Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Springtime SEA Air Is Consistently Both Smoky and Humid, but This Relationship (and Its Radiative Effects) Varies Spatially and Seasonally

The atmosphere over the southeast Atlantic Ocean (SEA) sees a consistent springtime biomass burning (BB) smoke from widespread agricultural fires on the African continent. This smoke layer is initially lofted high in a continental mixed layer (~5-6km) and is then transported westward in the free troposphere, where it overlies and ultimately mixes into the SEA stratocumulus-topped oceanic boundary layer. Coincident with this smoke is an elevated humidity signal which is present from the time a given airmass is over the continental source region. ORACLES (ObseRvations of Aerosols above CLouds and their intEractionS) was a NASA Earth Venture Suborbital mission with the goal of measuring aerosol, cloud, and atmospheric properties over this region during three deployments in September 2016, August 2017, and October 2018. A previous study discussed the spatial characteristics of the water vapor-BB plume observations in the September 2016 flight data and their degree of agreement with several atmospheric reanalyses and models. In the present work, we first discuss atmospheric chemistry, structure, and aerosol results from all three ORACLES deployments to place these results in a broader seasonal context. Despite the differing locations and season of each deployment, we show that there continues to be good agreement between the airborne ORACLES dataset and large-scale reanalyses, specifically the ECMWF ERA5 and CAMS reanalyses. Other reanalyses (specifically NASA's MERRA-2) preserved the observed correlation between meteorology and biomass burning conditions, but, as was seen for 2016, was frequently displaced spatially relative to the observations. The CAMS reanalysis performs better with water vapor than with CO. Results comparing CAMS column AOD to the field measurements show slight overestimates, consistent with previous analysis, but the good relationship observed between AOD and inlet-based aerosol extinction demonstrates this metric's utility to broader studies. The good ERA5/CAMS/ORACLES agreement allows us to next examine the multi-year seasonal patterns and trends beyond the three ORACLES deployment periods. Looking at seven years of reanalysis data for the BB season, we find distinct variations between each month/deployment in terms of vertical smoke distribution and correlation to atmospheric specific humidity, due to changing conditions through the BB season. Using k-means clustering of these climatological reanalysis, we identify six canonical atmospheric profile types of varying total atmospheric humidity and vertical structure and describe their changing incidence spatially and throughout the season, and six analogous profile types for carbon monoxide, allowing us to characterize the atmospheric structure of both vapor and BB over time throughout the SEA region. This classification will allow for a more complete analysis of the broader radiative and dynamical effects of humid aerosols overlying stratocumulus clouds.

Kristina Marie Myers Pistone↗

A technology development program for large space antennas

Recent studies sponsored by NASA and United States industry indicate a need for technology to handle large space-based antenna systems. These systems will require apertures of up to 100 m and more in order to be capable of radio frequency operation up to Ku-band for communications, earth observations, and radio astronomy applications. They must also be cost-effective and compatible with the Space Transportation System. Selection criteria for the antennas which include such considerations as surface precision in the intended service environment and mechanical packaging efficiency, are enumerated. Space testing of the antennas will be carried out as part of NASA's Large Space Systems Technology (LSST) Program, which will be continued through fiscal year 1984. Deployable antennas have been selected for development by the LSST Program. The maturity of this class of antennas is such that a significant number of near-term space based applications will be satisfied (mobile communications, submillimeter radio astronomy, orbiting deep space relay station ODSRS, orbiting VLBI, earth-looking radiometry). Two antenna concepts selected for development are the offset wrap-rib configuration and the maypole (hoop/column) configuration with details for these concepts presented.

