Search NASA⌕ Search

SEARCH · Search NASA

Results for “constructed wetland”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

43 records · Page 3

Mutually beneficial outcomes for hydropower expansion and environmental protection at a basin scale

Reshaping the scale of planning for hydropower development, from reaches to basin-scales, has been recommended as a more effective way to ameliorate the environmental impacts of hydropower. One approach is identifying mutually exclusive areas where development is precluded for conservation purposes and areas of low conservation value that present fewer barriers to development. This strategy, however, is less adoptable in developed countries where hydropower is already widespread and large-scale construction of new dams is unlikely. To broaden the adoption of basin-scale planning, alternative approaches and planning tools are needed for identifying mutually beneficial opportunities for simultaneous increases in hydropower capacity while improving environmental conditions. In this study, we present the Basin Scale Opportunity Assessment as a methodology to improve environmental conditions through either direct (on-site) or indirect (off-site) mitigation. We assess whether direct or indirect mitigation activities lead to optimal results in terms of added hydropower, environmental improvement, and monetary cost at a basin scale. We present two case studies for the Connecticut River and Roanoke River Basins, USA. Significant opportunities for expanding hydropower generating capacity are numerous in both basins. Results suggest that total hydropower capacity could be increased 4 to 7 % in the Roanoke and Connecticut Basins, respectively, without new dam construction and with net improvements in environmental conditions. We found that environmentally and economically optimal win-win strategies for increasing hydropower capacity and improving environmental conditions included improving environmental conditions in rivers downstream of existing dams. Off-site mitigation opportunities, such as dam removal and wetland mitigation, were identified as optimum solutions for achieving net environmental improvements only when they were associated with new hydropower construction. Our results demonstrate that opportunities to increase hydropower capacity and improve environmental conditions are expanded by viewing cumulative benefits at basin scales; however, increasing regulatory flexibility may be required to realize these opportunities.

54 ENVIRONMENTAL SCIENCES↗

Ecological connectivity and in-kind mitigation in a regulatory decision framework: A case study with an amphibian habitat specialist

Ecological connectivity is critical to the survival and long-term viability of populations but is often overlooked in regulatory frameworks. We integrated landscape-level processes into a mitigation strategy for impacts to aquatic resources on the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR) in eastern Tennessee. Wetlands on the ORR, which contain significant breeding populations of the imperiled four-toed salamander (Hemidactylium scutatum) and tubercled rein orchid (Platanthera flava var. herbiola), will be impacted by construction of an environmental waste disposal facility under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Here, we used a modified Kepner-Tregoe decision analysis to select general mitigation options that balanced regulatory requirements and interest group perspectives. We emphasized habitat connectivity through models that prioritized an area's importance to natural area connectivity (centrality) and maintenance of population structure for an affected habitat specialist (four-toed salamanders). We also emphasized in-kind mitigation through the preservation and enhancement of ecologically similar resources and the translocation and establishment of a new subpopulation of four-toed salamanders elsewhere on the ORR. We ultimately released over 500 juvenile salamanders that originated from the impacted site into the chosen mitigation wetlands. By doing so under the constraints of a time-sensitive CERCLA remediation effort and exceeding its substantive requirements, this work underscores feasibility. Ecological connectivity and the conservation of species that are not afforded explicit regulatory processes can be effectively and efficiently integrated into environmental decision-making and land use planning.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Floodplain Assessment for the Technical Area 8 to Technical Area 22 Natural Gas Line Replacement Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing new construction that crosses through upper Pajarito Canyon and upper Starmer Canyon from Technical Area (TA) 8 to TA-22 at Los Alamos National Laboratory (LANL). The project proposes to install a new 12 inch natural gas line to replace the existing 70+ year old natural gas line. Replacement will prevent loss of service to several LANL TAs and Bandelier National Monument. The project activities within the 100- year floodplains include 1) new natural gas line installation to replace and existing aging gas line, 2) relocating a section of fence and 3) three construction equipment and materials storage areas. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR Part 1022) (CFR 2003) which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

A Conterminous USA-Scale Map of Relative Tidal Marsh Elevation

Abstract Tidal wetlands provide myriad ecosystem services across local to global scales. With their uncertain vulnerability or resilience to rising sea levels, there is a need for mapping flooding drivers and vulnerability proxies for these ecosystems at a national scale. However, tidal wetlands in the conterminous USA are diverse with differing elevation gradients, and tidal amplitudes, making broad geographic comparisons difficult. To address this, a national-scale map of relative tidal elevation ( Z * MHW ), a physical metric that normalizes elevation to tidal amplitude at mean high water (MHW), was constructed for the first time at 30 × 30-m resolution spanning the conterminous USA. Contrary to two study hypotheses, watershed-level median Z * MHW and its variability generally increased from north to south as a function of tidal amplitude and relative sea-level rise. These trends were also observed in a reanalysis of ground elevation data from the Pacific Coast by Janousek et al. (Estuaries and Coasts 42 (1): 85–98, 2019). Supporting a third hypothesis, propagated uncertainty in Z * MHW increased from north to south as light detection and ranging (LiDAR) errors had an outsized effect under narrowing tidal amplitudes. The drivers of Z * MHW and its variability are difficult to determine because several potential causal variables are correlated with latitude, but future studies could investigate highest astronomical tide and diurnal high tide inequality as drivers of median Z * MHW and Z * MHW variability, respectively. Watersheds of the Gulf Coast often had propagated Z * MHW uncertainty greater than the tidal amplitude itself emphasizing the diminished practicality of applying Z * MHW as a flooding proxy to microtidal wetlands. Future studies could focus on validating and improving these physical map products and using them for synoptic modeling of tidal wetland carbon dynamics and sea-level rise vulnerability analyses.

Holmquist, James R. (ORCID:0000000325466766)↗

Los Alamos National Laboratory Floodplain Assessment for Fire Risk Mitigations at the Lower Slobbovia Testing Site in (TA-36)

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take fire pre-suppression actions at Los Alamos National Laboratory (LANL) Technical Area (TA) 36. Constructing a fire break and a fuel break surrounding the Lower Slobbovia explosives testing site in addition to the current vegetation mowing practices would establish a safety perimeter to help prevent fires from spreading away from the firing point. NNSA has prepared this floodplain assessment in accordance with 10 Code of Federal Regulations (CFR) Part 1022 Compliance with Floodplain and Wetland Environmental Review Requirements (10 CFR 1022), which was promulgated to implement DOE requirements under Executive Order 11988 Floodplain Management (EO 1977). A floodplain is defined in 10 CFR 1022 as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands,” and a base floodplain as “the 100-year floodplain, that is, a floodplain with a 1.0 percent chance of flooding in any given year (CFR 2003).” This floodplain assessment evaluates potential impacts to floodplain values and functions from implementation of the proposed action, identifies alternatives to the Proposed Action, and allows for meaningful public comment.

54 ENVIRONMENTAL SCIENCES↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