Search NASA⌕ Search

SEARCH · Search NASA

Results for “communication options”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Directivity of a Sparse Array in the Presence of Atmospheric-Induced Phase Fluctuations for Deep Space Communications

Widely distributed (sparse) ground-based arrays have been utilized for decades in the radio science community for imaging celestial objects, but have only recently become an option for deep space communications applications with the advent of the proposed Next Generation Deep Space Network (DSN) array. But whereas in astronomical imaging, observations (receive-mode only) are made on the order of minutes to hours and atmospheric-induced aberrations can be mostly corrected for in post-processing, communications applications require transmit capabilities and real-time corrections over time scales as short as fractions of a second. This presents an unavoidable problem with the use of sparse arrays for deep space communications at Ka-band which has yet to be successfully resolved, particularly for uplink arraying. In this paper, an analysis of the performance of a sparse antenna array, in terms of its directivity, is performed to derive a closed form solution to the expected array loss in the presence of atmospheric-induced phase fluctuations. The theoretical derivation for array directivity degradation is validated with interferometric measurements for a two-element array taken at Goldstone, California. With the validity of the model established, an arbitrary 27-element array geometry is defined at Goldstone, California, to ascertain its performance in the presence of phase fluctuations. It is concluded that a combination of compact array geometry and atmospheric compensation is necessary to ensure high levels of availability.

Nessel, James A.↗

Lunar Cube Transfer Trajectory Options

Contingent upon the modification of an initial condition of the injected or deployed orbit. Additionally, these designs can be restricted by the selection of the Cubesat subsystem design such as propulsion or communication. Nonetheless, many trajectory options can be designed with have a wide range of transfer durations, fuel requirements, and final destinations. Our investigation of potential trajectories highlights several design options including deployment into low Earth orbit (LEO), geostationary transfer orbits (GTO), and higher energy direct lunar transfer orbits. In addition to direct transfer options from these initial orbits, we also investigate the use of longer duration Earth-Moon dynamical systems. For missions with an intended lunar orbit, much of the design process is spent optimizing a ballistic capture while other science locations such as Sun-Earth libration or heliocentric orbits may simply require a reduced Delta-V imparted at a convenient location along the trajectory. In this article we examine several design options that meet the above limited deployment and subsystem drivers. We study ways that both impulsive and low-thrust Solar Electric Propulsion (SEP) engines can be used to place the Cubesat first into a highly eccentric Earth orbit, enter the Moon's Sphere of Influence, and finally achieve a highly eccentric lunar orbit. We show that such low-thrust transfers are feasible with a realistic micro-thruster model, assuming that the Cubesat can generate sufficient power for the SEP. Two examples are shown here: (1) A Cubestat injected by Exploration Mission 1 (EM-1) then employing low thrust; and (2) a CubSat deployed in a GTO, then employing impulsive maneuvers. For the EM-1 injected initial design, we increase the EM-1 targeted lunar flyby distance to reduce the energy of the lunar flyby to match that of a typical lMoon system heteroclinic manifold. Figure 1 presents an option that encompasses the similar dynamics as that of the ARTEMIS mission design. Low-thrust maneuvers are used along the manifold trajectory to raise perigee to that of a lunar orbit, adjust the timing with respect to the Moon, rotate the line of apsides, and target a ballistic lunar encounter. In this design a second flyby decreases the orbital energy with respect to the Moon, so that C3 -0.1 km2s2. Another design, shown in Figure 2 emanates from a GTO then uses impulsive maneuvers to phase onto a local Earth-Moon manifold, which then transfers the CubeSat to a lunar encounter.

Dynamical System↗

An integrated Ka/Ku-band payload for personal, mobile and private business communications

The Canadian Department of Communications has been studying options for a government-sponsored demonstration payload to be launched before the end of the century. A summary of the proposed system concepts and network architectures for providing an advanced private business network service at Ku-band and personal and mobile communications at Ka-band is presented. The system aspects addressed include coverage patterns, traffic capacity, and grade of service, multiple access options as well as special problems, such as Doppler in mobile applications. Earth terminal types and the advanced payload concept proposed in a feasibility study for the demonstration mission are described. This concept is a combined Ka-band/Ku-band payload which incorporates a number of advanced satellite technologies including a group demodulator to convert single-channel-per-carrier frequency division multiple access uplink signals to a time division multiplex downlink, on-board signal regeneration, and baseband switching to support packet switched data operation. The on-board processing capability of the payload provides a hubless VSAT architecture which permits single-hop full mesh interconnectivity. The Ka-band and Ku-band portions of the payload are fully integrated through an on-board switch, thereby providing the capability for fully integrated services, such as using the Ku-band VSAT terminals as gateway stations for the Ka-band personal and mobile communications services.