Russell, R. A.↗

Handling Qualities of a Capsule Spacecraft During Atmospheric Entry

A piloted simulation was conducted to study handling qualities for capsule spacecraft entering the Earth s atmosphere. Eight evaluation pilots, including six pilot astronauts, provided Cooper-Harper ratings, workload ratings, and qualitative comments. The simulation began after descending through the atmospheric entry interface point and continued until the drogue parachutes deployed. There were two categories of piloting tasks, both of which required bank angle control. In one task category, the pilot followed a closed-loop bank angle command computed by the backup guidance system to manage g-loads during entry. In the other task category, the pilot used intuitive rules to determine the desired bank angle independently, based on an open-loop schedule of vertical speed, Mach, and total energy specified at several range-to-target gates along the entry trajectory. Pilots were able to accurately track the bank angle guidance commands and steered the capsule toward the recovery site with essentially the same range error as the benchmark autopilot trajectory albeit with substantially higher propellant usage, and the handling qualities for this task were satisfactory. Another key result was that the complex piloting task of atmospheric entry could be performed satisfactorily, even in the presence of large dispersions, by controlling bank angle to follow a simple open-loop schedule.

Bilimoria, Karl D.↗

Modeling Constellation Virtual Missions Using the Vdot(Trademark) Process Management Tool

The authors have identified a software tool suite that will support NASA's Virtual Mission (VM) effort. This is accomplished by transforming a spreadsheet database of mission events, task inputs and outputs, timelines, and organizations into process visualization tools and a Vdot process management model that includes embedded analysis software as well as requirements and information related to data manipulation and transfer. This paper describes the progress to date, and the application of the Virtual Mission to not only Constellation but to other architectures, and the pertinence to other aerospace applications. Vdot s intuitive visual interface brings VMs to life by turning static, paper-based processes into active, electronic processes that can be deployed, executed, managed, verified, and continuously improved. A VM can be executed using a computer-based, human-in-the-loop, real-time format, under the direction and control of the NASA VM Manager. Engineers in the various disciplines will not have to be Vdot-proficient but rather can fill out on-line, Excel-type databases with the mission information discussed above. The author s tool suite converts this database into several process visualization tools for review and into Microsoft Project, which can be imported directly into Vdot. Many tools can be embedded directly into Vdot, and when the necessary data/information is received from a preceding task, the analysis can be initiated automatically. Other NASA analysis tools are too complex for this process but Vdot automatically notifies the tool user that the data has been received and analysis can begin. The VM can be simulated from end-to-end using the author s tool suite. The planned approach for the Vdot-based process simulation is to generate the process model from a database; other advantages of this semi-automated approach are the participants can be geographically remote and after refining the process models via the human-in-the-loop simulation, the system can evolve into a process management server for the actual process.

Hardy, Roger↗

Get the Power You Need, When and Where You Need It Aboard the International Space Station (ISS) Using the ISS Plug-In Plan (IPiP) Requirement Request Process

Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.

Moore, Kevin D.↗

Orbital Space Solar Power Option for a Lunar Village

One of the most significant challenges to the implementation of a continuously manned lunar base is power. During the lunar day (14 Earth days), it is conceptually simple to deploy solar arrays to generate the estimated 35 kilowatts of continuous power required. However, generating this level of power during the lunar night (also 14 Earth days) has been an extremely difficult problem to solve. Conventional solutions range from the requirement that the base be located at the lunar south pole so as to take advantage of the continuous sunshine available there to developing a space-qualified nuclear reactor and power plant to generate the needed energy. There is a third option: Use the soon-to-be-available Space Launch System to place a space based solar power station in lunar orbit that would beam the needed energy to the lunar base. Several detailed studies have been performed by NASA, universities and others looking at the lunar south pole for locating the base. The results are encouraging: by taking advantage of the moon's orbital tilt, large solar arrays can be deployed there to track the sun continuously and generate the power needed to sustain the base. The problem with this approach is inherent to its design: it will only work at the lunar south pole. There is no other site on the Moon with geometry favorable to generating continuous solar power. NASA has also considered the development of a compact fission reactor and power plant to generate the needed power, allowing the base to be sited anywhere on the Moon. The problem with this approach is that there are no space fission reactors available, none are being planned and the cost of developing one is prohibitively expensive. Using an orbiting space based solar power station to generate electrical power and beam it to a base sited anywhere on the moon should therefore be considered. The technology to collect sunlight, generate greater than the estimated 35 kilowatts of power, and beam it to the surface using microwaves is available today. The problem with this concept in the past would have been the mass and packaging volume (for launch) required to put such a system in place in lunar orbit. This problem is potentially solved with the advent of the Space Launch System (SLS). The SLS, with its 70 mT launch capacity, it more than capable of placing such a system into lunar orbit in a single launch. This paper will examine the potential use of an SLS-launched, space solar power system in lunar orbit as the primary power source for a first-generation, continuously-occupied lunar base and compare it with the other power generation and storage options previously considered.

