Search NASA⌕ Search

SEARCH · Search NASA

Results for “complex project costs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

Depenbrock, Brett T.↗

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

Tailoring Enterprise Systems Engineering Policy for Project Scale and Complexity

Space systems are characterized by varying degrees of scale and complexity. Accordingly, cost-effective implementation of systems engineering also varies depending on scale and complexity. Recognizing that systems engineering and integration happen everywhere and at all levels of a given system and that the life cycle is an integrated process necessary to mature a design, the National Aeronautic and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) has developed a suite of customized implementation approaches based on project scale and complexity. While it may be argued that a top-level system engineering process is common to and indeed desirable across an enterprise for all space systems, implementation of that top-level process and the associated products developed as a result differ from system to system. The implementation approaches used for developing a scientific instrument necessarily differ from those used for a space station. .

Cox, Renee I.↗

Total cost of ownership of vehicle electrification and fuel switching options for light-duty and heavy-duty vehicles

Projecting the transition from combustion engines to battery-based powertrains is complex becuase it involves numerous interdependent decisions. This study estimates total cost of ownership (TCO) to assess the economic viability of powertrain electrification, focusing exclusively on advances in vehicle and fuel technologies. Under two bounding technology-progress scenarios, we develop vehicle designs and fuel cost trajectories, which serve as inputs to TCO projections for selected classes from 2021 to 2050. We analyzed a small sport utility vehicle (SUV) to represent the light-duty vehicle (LDV) sector, and four medium- and heavy-duty vehicle (MHDV) classes: Class 6 box delivery, Class 8 drayage, Class 8 long-haul, and Class 8 transit bus. For each class, we compared the TCO of battery electric vehicles (BEVs) and fuel cell hybrid electric vehicles (FCHEVs) against conventional internal combustion engine vehicles (ICEVs). The results show that modern ICEVs generally have lower TCO; however, BEVs and FCHEVs could match or have lower TCOs than ICEVs over time, depending on technological progress. In LDVs, BEV300 is projected to deliver the lowest TCO by 2050, particularly under the high-progress scenario. In MHDVs, both BEVs and FCHEVs could become more cost-competitive than ICEVs by 2050 in the high-progress case. Beyond these results, the findings suggest further investigation is warranted for BEV charging infrastructure, FCHEV hydrogen refueling infrastructure, and MHDV charging strategies. In conclusion, these factors could reduce the fuel-cost share of TCO and enhance the competitiveness of BEVs and FCHEVs relative to ICEVs.

Battery electric vehicle↗

Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters (CRADA 625) (Final Report)

This report is a final deliverable for project 81966: Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters (CRADA 625) Commercial heat pump water heater (CHPWH) systems can significantly improve the energy efficiency of service water heating (SWH), aka domestic hot water (DHW), in commercial and multifamily buildings but have not yet achieved widespread adoption due to pricing, complexity, and perceived risk factors. The goal of this project – Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial HPWHs (Scaling Up) – was to demonstrate and validate a holistic systems approach for CHPWHs that de-risks the technology, creating a reliable, cost-effective, and repeatable approach to CHPWH deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OPEN-Augmented Reality GUI for Bioenergy Crop Phenotyping and Precision Agriculture (Donald Danforth Plant Science Center Final Scientific Technical Report)

The project led by the Donald Danforth Plant Science Center, in collaboration with Arizona State University, George Washington University, and Saint Louis University, has made significant strides in advancing the phenotypic analysis of bioenergy crops through the development of an innovative AI processing pipeline. This initiative was primarily funded by ARPA-E, with additional cost-sharing provided by the participating institutions. The project successfully utilized a variety of sensors—3D scanners, thermal, RGB, and hyperspectral—to refine algorithms for data-driven trait signature identification and improve the classification and visualization of plant traits. The developed AI processing pipeline is capable of handling the complex, multidimensional data characteristic of dynamic agricultural environments. 1) Contributions to understanding: The research has advanced the field of plant phenomics by showcasing the synergistic use of various sensor data to enhance the precision of trait analysis in bioenergy crops. Through the integration of 3D scanners, thermal, RGB, and hyperspectral sensors, the project has developed robust data-driven trait signature algorithms and visualization techniques. These innovations have facilitated detailed monitoring and management of plant traits, providing vital insights into plant growth dynamics and stress responses. Further, the project has broadened our understanding of how machine learning can be effectively applied in multi-sensor environments to refine trait analysis. By leveraging diverse datasets, the research has not only improved the accuracy of phenotypic assessments but also established a versatile methodological framework that can be extended beyond agriculture to other fields requiring detailed phenotypic analysis. 2) Technical effectiveness and economic feasibility: The AI processing pipeline developed in this project demonstrated significant technical effectiveness, achieving high throughput analysis of extensive phenotypic data and meeting targeted accuracies. This system exemplified the capability of advanced machine learning technologies to efficiently manage and analyze large, complex datasets. Economically, the implementation of the project-developed pipelines may offer substantial cost savings across multiple sectors. It enhances data analysis processes and significantly reduces the need for manual data interpretation, thereby decreasing both the time and resources required. 3) Public benefit: The project has significantly broadened the scope of agricultural methodologies to enhance phenotypic analysis, with potential applications in various sectors beyond agriculture. Additionally, the initiative fostered an enriching educational and collaborative environment, significantly enhancing the technical skills of participants. It also made substantial contributions to the scientific community by providing open-access data sets and tools, encouraging ongoing research and development across various disciplines. Overall, the project not only met its scientific goals but also showcased the extensive utility of integrating advanced machine learning and sensor data analysis technologies. These advancements have proven instrumental in driving forward both theoretical research and practical applications, setting a strong foundation for future explorations and innovations in data-driven science.