Hayes, Edward J.↗

Mobile satellite communications - Vehicle antenna technology update

This paper discusses options for vehicle antennas to be used in mobile satellite communications systems. Two types of antennas are identified. A non-steerable, azimuthally omnidirectional antenna with a modest gain of 3 to 5 dBi is suggested when a low cost is desired. Alternatively, mechanically or electronically steerable antennas with a higher gain of 10 to 12 dBi are suggested to alleviate power and spectrum scarcity associated with mobile satellite communications. For steerable antennas, both open-loop and closed-loop pointing schemes are discussed. Monopulse and sequential lobing are proposed for the mechanically steered and electronically steered antennas, respectively. This paper suggests a hybrid open-loop/closed-loop pointing technique as the best performer in the mobile satellite environment.

Bell, D.↗

Options for daytime monitoring of atmospheric visibility in optical communications

Techniques for daytime detection of atmospheric transmission and cloud cover to determine the capabilities of future deep-space optical communications links are considered. A modification of the planned nighttime photometry program will provide the best data while minimizing the need for further equipment. Greater degrees of modification will provide increased detection capabilities. Future testing of the equipment will better define the improvement offered by each level of modification. Daytime photometry is favored at certain wavelengths because of higher transmission and lower background noise, thus giving an increased signal-to-noise ratio. A literature search has provided a list of stars brighter than second magnitude at these wavelengths.

Erickson, D.↗

Lagrange-Based Options for Relay Satellites to Eliminate Earth-Mars Communications Outages During Solar Superior Conjunctions

Recent conjunction class Mars human mission plans have generally assumed that there will inevitably be periods of communications outages between Earth and Mars. This has significant cost and risk implications for not only Mars missions, but also precursor missions in the lunar environment. But are there ways to avoid these outages? The potential exists for communications to be interrupted by Solar Superior Conjunctions (SSCs). Depending on the communications system, used, there can be communications outages up to as many as 78 days. The higher bandwidth systems experience the greatest outage. If these communications channels are interrupted due to an SSC, there are of course resulting challenges to mission operations. An outage of a few days to a few weeks could allow minor disturbances to become major concerns or even trigger subsystems failures. An inability to consult with the ground at the wrong time could result in loss of mission, loss of an element, or loss of life. Each planet in the solar system has a set of five Lagrange points associated with it and the Sun. At any given point in time, a planet or either its L4 or L5 point is visible to any other planet in the solar system, regardless of the position of the sun relative to the two. Thus, L4 and L5 have high value as relay systems to prevent communications outages. There are four sets of solar Lagrange points that may be of potential use in this study: Mars-Sun L4 and L5 points, Earth-Sun L4 and L5, Venus-Sun L4 and L5, and Mercury-Sun L4 and L5. A candidate relay satellite system will be identified, with consideration of both new technology developments and existing telecommunications satellites. This system may have implications for not only the Mars human mission architectures, but also Gateway and human lunar surface architectures as these other studies are tasked with paving the way to human Mars missions. If Mars communications outages can be eliminated, then the degree of autonomy necessary in Mars and precursor systems may be reduced.

Relay Satellite↗

Lunar Cube Transfer Trajectory Options

Numerous Earth-Moon trajectory and lunar orbit options are available for Cubesat missions. Given the limited Cubesat injection infrastructure, transfer trajectories are contingent upon the modification of an initial condition of the injected or deployed orbit. Additionally, these transfers can be restricted by the selection or designs of Cubesat subsystems such as propulsion or communication. Nonetheless, many trajectory options can be considered which have a wide range of transfer durations, fuel requirements, and final destinations. Our investigation of potential trajectories highlights several options including deployment from low Earth orbit (LEO), geostationary transfer orbits (GTO), and higher energy direct lunar transfers and the use of longer duration Earth-Moon dynamical systems. For missions with an intended lunar orbit, much of the design process is spent optimizing a ballistic capture while other science locations such as Sun-Earth libration or heliocentric orbits may simply require a reduced Delta-V imparted at a convenient location along the trajectory.

