monitoring requires and understanding of flush water migration through the vadose zone. It is challenging to comprehensively assess soil flushing performance via borehole access due to the limited volume of investigation afforded by a given wellbore. As an alternative, 3D time-lapse electrical resistivity tomography (ERT) was tested as a method of monitoring the distribution of flush water over time within the vadose zone. ERT is a method of imaging the bulk electrical conductivity of the subsurface, which is highly dependent on water saturation levels in unconsolidated and unsaturated sediments. Thus, the timing and location of changes in bulk conductivity caused by soil flushing can be used to infer flush water migration pathways. In this report we present results of 3D time-lapse ERT imaging during two separate soil flushing campaigns conducted during the spring and summer months of 2022 and 2023. Results show generally that: 1) Pit backfill materials appear to nominally have larger permeability than native soils. Consequently, the boundary between pit backfill and native soil had a significant impact on flush water migration, causing some flush water to migrate along the pit boundary to the bottom of the pit. 2) Non-uniform flows, likely caused by variations in hydrogeologic properties, developed in the pit backfill materials, resulting in uneven flush water distribution on the southern margin of the soil flushing zone. 3) Redistribution of water at the interface between backfill materials and Hanford formation materials likely facilitated elevated and uniform distribution of flush water within native soils beneath the deeper parts of the pit boundary beneath the center of the flush zone, which presumably overlie soils with elevated chromium contamination. These areas appear to have been infiltrated by higher volumes of flush water than the northern and southern margins of the flush zone. 4) In comparison to 2022, high flush water application rates significantly improved flush water distribution throughout the target flushing zone. 5) Imaging resolution was limited to a depth of approximate 20 meters below the land surface, due primarily to limitations on the lateral extent of the surface ERT array. The ~10 m region of the vadose zone between approximately 130 meters elevation and the water table at approximately 120 meters elevation was unresolved.

100 Area↗

Conservation of Helium while Maintaining High System Purity

Recent helium shortages and helium price increases have lead to an increased emphasis being placed on conserving helium. The need to conserve helium must be balanced with need to maintain the high levels of purity necessary to prevent operational problems caused by contamination. Helium losses and contamination control are especially important for test stands that have cryogenic distribution systems operating continuously with frequent changeover of cryogenic temperature components that are being tested. This paper describes a mathematical model to estimate the quantity of helium lost and the purity of the helium after the pump and backfill procedure is complete. The process to determine the optimal time during pump down to cut off pumping and start backfilling is described. There is a tradeoff between trying to achieve the lowest possible pressure during pumping and the quantity of air leaking into the volume while pumping is occurring. An additional benefit of careful selection of pump and backfill parameters in conjunction with real-time pressure monitoring can reduce the labor and time required to complete a successful pump and backfill procedure. This paper is intended to be a tool for engineers to review their pump and backfill procedures and measured data to optimize helium losses, system purity, and labor required.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Refinement of Modeling Techniques for the Structural Evaluation of Hanford Single-Shell Nuclear Waste Storage Tanks - 12288

The single-shell tanks at the Hanford Site (in Washington State, USA) were constructed between 1943 and 1964 and are well beyond their estimated 25 year design life. This article discusses the structural analysis approach and modeling challenges encountered during the ongoing analysis of record for evaluating the structural integrity of the single-shell tanks. There are several geometrical and material nonlinearities and uncertainties to be dealt with while performing the modern finite element analysis of these tanks. The analysis takes into account the temperature history of the tanks and allowable mechanical operating loads for proper estimation of creep strains and thermal degradation of material properties. The loads prescribed in the analysis of record models also include anticipated loads that may occur during waste retrieval and closure. Due to uncertainty in a number of modeling details, sensitivity studies were conducted to address questions related to boundary conditions that realistically or conservatively represent the influence of surrounding tanks in a tank farm, the influence of backfill excavation slope, the extent of backfill and the total extent of undisturbed soil surrounding the backfill. Because of the limited availability of data on the thermal and operating history for many of the individual tanks, some of the data was assumed or interpolated. However, the models developed for the analysis of record represent the bounding scenarios and include the loading conditions that the tanks were subjected to or anticipated. The modeling refinement techniques followed in the analysis of record resulted in conservative estimates for force and moment demands at various sections in the concrete tanks. This article discusses the modeling aspects related to Type-II and Type-III single-shell tanks. The modeling techniques, methodology and evaluation criteria developed for evaluating the structural integrity of single-shell tanks at Hanford are in general applicable to other similar tanks or underground concrete storage structures. This article presented the details of the finite element models and analysis approach followed during the ongoing effort to establish structural integrity of single shell tanks at the Hanford site. The details of the material constitutive models applicable to the underground Hanford concrete tanks that capture the thermal and creep induce degradation are also presented. The thermal profiles were developed based on the available tank temperature data for the Type II and Type III single-shell tanks, and they were chosen to yield conservative demands under the thermal and operating loads analysis of these tanks. Sensitivity studies were conducted to address two issues regarding the soils modeled around the single-shell tanks. The results indicate that excluding the boundary separating the backfill soil from the undisturbed soil will result in conservative demands (plots 14b and 14c green lines for circumferential Demand/Capacity ratios). The radial extent study indicated that the soil model extending to 240 ft gave more conservative results than the model with 62 ft of soil (plots 17a and 17c magenta lines for hoop Demand/Capacity ratios). Based on these results, a 240 ft far-field soil boundary with backfill throughout the lateral extent was recommended and used for the finite element models used in the Type-II and Type-III analyses of record. The modeling effort and sensitivity studies discussed in this article helped in developing bounding models for the structural integrity evaluation of single shell tanks at the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering for Operation of a Future Belgian Deep Geological Repository for ILW and HLW - 12379