60 APPLIED LIFE SCIENCES↗

Civil Service Workforce Market Supply and the Effect on the Cost Estimating Relationships (CERs) that may effect the Productivity Factors for Future NASA Missions

The upcoming retirement of the Baby Boomers on the horizon will leave a performance gap between younger generation (the future NASA decision makers) and the gray beards. This paper will reflect on the average age of workforce across NASA Centers, the Aerospace Industry and other Government Agencies, like DoD. This papers will dig into Productivity and Realization Factors and how they get applied to bimonthly (payroll data) for true FTE calculations that could be used at each of the NASA Centers and other business systems that are on the forefront in being implemented. This paper offers some comparative costs solutions, from simple - full time equivalent (FTE) cost estimating relationships CERs, to complex - CERs for monthly time-phasing activities for small research projects that start and get completed within a government fiscal year. This paper will present the results of a parametric study investigating the cost-effectiveness of different alternatives performance based cost estimating relationships (CERs) and how they get applied into the Center s forward pricing rate proposals (FPRP). True CERs based on the relationship of a younger aged workforce will have some effects on labor rates used in both commercial cost models and internal home-grown cost models which may impact the productivity factors for future NASA missions.

Sterk, Steve↗

Quantifying Value and Representing Competitiveness of Electricity System Technologies in Economic Models

Evaluating competition between electricity technologies is challenging because it depends on both their costs and their values. While technology costs can typically be estimated from projections of the cost components - capital, fuel, and O&M - estimating a technology's value is more complex due to its dependence on its contributions to multiple different grid services, each with prices that can vary substantially over space and time. In this work, using an electricity model of the contiguous United States, we develop relationships between relative value and share of total generation for major electricity generation technologies which, when paired with projections of technology costs, can be used to estimate technology competitiveness. We identify significant differences in the relationship between relative value and generation share for variable renewable energy (VRE) and non-VRE sources, but we demonstrate that all technologies require consideration of their dynamic values (in addition to cost) when evaluating competitiveness. In addition, we demonstrate that relative value of a technology is substantially impacted by not only its own generation share but also other aspects of the system state, in particular the mix of other technologies present in the system. Finally, we use the developed relative value relationships in combination with projections of future technology costs in a coarse resolution model that competes technologies based on a comprehensive competitiveness metric: profitability-adjusted LCOE (PLCOE). We show that this simple representation of technology competition approximately recovers the generation mix from a detailed model, which is not possible using LCOE alone. Such an approach can be used to improve the representation of technology competition in coarse-resolution models such as integrated assessment models, for which simplified metrics are often needed.

electricity model↗

Lowering tomography costs in quantum simulation with a symmetry projected operator basis

Measurement in quantum simulations provides a means for extracting meaningful information from a complex quantum state, and for quantum computing, reducing the complexity of measurement will be vital for near-term applications. For most quantum simulations, the targeted state will obey several symmetries inherent to the system Hamiltonian. Here, we obtain an alternative symmetry projected basis of measurement that reduces the number of measurements needed by a constant factor. Our scheme can be implemented at no additional cost on a quantum computer, can be implemented under various measurement or tomography schemes, and is reasonably resilient under noise.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

In an effort to minimize the need for costly, complex, tracking radars, the German Space Operations Center has set up a research project for GPS based tracking of sounding rockets. As part of this project, a GPS receiver based on commercial technology for terrestrial applications has been modified to allow its use under the highly dynamical conditions of a sounding rocket flight. In addition, new antenna concepts are studied as an alternative to proven but costly wrap-around antennas.

Markgraf, M.↗

Transforming Public Housing with Deep Energy Retrofits

Open Market ESCO’s (OME) Transforming Public Housing through Deep Energy Retrofits project demonstrated new design and financing solutions for implementing deep energy retrofits (DERs) in occupied low-income multifamily housing. The Project performed an integrated project delivery process, including designing low-carbon retrofit solution packages, construction pricing, and financing. The Project developed a constructible and financeable DER scope for a 102-unit extremely low-income multifamily property in Boston. This Project demonstrated a replicable approach for streamlining and implementing DER projects in occupied housing, including real solutions for overcoming design complexities and cost barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Security Constrained Economic Optimization of Photovoltaic and Other Distributed Assets

The rapid growth of distributed energy resources (DERs), especially photovoltaic (PV) systems, has introduced new complexities in maintaining grid reliability, stability, and cost-effective operation. This project addresses these challenges by developing and demonstrating a scalable GridOS Distributed Energy Resource Management System (DERMS) that enables secure, real-time optimization and control of DERs at the distribution feeder level.