Libration Orbits↗

Lunar Cube Transfer Trajectory Options

Numerous Earth-Moon trajectory and lunar orbit options are available for Cubesat missions. Given the limited Cubesat injection infrastructure, transfer trajectories are contingent upon the modification of an initial condition of the injected or deployed orbit. Additionally, these transfers can be restricted by the selection or designs of Cubesat subsystems such as propulsion or communication. Nonetheless, many trajectory options can b e considered which have a wide range of transfer duration, fuel requirements, and final destinations. Our investigation of potential trajectories highlights several options including deployment from low Earth orbit (LEO) geostationary transfer orbits (GTO) and higher energy direct lunar transfer and the use of longer duration Earth-Moon dynamical systems. For missions with an intended lunar orbit, much of the design process is spent optimizing a ballistic capture while other science locations such as Sun-Earth libration or heliocentric orbits may simply require a reduced Delta-V imparted at a convenient location along the trajectory.

Libration Orbits↗

Observations of Crew Dynamics During Mars Analog Simulations

Crewmembers on Mars missions will face new and unique challenges compared to those in close communications proximity to Mission Control centers. Crews on Mars will likely become more autonomous and responsible for their day-to-day planning. These explorers will need to make frequent real time decisions without the assistance of large ground support teams. Ground-centric control will no longer be an option due to the communications delays. As a result of the new decision making model, crew dynamics and leadership styles of future astronauts may become significantly different from the demands of today. As a volunteer for the Mars Society on two Mars analog missions, this presenter will discuss observations made during isolated, surface exploration simulations. The need for careful crew selections, not just based on individual skill sets, but on overall team interactions becomes apparent very quickly when the crew is planning their own days and deciding their own priorities. Even more important is the selection of a Mission Commander who can lead a team of highly skilled individuals with strong and varied opinions in a way that promotes crew consensus, maintains fairness, and prevents unnecessary crew fatigue.

Cusack, Stacy L.↗

TOPEX satellite option study

The basic design of the fleet satellite communication spacecraft (FLTSATCOM) can easily accommodate any of the three payload options for the ocean dynamic topography experiment (TOPEX). The principal mission requirements as well as the payload accommodations and communications systems needed for launching this payload are reviewed. The existing FLTSATCOM satellite design is identified and the approaches for the proposed propulsion system are described in addition to subsystems for mechanical; power; attitude and velocity control; and telemetry, tracking and control are described. The compatability of FLTSATCOM with the launch vehicle is examined and its capabilities vs TOPEX requirements are summarized. Undetermined changes needed to meet data storage, thermal control, and area to mass ratio requirements are discussed. Cost estimates are included for budgetary and planning purposes. The availability of the described design is assessed based on the continuing production of FLTSATCOM spacecraft during the schedule span planned for TOPEX.

Source record↗

Requirements for an Integrated UAS CNS Architecture

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is investigating revolutionary and advanced universal, reliable, always available, cyber secure and affordable Communication, Navigation, Surveillance (CNS) options for all altitudes of UAS operations. In Spring 2015, NASA issued a Call for Proposals under NASA Research Announcements (NRA) NNH15ZEA001N, Amendment 7 Subtopic 2.4. Boeing was selected to conduct a study with the objective to determine the most promising candidate technologies for Unmanned Air Systems (UAS) air-to-air and air-to-ground data exchange and analyze their suitability in a post-NextGen NAS environment. The overall objectives are to develop UAS CNS requirements and then develop architectures that satisfy the requirements for UAS in both controlled and uncontrolled air space. This contract is funded under NASAs Aeronautics Research Mission Directorates (ARMD) Aviation Operations and Safety Program (AOSP) Safe Autonomous Systems Operations (SASO) project and proposes technologies for the Unmanned Air Systems Traffic Management (UTM) service. Communications, Navigation and Surveillance (CNS) requirements must be developed in order to establish a CNS architecture supporting Unmanned Air Systems integration in the National Air Space (UAS in the NAS). These requirements must address cybersecurity, future communications, satellite-based navigation APNT, and scalable surveillance and situational awareness. CNS integration, consolidation and miniaturization requirements are also important to support the explosive growth in small UAS deployment. Air Traffic Management (ATM) must also be accommodated to support critical Command and Control (C2) for Air Traffic Controllers (ATC). This document therefore presents UAS CNS requirements that will guide the architecture.

