Search NASA⌕ Search

SEARCH · Search NASA

Results for “coal fired power plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Development of novel dynamic machine learning-based optimization of a coal-fired power plant

The increasing fraction of intermittent renewable energy in the electrical grid is resulting in coal-fired boilers now routinely ramp up and down. The current state-of-the-art operation for such boilers is to apply steady-state, neural network-based optimization to make control decisions in real-time, and this report demonstrates the feasibility of extending this to dynamic, neural network-based optimization using a long short-term memory neural network. A simplified numerical simulation of a t-fired coal boiler and supporting equipment is used to represent a real plant subjected to both steady-state, neural network-based optimization and dynamic, neural network-based optimization. Using the same intervals and a particle swarm optimization algorithm, the dynamic optimization outperforms the steady-state optimization and realizes up to 4.58% improvement in thermal efficiency. Dynamic optimization with a long short-term memory neural network is shown to both be feasible and beneficial for operation of a coal-fired boiler under changing load.

42 ENGINEERING↗

AOI.1 Application of Artificial Intelligence techniques enabling coal fired power plants the ability to achieve higher efficiency, improved availability, and increased reliability of their operations (Final Report)

During this effort, SparkCognition with support from the Electric Power Research Institute (EPRI) was tasked with applying artificial intelligence (AI) to improve the reliability, efficiency, and safety of operations at a coal-fired plant. By implementing AI techniques, like machine learning (ML), it is believed that operators can leverage existing data sources to gain more insights such as advanced warning of machine degradation. With enough lead time, a reliability engineer can take action to minimize, or even avoid, impact to production. To complete this work effort, SparkCognition developed and refined an ML-based model using sensor data for a Steam Turbine unit at a host site. The models were deployed in an online, web-based solution that allows users to visualize model outputs and supporting data. The final solution, based on SparkCognition’s proprietary software platform called SparkPredict®, was shared with EPRI who completed an online evaluation of results to determine the solution’s ability to detect actionable events.

20 FOSSIL-FUELED POWER PLANTS↗

Wintertime Overnight NOx Removal in a Southeastern United States Coal-Fired Power Plant Plume: A Model for Understanding Winter NOx Processing and Its Implications

Nitric oxide (NO) is emitted in large quantities from coal-burning power plants. During the day, the plumes from these sources are efficiently mixed into the boundary layer, while at night, they may remain concentrated due to limited vertical mixing during which they undergo horizontal fanning. At night, the degree to which NO is converted to HNO3 and therefore unable to participate in next-day ozone (O3) formation depends on the mixing rate of the plume, the composition of power plant emissions, and the composition of the background atmosphere. In this study, we use observed plume intercepts from the Wintertime INvestigation of Transport, Emissions and Reactivity (WINTER) campaign to test sensitivity of overnight NOx removal to the N2O5 loss rate constant, plume mixing rate, background O3, and background levels of volatile organic compounds using a 2-D box model of power plant plume transport and chemistry. The factor that exerted the greatest control over NOx removal was the loss rate constant of N2O5. At the lowest observed N2O5 loss rate constant, no other combination of conditions converts more than 10 percent of the initial NOx to HNO3. The other factors did not influence NOx removal to the same degree.

air quality↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO2) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

Environmental, Health and Safety Assessment Application of a Heat Integrated, Post-combustion CO 2 Capture System Using Monoethanolamine and Hitachi H3-1 Solvent at the E.W. Brown Coal-Fired Power Plant

An Environmental Health and Safety (EH&S) Assessment was completed for operation of a pilot scale carbon dioxide (CO 2 ) capture system (CCS) at the Louisville Gas & Electric (LG&E) and Kentucky Utilities (KU) Energy, LLC (LG&E-KU) E. W. Brown Generating Station in Harrodsburg, Mercer County, Kentucky. The pilot system was evaluated using two CO 2 capture solvents, monoethanolamine (MEA) and Hitachi’s H3-1 solvent. The purpose of the EH&S Assessment was to determine if there were any unacceptable environmental, health or safety concerns that may prevent operation or environmental permitting of a larger scale pilot scale plant. The assessment included review of process flow diagrams, input and output flow rates for primary materials, literature describing similar processes and chemicals used or created during the process, actual air emission and wastewater test data and air emission calculations. The evaluation included identification of risks related to hazardous chemicals, air emissions, wastewater discharges, solid wastes generated and employee hazards. Most potential EH&S issues that were identified are commonly found and successfully managed at large industrial facilities. No risks were identified that could not be successfully managed or would likely prevent implementation or environmental permitting of the pilot or larger scale plant. Potential exposures and resulting health risks from exposure to low concentrations of nitrosamines generated from degradation of the Hitachi H3-1 and possibly MEA solvents may be a health concern for site workers, but additional investigation is needed to accurately assess this risk. Applying the information gained from operating the pilot plant, performing air emission testing and used solvent testing to a large-scale facility at a commercial coal-fired electric generating plant suggests additional air emission control measures may be necessary to reduce potential site worker health risks and possibly community risks. Depending upon the location and regional air quality, considerable effort may be required to obtain the necessary air permit for construction and operation of a similarly configured large-scale PCCCS facility.

gas separation↗

CO 2 to Bioplastics: Beneficial Re-use of Carbon Emissions from Coal-fired Power Plants using Microalgae