In Belgium, an advanced conceptual design is being elaborated for deep geologic disposal of high level waste (HLW) and for low and intermediate level waste (LILW) not amenable for surface disposal. The concept is based on a shielded steel and concrete container for disposal of HLW, i.e., the Super-container. LILW will be disposed of in separately designed concrete caissons. The reference host rock is the Boom Clay, a poorly indurated clay formation in northeastern Belgium. Investigations into the potential host rock are conducted at the HADES underground research laboratory in Mol, Belgium. In 2009 the Belgian Agency for Management of Radioactive Waste and Enriched Fissile Materials (ONDRAF/NIRAS) initiated a four year research project aimed at confirming the fundamental feasibility of building and operating a repository. The goal of the program is to demonstrate at a detailed conceptual level that the proposed geologic disposal system can be safely constructed, operated, and progressively closed. Part of the broader research efforts being conducted includes evaluations optimization of the waste transportation shaft, subsurface transportation system, ventilation system, and evaluation of backfilling and sealing concepts for the repository design. The potential for implementation of a waste retrieval strategy encompassing the first 100 years after emplacement is also considered. In the framework of a four year research program aimed at confirming the fundamental feasibility of building and operating a repository in poorly indurated clay design studies have been underway to optimize the waste transportation shaft, subsurface transportation system, and ventilation system. Additionally backfilling and sealing concepts proposed for the potential repository have been reviewed in conjunction with impacts related to the potential future inclusion of a retrievability requirement in governing regulations. The main engineering challenges in the Belgian repository concept are size limitations on the underground facilities imposed by the mechanical behavior of the candidate host rock type (i.e., poorly indurated clay) and the resulting ground support requirements. Underground excavations in the Boom Clay require a significant level of ground support to ensure the openings remain stable. A concrete lining system has been developed to address this engineering requirement. As a result strict size limits are imposed on both the diameter of the tunnels and the dimensions of the shaft stations resulting in unique design challenges requiring maximal optimization of the available space. Ongoing studies indicate that a significant (20%) reduction in shaft diameter can be achieved by diagonally orienting the hoist guide rails with respect to the cage, optimizing the counter weight dimensions, and reconfiguring the auxiliary hoisting system as a single rope system. Reliable subsurface transportation of waste packages can be achieved through a hybrid rail/wheel system powered by a battery operated electric locomotive. Key components of the system, including the battery-powered locomotive and a turntable used for transitioning waste shipments from the access gallery into disposal galleries without the need for constructing turnouts, have been successfully demonstrated at the Gorleben exploratory facility and the Konrad repository in Germany, respectively. By optimizing the available space in the disposal galleries and limiting the introduction of hazardous gases by using electric powered systems combined with the relatively small number of workers envisioned in the Belgian repository concept adequate ventilation can be achieved to ensure safe operational conditions. The proposed sealing and backfill systems in the Belgian repository concept should provide adequate safeguards as currently planned. Should a future retrievability requirement be imposed on the design it appears likely that a partial backfilling strategy could be employed. The key component in ensuring retrievability in the design would be the selection of a backfill that combines the safety functions required in the current design concept with a material strength amenable to removal by hydro-jet excavation techniques. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility studies for the design of disposal vaults for multi-purpose containers (MPCs): construction, operation, ventilation and management of heat - 15175