Templin, Fred↗

Considerations for an Integrated UAS CNS Architecture

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is investigating revolutionary and advanced universal, reliable, always available, cyber secure and affordable Communication, Navigation, Surveillance (CNS) options for all altitudes of UAS operations. In Spring 2015, NASA issued a Call for Proposals under NASA Research Announcements (NRA) NNH15ZEA001N, Amendment 7 Subtopic 2.4. Boeing was selected to conduct a study with the objective to determine the most promising candidate technologies for Unmanned Air Systems (UAS) air-to-air and air-to-ground data exchange and analyze their suitability in a post-NextGen NAS environment. The overall objectives are to develop UAS CNS requirements and then develop architectures that satisfy the requirements for UAS in both controlled and uncontrolled air space. This contract is funded under NASAs Aeronautics Research Mission Directorates (ARMD) Aviation Operations and Safety Program (AOSP) Safe Autonomous Systems Operations (SASO) project and proposes technologies for the Unmanned Air Systems Traffic Management (UTM) service.There is a need for accommodating large-scale populations of Unmanned Air Systems (UAS) in the national air space. Scale obviously impacts capacity planning for Communication, Navitation, and Surveillance (CNS) technologies. For example, can wireless communications data links provide the necessary capacity for accommodating millions of small UASs (sUAS) nationwide? Does the communications network provide sufficient Internet Protocol (IP) address space to allow air traffic control to securely address both UAS teams as a whole as well as individual UAS within each team? Can navigation and surveillance approaches assure safe route planning and safe separation of vehicles even in crowded skies?Our objective is to identify revolutionary and advanced CNS alternatives supporting UASs operating at all altitudes and in all airspace while accurately navigating in the absence of navigational aids. These CNS alternatives must be reliable, redundant, always available, cyber-secure, and affordable for all types of vehicles including small UAS to large transport category aircraft. The approach will identify CNS technology candidates that can meet the needs of the range of UAS missions to specific air traffic management applications where they will be most beneficial and cost effective.

Templin, Fred L.↗

Considerations for an Integrated UAS CNS Architecture

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is investigating revolutionary and advanced universal, reliable, always available, cyber secure and affordable Communication, Navigation, Surveillance (CNS) options for all altitudes of UAS operations. In Spring 2015, NASA issued a Call for Proposals under NASA Research Announcements (NRA) NNH15ZEA001N, Amendment 7 Subtopic 2.4. Boeing was selected to conduct a study with the objective to determine the most promising candidate technologies for Unmanned Air Systems (UAS) air-to-air and air-to-ground data exchange and analyze their suitability in a post-NextGen NAS environment. The overall objectives are to develop UAS CNS requirements and then develop architectures that satisfy the requirements for UAS in both controlled and uncontrolled air space. This contract is funded under NASAs Aeronautics Research Mission Directorates (ARMD) Aviation Operations and Safety Program (AOSP) Safe Autonomous Systems Operations (SASO) project and proposes technologies for the Unmanned Air Systems Traffic Management (UTM) service.There is a need for accommodating large-scale populations of Unmanned Air Systems (UAS) in the national air space. Scale obviously impacts capacity planning for Communication, Navigation, and Surveillance (CNS) technologies. For example, can wireless communications data links provide the necessary capacity for accommodating millions of small UASs (sUAS) nationwide? Does the communications network provide sufficient Internet Protocol (IP) address space to allow air traffic control to securely address both UAS teams as a whole as well as individual UAS within each team? Can navigation and surveillance approaches assure safe route planning and safe separation of vehicles even in crowded skies?Our objective is to identify revolutionary and advanced CNS alternatives supporting UASs operating at all altitudes and in all airspace while accurately navigating in the absence of navigational aids. These CNS alternatives must be reliable, redundant, always available, cyber-secure, and affordable for all types of vehicles including small UAS to large transport category aircraft. The approach will identify CNS technology candidates that can meet the needs of the range of UAS missions to specific air traffic management applications where they will be most beneficial and cost effective.

Templin, Fred L.↗

Alerga: Alert Aggregation and Reasoning in GOOSE Simulation Pipeline

IEC 61850 specifies the Generic Object Oriented Substation Event (GOOSE) protocol as one option for low latency communication of substation-related events. Due to its strict timing requirements, GOOSE lacks any form of encryption or authentication and has only minimal integrity guarantees. These absences render the protocol vulnerable to a variety of communication anomalies, including adversarial action. In particular, an adversary with access to the substation network can launch man in the middle (MITM) attacks. We propose Alerga, a set of tools to allow operators to mitigate some of the risks of the protocol while retaining its strengths. To that end, we have developed first a GOOSE simulation pipeline including data generation, anomaly detection, alert handling, causal reasoning and data visualization components. The simulator is designed to be modular, allowing operators to swap components to better fit their network capabilities. The volume of alert traffic on a substation network threatens operators with alert fatigue. In order to combat this, we secondly present a novel form of alert aggregation and processing, offering operators a condensed view of any threats to the system. Thirdly, to facilitate the handling of these threats, our causal reasoning system traces the alerts back to their most likely cause, generating an initial hypothesis for operators to investigate.

alert aggregation↗

Development of a microprocessor controller for stand-alone photovoltaic power systems

A controller for stand-alone photovoltaic systems has been developed using a low power CMOS microprocessor. It performs battery state of charge estimation, array control, load management, instrumentation, automatic testing, and communications functions. Array control options are sequential subarray switching and maximum power control. A calculator keypad and LCD display provides manual control, fault diagnosis and digital multimeter functions. An RS-232 port provides data logging or remote control capability. A prototype 5 kW unit has been built and tested successfully. The controller is expected to be useful in village photovoltaic power systems, large solar water pumping installations, and other battery management applications.