Johnson, Les↗

A Deployable 40 kWe Lunar Fission Surface Power Concept

Continuous power at the kilowatt level will be imperative for future lunar users including crew infrastructure, future science, and in-situ resource utilization (ISRU). The Compass Team explored both 10 kWe and 40 kWe concepts, assuming planned lander and rover capabilities. Both concepts found that a crew pressurized rover chassis, repurposed for deploying reactor power components, could place a fission surface power system (FSPS) at least one km from users. While the 10 kWe fission power system (FPS) could be deployed as a single unit, the 40 kWe system was too large and had to be deployed in multiple trips with the same rover. Key technologies and design approaches included a high-assay low-enriched uranium (HALEU), yttrium hydride (YH) moderated heat pipe reactor, Stirling convertors, deployable radiators based on International Space Station (ISS) designs, and power conversion/transmission at ±2800 VDC for a one km remote distance.

Fission Power↗

Large Deployable Reflectarray Antenna

A report discusses a 7-meter-diameter reflectarray antenna that has been conceived in a continuing effort to develop large reflectarray antennas to be deployed in outer space. Major underlying concepts were reported in three prior NASA Tech Briefs articles: "Inflatable Reflectarray Antennas" (NPO-20433), Vol. 23, No. 10 (October 1999), page 50; "Tape-Spring Reinforcements for Inflatable Structural Tubes" (NPO-20615), Vol. 24, No. 7 (July 2000), page 58; and "Self-Inflatable/Self-Rigidizable Reflectarray Antenna" (NPO-30662), Vol. 28, No. 1 (January 2004), page 61. Like previous antennas in the series, the antenna now proposed would include a reflectarray membrane stretched flat on a frame of multiple inflatable booms. The membrane and booms would be rolled up and folded for compact stowage during transport. Deployment in outer space would be effected by inflating the booms to unroll and then to unfold the membrane, thereby stretching the membrane out flat to its full size. The membrane would achieve the flatness for a Ka-band application. The report gives considerable emphasis to designing the booms to rigidify themselves upon deployment: for this purpose, the booms could be made as spring-tape-reinforced aluminum laminate tubes like those described in two of the cited prior articles.

Fang, Houfei↗

Launch Pad 39 Hail Monitor Array System

Weather conditions at Kennedy Space Center are extremely dynamic, and they greatly affect the safety of the Space Shuttles sitting on the launch pads. For example, on May 13, 1999, the foam on the External Tank (ET) of STS-96 was significantly damaged by hail at the launch pad, requiring rollback to the Vehicle Assembly Building. The loss of ET foam on STS-114 in 2005 intensified interest in monitoring and measuring damage to ET foam, especially from hail. But hail can be difficult to detect and monitor because it is often localized and obscured by heavy rain. Furthermore, the hot Florida climate usually melts the hail even before the rainfall subsides. In response, the hail monitor array (HMA) system, a joint effort of the Applied Physics Laboratory operated by NASA and ASRC Aerospace at KSC, was deployed for operational testing in the fall of 2006. Volunteers from the Community Collaborative Rain, Hail, and Snow (CoCoRaHS) network, in conjunction with Colorado State University, continue to test duplicate hail monitor systems deployed in the high plains of Colorado.