The Nuclear Decommissioning Authority (NDA) subsidiary, Radioactive Waste Management Ltd (RWM) is responsible for the safe implementation of a Geological Disposal Facility (GDF) for radioactive waste in the UK. As part of their generic programme to underpin the planned designs for a GDF, work is ongoing to explore a range of possible geological disposal concepts. This work developed GDF concept designs for Multi-Purpose Containers (MPC) disposal in the generic host rock types considered: higher strength (crystalline), lower strength sedimentary (sedimentary / clay formations) and evaporite rocks. This paper is specific to concepts for the disposal of MPC for Pressurised Water Reactor (PWR) spent nuclear fuel (SF). The key outcomes of the feasibility studies to improve the understanding of the MPC disposal concept and the specific challenges to construct, operate, ventilate, manage heat and backfill associated with this concept are summarised in this paper. The management of the high loading of radiogenic heat (from 12 PWR SF assemblies in MPCs compared to 4 in 'standard' disposal containers) during an extended open phase (delayed backfilling of the disposal area) of up to 300 years was investigated. The concept designs developed demonstrate it is feasible to construct, operate and ventilate disposal vaults to accommodate open 'storage' periods required for transitional thermal decay of high heat generating waste in higher strength and lower strength sedimentary host rock types considered by RWM. This work focused on developing two contrasting disposal concepts which are applicable to both higher strength and lower strength rock environments; both of which illustrate how vault temperature, stability and groundwater inflows can be controlled to delay backfilling and allow MPC package thermal output to decrease. MPC disposal in evaporite rock does not require a cooling period due to its high thermal conductivity and favourable performance at higher temperatures; therefore the concept developed for this rock includes immediate backfilling of disposal tunnels. A clear understanding of the interactions and limitations associated with heat management during the open period was developed by investigation of a 'Heating Ventilation and Air-Conditioning System' (HVAC). It was concluded that removal of heat from the disposal tunnels / vaults is feasible, but introduces significant operational complexity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deposition Behavior of Supersaturated Silicic Acid on Ca-type Bentonite in Geological Disposal System - 16033

For backfilling tunnels in geological disposal systems, the degradation of the low permeability of Na-type bentonite by ion-exchanging to Ca-type is a concern. The deposition of silicic acid around a repository with the dramatic change in pH due to the use of cement causes the clogging of the flow-path and pore space. Such effect may contribute to a more effective barrier performance for radionuclide migration in the backfill. As a first step to clarifying the clogging effect in the backfill, this study examined the deposition of supersaturated silicic acid on Ca-type bentonite. In the deposition experiments, the supersaturated silicic acid solution (250 ml, 4-10 mM, pH>10) was poured into a polyethylene vessel containing Ca-type bentonite (2.5-10.0 g). The deposition of silicic acid was started by setting the pH to 8. As a result, supersaturated silicic acid significantly deposited on Ca-type bentonite under all experimental conditions of supersaturated silicic acid concentration. The experimental results showed that the deposition rate-constants were in the order of 10-11 m/s. Our previous study showed the clogging effect in rocks by using numerical simulation with the same order rate-constants. These findings suggest that the deposition of supersaturated silicic acid on Ca-type bentonite causes the retention of low permeability and the retardation effect for radionuclides by the clogging effect in backfilled tunnels. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heat‐Generating Nuclear Waste in Salt: Field Testing and Simulation

Core Ideas A field‐scale experiment and numerical simulations confirm salt backfill behavior. Simulations closely match temperature around and under the piled salt backfill. Results indicate limited dissolution–precipitation reactions around the heat source. Alteration of backfill is unlikely if the drift is allowed to dry before emplacement. Investigations relating to in‐drift disposal of heat‐generating nuclear waste in salt have raised questions about heat–brine interactions in the unsaturated run‐of‐mine (RoM) salt pile used as backfill. These interactions have the potential to change the structure of the RoM salt surrounding the canister, possibly altering long‐term containment of the source. An experiment is in progress at the Waste Isolation Pilot Plant (WIPP), New Mexico, in which a heated canister was placed on the floor of an open drift, covered in a pile of RoM salt, and energized with 1000 W. Temperature in the RoM salt pile had stabilized after about 15 d, allowing evaluation of the heat‐up period of the ongoing experiment. Using a multiphase porous flow simulator that has been modified to handle salt‐specific coupled processes, we examined coupled thermal–hydrological–chemical behavior in the RoM salt pile. Our simulations suggest that for the relatively dry cases examined, porosity changes within RoM salt in a generic salt repository are likely to be minor in the period between waste emplacement and plastic closure of the drift. The primary sensitivity for porosity change is to the early moisture content of the RoM salt used to cover the canister. Secondary influences include moisture availability from the disturbed rock zone (DRZ) surrounding the drift and the capillary pressure ratio between the DRZ and the RoM salt. Early changes in porosity and permeability may be affected by moisture content, but this was not observed in the test. Such changes would be most likely to occur when using damp RoM salt or if waste is emplaced in a drift immediately following opening of the drift before evaporative dewatering of the drift walls occurs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