Millner, A. R.↗

Technology, Data Bases and System Analysis for Space-to-Ground Optical Communications

Optical communications is becoming an ever-increasingly important option for designers of space-to- ground communications links, whether it be for government or commercial applications. In this paper the technology being developed by NASA for use in space-to-ground optical communications is presented. Next, a program which is collecting a long term data base of atmospheric visibility statistics for optical propagation through the atmosphere will be described. Finally, a methodology for utilizing the statistics of the atmospheric data base in the analysis of space-to-ground links will be presented. This methodology takes into account the effects of station availability, is useful when comparing optical communications with microwave systems, and provides a rationale establishing the recommended link margin.

Space-to-Ground Optical Communications↗

Advanced Shipboard Communications Demonstrations with ACTS

For ships at sea. satellites provide the only option for high data rate (HDR), long haul communications. Furthermore the demand for HDR satellite communications (SATCOM) for military and commercial ships. and other offshore platforms is increasing. Presently the bulk of this maritime HDR SATCOM connectivity is provided via C-band and X-band. However, the shipboard antenna sizes required to achieve a data rate of, say T 1 (1.544 Mbps) with present C-/X-band SATCOM systems range from seven to ten feet in diameter. This limits the classes of ships to which HDR services can be provided to those which are large enough to accommodate the massive antennas. With its high powered K/Ka-band spot beams, the National Aeronautics and Space Administration's (NASA) Advanced Communications Technology Satellite (ACTS) was able to provide T I and higher rate services to ships at sea using much smaller shipboard antennas. This paper discusses three shipboard HDR SATCOM demonstrations that were conducted with ACTS between 1996 and 1998. The first demonstration involved a 2 Mbps link provided to the seismic survey ship MN Geco Diamond equipped with a 16-inch wide, 4.5-inch tall, mechanically steered slotted waveguide array antenna developed by the Jet Propulsion Laboratory. In this February 1996 demonstration ACTS allowed supercomputers ashore to process Geco Diamond's voluminous oceanographic seismic data in near real time. This capability allowed the ship to adjust its search parameters on a daily basis based on feedback from the processed data, thereby greatly increasing survey efficiency. The second demonstration was conducted on the US Navy cruiser USS Princeton (CG 59) with the same antenna used on Geco Diamond. Princeton conducted a six-month (January-July 1997) Western Hemisphere solo deployment during which time T1 connectivity via ACTS provided the ship with a range of valuable tools for operational, administrative and quality-of-life tasks. In one instance, video teleconferencing (VTC) via ACTS allowed the ship to provide life-saving emergency medical aid, assisted by specialists ashore. to a fellow mariner - the Master of a Greek cargo ship. The third demonstration set what is believed to be the all-time SATCOM data rate record to a ship at sea, 45 Mbps in October 1998. This Lake Michigan (Chicago area) demonstration employed one of ACTS' fixed beams and involved the smallest of the three vessels, the 45-foot Bayliner M/V Entropy equipped with a modified commercial-off-the-shelf one-meter antenna. A variety of multi-media services were provided to Entropy through a stressing range of sea states. These three demonstrations provided a preview of the capabilities that could be provided to future mariners on a more routine basis when K/Ka-band SATCOM systems are widely deployed.

Axford, Roy A.↗

Bioresearch Module Design Definition and Space Shuttle Vehicle Integration Study. Volume 1: Basic Report

Preliminary designs of the Bioexplorer spacecraft, developed in an earlier study program, are analyzed and updated to conform to a new specification which includes use of both the Scout and the space shuttle vehicle for launch. The updated spacecraft is referred to as bioresearch module. It is capable of supporting a variety of small biological experiments in near-earth and highly elliptical earth orbits. The baseline spacecraft design is compatible with the Scout launch vehicle. Inboard profile drawings, weight statements, interface drawings, and spacecraft parts and aerospace ground equipment lists are provided to document the design. The baseline design was analyzed to determine the design and cost impact of a set of optional features. These include reduced experiment power and thermal load, addition of an experiment television monitor, and replacement of VHF with S-band communications. The impact of these options on power required, weight change and cost is defined.

Lang, A. L., Jr.↗