Source record↗

Performance results of cooperating expert systems in a distributed real-time monitoring system

There are numerous definitions for real-time systems, the most stringent of which involve guaranteeing correct system response within a domain-dependent or situationally defined period of time. For applications such as diagnosis, in which the time required to produce a solution can be non-deterministic, this requirement poses a unique set of challenges in dynamic modification of solution strategy that conforms with maximum possible latencies. However, another definition of real time is relevant in the case of monitoring systems where failure to supply a response in the proper (and often infinitesimal) amount of time allowed does not make the solution less useful (or, in the extreme example of a monitoring system responsible for detecting and deflecting enemy missiles, completely irrelevant). This more casual definition involves responding to data at the same rate at which it is produced, and is more appropriate for monitoring applications with softer real-time constraints, such as interplanetary exploration, which results in massive quantities of data transmitted at the speed of light for a number of hours before it even reaches the monitoring system. The latter definition of real time has been applied to the MARVEL system for automated monitoring and diagnosis of spacecraft telemetry. An early version of this system has been in continuous operational use since it was first deployed in 1989 for the Voyager encounter with Neptune. This system remained under incremental development until 1991 and has been under routine maintenance in operations since then, while continuing to serve as an artificial intelligence (AI) testbed in the laboratory. The system architecture has been designed to facilitate concurrent and cooperative processing by multiple diagnostic expert systems in a hierarchical organization. The diagnostic modules adhere to concepts of data-driven reasoning, constrained but complete nonoverlapping domains, metaknowledge of global consequences of anomalous data, hierarchical reporting of problems that extend beyond a single domain, and shared responsibility for problems that overlap domains. The system enables efficient diagnosis of complex system failures in real-time environments with high data volumes and moderate failure rates, as indicated by extensive performance measurements.

Schwuttke, U. M.↗

Global L-band Observatory for Water Cycle Studies (GLOWS)

L-band observations have proven useful for estimating soil moisture and ocean salinity variables to study the land surface and ocean. The European Space Agency (ESA) Soil Moisture and Ocean Salinity (SMOS) mission was the first (2009-present) spaceborne L-band radiometer. This was followed by two L-band missions flown by the National Aeronautics and Space Administration (NASA) to measure sea surface salinity (Aquarius 2011-2015) and soil moisture (SMAP 2015-present). It is critical to continue the time series of L-band observations that these missions have begun. To address this need we propose a new low-cost instrument concept known as the Global L-band active/passive Observatory for Water cycle Studies (GLOWS) that will include an L-band radiometer and radar to provide data continuity. The new mission concept includes a deployable reflectarray lens antenna with a compact feed that can be flown on an Earth Venture class satellite in a EELV Secondary Payload Adapter (ESPA) Grande-class mission. GLOWS will continue the science observations of SMAP and SMOS at the same resolution and accuracy at substantially lower cost, size, and weight.

David Long↗

Conducting Research on the International Space Station Using the EXPRESS Rack Facilities

EXPRESS Racks provide capability for payload access to ISS resources. The successful on-orbit operations and versatility of the EXPRESS Rack has facilitated the operations of many scientific areas, with the promise of continued payload support for years to come. EXPRESS Racks are currently deployed in the US Lab, Columbus and JEM. Process improvements and enhancements continue to improve the accommodations and make the integration and operations process more efficient. Payload Integration Managers serve as the primary interface between the ISS Program and EXPRESS Payload Developers. EXPRESS Project coordinates across multiple functional areas and organizations to ensure integrated EXPRESS Rack and subrack products and hardware are complete, accurate, on time, safe, and certified for flight. NASA is planning to expand the EXPRESS payload capacity by developing new Basic Express Racks expected to be on ISS in 2018.

Thompson, Sean W.↗

Operational Impact of the Baseline Integrated Arrival, Departure, and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known as Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. The ATD-2 field demonstration is organized into three phases. Phase I illustrates a Baseline IADS demonstration and includes all components of ATD-2 running in operational environments. Subsequent phases will fuse together strategic scheduling components as well as take into account metroplex considerations. This paper describes the baseline IADS system that was deployed at the end of 2017 and is continuing to run as part of the ATD-2 demonstration taking place at Charlotte-Douglas International Airport (CLT). The primary areas of deployment and system use are in the CLT Air Traffic Control Tower, CLT TRACON, CLT American Airlines ramp tower, Washington Center facility and American Airlines Integration Operations Center (IOC). In addition to describing the functions and capabilities that are part of the baseline IADS system, this paper also provides metrics regarding operational use as well as initial benefits metrics. Benefit metrics continue to be collected and aggregated across the areas of system delay, throughput, taxi time, fuel burn savings, and emissions savings. Furthermore, benefits as a result of common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are described. The overall benefit of improved predictability and efficiency as a result of the baseline IADS system demonstration is also discussed.