14 SOLAR ENERGY↗

Pros, Cons, and Alternatives to Weight Based Cost Estimating

Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the imp~ct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

Joyner, Claude R.↗

EASY-SHIFT v Alpha

The software is a generic, price- and load-responsive control algorithm integrating heat pumps with thermal energy storage. The algorithm leverages simple models of the system and easily accessible data to schedule operation of heat pumps and thermal energy storage in ways that minimize the cost of operating the heating/cooling system. This tool is specifically designed to be easy to interact with, and something that industry partners are able to adopt. There are two current state of the art approaches. Industry tends to develop very simple algorithms, with predetermined schedules that are not capable of changing operation in response to changes in operating environment. For example, a control designed to avoid high-price electricity from 5-8 PM will not be able to adapt if the high-price period changes to 4-9 PM. Academia commonly develops algorithms called Model predictive control (MPC). MPC requires extensive data and highly trained staff to develop a specific type of simulation model of the building, connect the building to optimization algorithms, and leverage powerful computers. Industry, with limited time/finance budgets for any project, is resistant to adopting MPC due to the associated high complexity and cost.

Grant, Peter [Lawrence Berkeley National Laborator↗

Cost-Benefit Analysis of Electricity Resilience Projects: State of the Art and Gap Analysis

Utilities and regulators must weigh the benefits of electricity resilience projects against their costs, which would be passed on to customers. Cost-benefit analysis (CBA) is an appropriate method for assessing this tradeoff. Here, in this paper we review the literature on CBA of electricity resilience projects and analyze gaps in the available methods and tools. The costs of resilience projects are typically straightforward to estimate but their benefits — particularly the avoided costs of power interruptions — are complex to quantify and monetize. A common perception among practitioners is that current CBA tools are not sufficiently mature to be adopted into real-world practice. We propose an electricity resilience CBA framework consisting of several elements: risks, physical impacts, power interruptions, economic impacts, and resilience projects. While methods for some elements are well-developed, there is a need for novel approaches to value avoided power interruptions, integrate multiple risks and benefit streams, and incorporate uncertainty.

Cost-benefit analysis↗

What Drives Spacecraft Cost: A Look Into How Material Characteristics Relate to the Material Complexity Multipliers

Today a variety of engineered materials are used to build the space vehicles and satellites that NASA, DOD and the aerospace community will use in future projects. These materials can be a significant part of the cost when designing and building these systems. Current cost models such as NASCOM, SEER-H and PRICE allow the cost analysis to select materials requirements during the development of the cost model. It should be noted however that some of these models do not always give the most detailed information with respect to material specifications for the given cost model. Instead the materials are defined within broad classification, giving questionable data with regard to specific material cost. It is the objective of this paper to present a summary of basic information on materials to assist the cost analyst in the development of their models. Specifically, this paper will compare materials and their complexity multipliers to some specific material properties.

Rosmait, Russell L.↗

Life Cycle Analysis and Life Cycle Costing for Municipal Solid Waste (MSW) Management and Materials Redeployment to Support ARPA-E’s Potential Program on Waste to Energy and Materials

Municipal solid waste infrastructure in the United States contains complex supply chains to transport, sort, and sequester waste. This project developed models to estimate the environmental and economic costs of waste infrastructure in the U.S. using data from several municipalities. Life cycle costing (LCC) models were developed for waste management relevant supply chain steps, including waste collection, sorting, landfilling, waste-to-energy, ash processing, and recycling. A waste-to-materials and energy (WTM&E) life cycle analysis (LCA) and LCC dashboard was developed in collaboration with Argonne National Laboratory (ANL) and an LCC tool was developed for additional analysis.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Challenging conventional assumptions in PV: a high-throughput open-air approach to low-cost perovskite module production

Perovskite solar modules (PSMs) offer a promising pathway to low-cost photovoltaics, yet their commercialization is challenged by manufacturing scalability, device uniformity, additive costs, interlayer complexity, and module stability. This study introduces a comprehensive technoeconomic analysis of single junction PSM's and projections for tandem perovskite-Si modules that integrate all materials and manufacturing steps, module performances, projected lifetimes, and manufacturing costs across scales. Here, we highlight an open-air manufacturing approach to fabricate all active layers of serially interconnected PSMs, including electrodes and charge transport layers, enabling high-throughput production without inert or vacuum environments. The analysis reveals two orders of magnitude throughput enhancement and cost reductions of 24% in all-open-air production, escalating to over 60% at 1 GW factory capacity compared to conventional methods. Levelized cost of energy (LCOE) projections for utility-scale installations over 30 years, accounting for module replacement and recycling, demonstrate the potential to achieve the 2030 US target of $0.03 per kWh with realistic 7–11-year PSM lifetimes, outperforming incumbent silicon-based modules. Neither four terminal (4T) nor two terminal (2T) tandem-Si PSMs improve over single junction perovskite or silicon LCOE regardless of higher efficiencies at any modeled lifetime. Addressing PSM technical challenges with a cost-modeling framework guides commercialization efforts and provides a convincing pathway for challenging incumbent Si-based PV.

14 SOLAR ENERGY↗