This project sought to address the technical and economic barriers to carbon dioxide (CO 2 ) capture and utilization using microalgae. Specifically, a dual photobioreactor (PBR)/open raceway pond (ORP) cultivation system was evaluated with respect to capital and operational costs, productivity, and culture health, and compared to an ORP-only cultivation system. In the dual (or “hybrid”) system, a cyclic flow PBR was used to provide inoculum for two open raceway ponds after each harvest, with the hypothesis that this PBR + pond system should result in improved performance compared to traditional raceway ponds. Two other raceway ponds were operated conventionally as a control, the experiments being performed at Duke Energy’s East Bend Station in northern KY using coal-derived flue gas as the CO 2 source. Although algae productivity achieved was mediocre due to the fact that the experiments had to be performed late in the growing season when climatic conditions were not optimal for high growth, the hybrid cultivation system showed a higher level of algae productivity (statistically significant) compared to the traditional ponds. In order to realize the maximum value of the algal biomass produced, fractionation of the biomass was examined. Bioplastic compounding and material characterization was subsequently performed using three feed stocks: whole biomass, lipid-extracted biomass and the proteinaceous residue from full fractionation. In general, the whole and lipid-extracted biomass gave similar results in terms of the properties of the resulting bioplastics, while the proteinaceous residue showed promise for the production of a polybutylene adipate terephthalate (PBAT) blend. Finally, sustainability assessment of a putative biorefinery system was conducted, including techno-economic and life cycle impact assessment. Nine different production scenarios were considered, comprising combinations of the three different biomass growth architectures (ORP, PBR and dual PBR-ORP systems) coupled with three different algae biomass processing pathways (drying only, lipid extraction and fractionation). Results show that the minimum selling price of the bioplastic feed stock (BPFS) is within the realm of economic competition with prices as low as $970 USD tonne -1 . Additionally, life cycle impact assessment results indicate drastic improvements in performance of the produced BPFS, with reductions in greenhouse gas emissions ranging between 67 and 116% compared to a petroleum based plastic feedstock.

01 COAL, LIGNITE, AND PEAT↗

Investigation of Technologies to Improve Condenser Heat Transfer and Performance in a Relevant Coal-Fired Power Plant

Improvements in thermal power-generating plant performance is correlated directly to societal benefits including lower cost of reduced fuel consumption, resulting in lower cost of electricity for the consumer and reduced carbon emissions to the atmosphere. Warm steam exhausted from low-pressure steam turbines is condensed to liquid water on the exterior of thin-walled metal condenser tubes with cooling water passing through the tube interior. The condensation of steam creates a vacuum that supports turbine rotation and the concurrent generation of electricity. This vacuum is optimized when heat transfer across the wall of condenser tube is maximized. Common hindrances to heat transfer include foulants in cooling water that may form and adhere to the interior of condenser tubes, including mineral scale, microbiological films, and particulate deposition. Flowing cooling water may also include a laminar layer at the interior metal surfaces that travels more slowly than bulk water flow, serving to impede heat transfer. On the tube exterior, condensing steam forms an insulating layer of water that flows down the tube and reduces the effectiveness of cooling. Both the interior and exterior barriers to optimal heat transfer may be alleviated to some extent by surface treatments. On the tube interior, hydrophobic coatings may be applied that can reduced the adherence of foulants and of the laminar flow layer to the tube surface. On the tube exterior, hydrophobic coatings or mechanical treatments can be applied that may result in the termination of droplet growth and the departure of droplets from the surface rather than coalescence into a continuous layer of flowing water. Fourteen surface treatments were applied to condenser tubes in this study, including eight interior coatings and six exterior treatments, five of which were coatings and one a microstructural texture. Heat transfer measurement equipment simulating conditions in the condenser of an operating power plant was used to determine heat transfer coefficients by measuring sufficient flow, temperature, water chemistry and other data. Several of the tubes with interior surface treatments showed improvement in heat transfer coefficients compared with a plain (uncoated) tube, and several of the tubes with exterior surface treatments also showed enhanced heat transfer coefficients.

01 COAL, LIGNITE, AND PEAT↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Beneficial use of CO 2 from Coal-Fired Power Plants for Production of Animal Feeds

This Final Technical Report for Award DE-FE0031717 is a non-confidential overview of the algae-based CO 2 utilization research project carried out by MicroBio Engineering Inc. (MBE) and project partners - the Orlando Utilities Commission-Stanton Energy Center (OUC-SEC), California Polytechnic University (Cal Poly, San Luis Obispo), University of Central Florida (UCF), and Global Thermostat LLC. The project ran from January 1 2019 to March 2022.

20 FOSSIL-FUELED POWER PLANTS↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Recent Changes to U.S. Coal Plant Operations and Current Compensation Practices

Over the last decade, the U.S. electric power sector has gone through one of the most dramatic changes in its existence. The combination of low natural gas prices as a result of the shale gas revolution and significant reduction in construction and operating costs for renewable resources, in part due to federal tax credits such as the production tax credit and investment tax credit mainly benefitting wind and solar, respectively, has resulted in a significant shift away from coal-fired generation, and instead towards natural gas and renewable generation. Furthermore, the operating profile of existing coal-fired electric generating units has changed significantly. As new natural gas combined cycle plants have become increasingly more efficient and cheaper to operate than older existing coal-fired power plants, coal units continue to lose baseload generation share and more frequently operate as load-following, or cycling, resources. These trends are of particular importance to state public utility commissions. Functioning as economic regulators, commissions oversee investments in a reliable, efficient system while balancing emissions goals, customer demands, and other policy objectives. Changes to coal plant operations as a result of increased competition from other fuel sources may have a bearing on system reliability and economics, and therefore constitute an important area for commissions to monitor.

01 COAL, LIGNITE, AND PEAT↗