operational system↗

Exploration of planetesimals by a tripartite tethered spacecraft

Asteroids and comets exert such a small gravitational force that it is not practical to survey them from orbit. One must instead continuously accelerate using maneuvering rockets to move around the surface. A space exploration craft in three parts connected by lightweight cables can survey asteroids and comets, and deploy landers, without requiring the large thrusters and the continuous depletion of fuel required by a single craft. The spacecraft is deployed by spinning up from a compact configuration using low thrust jets, and then maintain surveying orbit without any major expenditure of energy. The triangular tether arrangement is stable, but care must be taken in changing orbits and with deploying and recovering samples, as can be demonstrated with a simple simulation. Even 100 km long tethers occupy a low payload fraction.

Stephens, Richard B.↗

A Web Centric Architecture for Deploying Multi-Disciplinary Engineering Design Processes

There are continuous needs for engineering organizations to improve their design process. Current state of the art techniques use computational simulations to predict design performance, and optimize it through advanced design methods. These tools have been used mostly by individual engineers. This paper presents an architecture for achieving results at an organization level beyond individual level. The next set of gains in process improvement will come from improving the effective use of computers and software within a whole organization, not just for an individual. The architecture takes advantage of state of the art capabilities to produce a Web based system to carry engineering design into the future. To illustrate deployment of the architecture, a case study for implementing advanced multidisciplinary design optimization processes such as Bi-Level Integrated System Synthesis is discussed. Another example for rolling-out a design process for Design for Six Sigma is also described. Each example explains how an organization can effectively infuse engineering practice with new design methods and retain the knowledge over time.

Woyak, Scott↗

Controls-structures-electromagnetics interaction program

A technology development program is described involving Controls Structures Electromagnetics Interaction (CSEI) for large space structures. The CSEI program was developed as part of the continuing effort following the successful kinematic deployment and RF tests of the 15 meter Hoop/Column antenna. One lesson learned was the importance of making reflector surface adjustment after fabrication and deployment. Given are program objectives, ground based test configuration, Intelsat adaptive feed, reflector shape prediction model, control experiment concepts, master schedule, and Control Of Flexible Structures-II (COFS-II) baseline configuration.

Grantham, William L.↗

On state estimation for an orbiting single tether system

The effects of instrumentation accuracy and configuration on estimation error are studied for the small expendable-tether deployment system (SEDS) using a continuous-discrete extended Kalman filter (CDEKF) state estimator. A twelfth order model that incorporates the rigid body modes of the tether as well as the satellite attitude dynamics is developed. Simulation results using the model and the estimator indicate that the originally planned instrumentation package could not estimate the state vector adequately. Recommendations are made and results presented that reduce the estimation error by adding instruments and increasing selected measurement accuracies.

Greene, Michael E.↗

Free Radicals and Reactive Intermediates for the SAGE III Ozone Loss and Validation Experiment (SOLVE) Mission

This grant provided partial support for participation in the SAGE III Ozone Loss and Validation Experiment. The NASA-sponsored SOLVE mission was conducted Jointly with the European Commission-sponsored Third European Stratospheric Experiment on Ozone (THESEO 2000). Researchers examined processes that control ozone amounts at mid to high latitudes during the arctic winter and acquired correlative data needed to validate the Stratospheric Aerosol and Gas Experiment (SAGE) III satellite measurements that are used to quantitatively assess high-latitude ozone loss. The campaign began in September 1999 with intercomparison flights out of NASA Dryden Flight Research Center in Edwards. CA. and continued through March 2000. with midwinter deployments out of Kiruna. Sweden. SOLVE was co-sponsored by the Upper Atmosphere Research Program (UARP). Atmospheric Effects of Aviation Project (AEAP). Atmospheric Chemistry Modeling and Analysis Program (ACMAP). and Earth Observing System (EOS) of NASA's Earth Science Enterprise (ESE) as part of the validation program for the SAGE III instrument.

Anderson, James G.↗