Search NASA⌕ Search

SEARCH · Search NASA

Results for “control inspection systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Analysis of Eddy Current Capabilities for the Detection of Outer Diameter Stress Corrosion Cracking in Small Bore Metallic Structures

The use of eddy current techniques for the detection of outer diameter damage in tubing and many complex aerospace structures often requires the use of an inner diameter probe due to a lack of access to the outside of the part. In small bore structures the probe size and orientation are constrained by the inner diameter of the part, complicating the optimization of the inspection technique. Detection of flaws through a significant remaining wall thickness becomes limited not only by the standard depth of penetration, but also geometrical aspects of the probe. Recently, an orthogonal eddy current probe was developed for detection of such flaws in Space Shuttle Primary Reaction Control System (PRCS) Thrusters. In this case, the detection of deeply buried stress corrosion cracking by an inner diameter eddy current probe was sought. Probe optimization was performed based upon the limiting spatial dimensions, flaw orientation, and required detection sensitivity. Analysis of the probe/flaw interaction was performed through the use of finite and boundary element modeling techniques. Experimental data for the flaw detection capabilities, including a probability of detection study, will be presented along with the simulation data. The results of this work have led to the successful deployment of an inspection system for the detection of stress corrosion cracking in Space Shuttle Primary Reaction Control System (PRCS) Thrusters.

Wincheski, Buzz↗

Remote surface inspection system

This paper reports on an on-going research and development effort in remote surface inspection of space platforms such as the Space Station Freedom (SSF). It describes the space environment and identifies the types of damage for which to search. This paper provides an overview of the Remote Surface Inspection System that was developed to conduct proof-of-concept demonstrations and to perform experiments in a laboratory environment. Specifically, the paper describes three technology areas: (1) manipulator control for sensor placement; (2) automated non-contact inspection to detect and classify flaws; and (3) an operator interface to command the system interactively and receive raw or processed sensor data. Initial findings for the automated and human visual inspection tests are reported.

Hayati, S.↗

Remote surface inspection system

This paper reports on an on-going research and development effort in remote surface inspection of space platforms such as the Space Station Freedom (SSF). It describes the space environment and identifies the types of damage for which to search. This paper provides an overview of the Remote Surface Inspection System that was developed to conduct proof-of-concept demonstrations and to perform experiments in a laboratory environment. Specifically, the paper describes three technology areas: (1) manipulator control for sensor placement; (2) automated non-contact inspection to detect and classify flaws; and (3) an operator interface to command the system interactively and receive raw or processed sensor data. Initial findings for the automated and human visual inspection tests are reported.

Hayati, Samad↗

Follow-the-Leader Control for the PIPS Prototype Hardware

This report describes the payload inspection and processing system (PIPS), an automated system programmed off-line for inspection of space shuttle payloads after integration and prior to launch. PIPS features a hyper-redundant 18-degree of freedom (DOF) serpentine truss manipulator capable of snake like motions to avoid obstacles. During the summer of 1995, the author worked on the same project, developing a follow-the-leader (FTL) algorithm in graphical simulation which ensures whole arm collision avoidance by forcing ensuing links to follow the same tip trajectory. The summer 1996 work was to control the prototype PIPS hardware in follow-the-leader mode. The project was successful in providing FTL control in hardware. The STS-82 payload mockup was used in the laboratory to demonstrate serpentine motions to avoid obstacles in a realistic environment.

Williams, Robert L. II↗

Automatic Inspection of Aircraft Using Open-Architecture Robotic Platforms

Aging aircraft structures and composite materials are requiring rapid inspection of large areas. Removal from the aircraft for NDE at an inspection facility is not economical as compared to field inspection. Detection and characterization of defects are labor intensive, time consuming and when the process is manual the results are subjected to human error. These limitations of NDE created a need for portable, user friendly inspection systems that can rapidly scan large areas of complex structures and locate all the detrimental material conditions. Addressing this need has been an evolutionary process that followed the technology trend, and unique devices were developed to allow rapid field inspection. This development involves multi-disciplinary approaches to integrate NDE, telerobotics, neural networks, advanced materials science, imbedded computing and automated control. These efforts have led to the development of various portable inspection systems and the current trend is towards fully automatic systems that will operate autonomously.

Bar-Cohen, Yoseph↗

The other side of the safety coin

The development, inspection and testing requirements for successful production and launch and safe operation of spaceflight hardware are discussed. Emphasis is placed on paying acute attention to malfunctions, which could be caused by contaminants (particles in docking rings), insufficiently durable materials (Orbiter brakes), etc. Generic and specific problems which occur in propulsion, avionics, mechanical and computer systems and in configuration management, manufacturing and process control efforts are explored. Case histories of deficiencies found in LOX fuel lines, contaminated hydraulic control systems, the Solar Maximum Mission thermal insulation grommets, are summarized. Thorough inspection and testing procedures and design change recording during manufacture of spacecraft components are identified as requisites for successful space missions.

Roth, Gilbert L.↗

Initial Developments Toward an Active Noise Control System for Small Unmanned Aerial Systems

Small unmanned aerial systems have the potential to expand commercial markets from package delivery to infrastructure inspection. Many missions, however, require the vehicles to operate in close proximity to people, where community noise concerns could ultimately limit vehicle acceptability. Therefore, noise control technologies may be needed to achieve an acceptable noise signature and enable widespread use of these vehicles. The purpose of this paper is to assess the feasibility of using loudspeakers attached to the vehicle to actively reduce noise. More specifically, this initial study explores the possibility of using a single loudspeaker to reduce the noise from an isolated rotor. Tests performed in an anechoic chamber with a 7.6 cm diameter speaker and 23.9 cm diameter rotor are used to demonstrate the potential benefits and limitations of the concept. Results confirm that active noise control can work in this application with measured tonal reductions of over 30 dB in specific directions. However, since the radiation characteristics of the speaker are different than the rotor, amplification is observed in other directions. This technology has the potential to create a “cone of silence”, which could be steered during flight operations to minimize the impact on noise sensitive areas.

Schiller, Noah H.↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

The Factory of the Future

A brief history of aircraft production techniques is given. A flexible machining cell is then described. It is a computer controlled system capable of performing 4-axis machining part cleaning, dimensional inspection and materials handling functions in an unmanned environment. The cell was designed to: allow processing of similar and dissimilar parts in random order without disrupting production; allow serial (one-shipset-at-a-time) manufacturing; reduce work-in-process inventory; maximize machine utilization through remote set-up; maximize throughput and minimize labor.

Byman, J. E.↗

External Tank Program - Legacy of Success

The largest single element of Space Shuttle is the External Tank (ET), which serves as the structural backbone of the vehicle during ascent and provides liquid propellants to the Orbiter s three Main Engines. The ET absorbs most of the seven million pounds of thrust exerted by the Solid Rocket Boosters and Main Engines. The design evolved through several block changes, reducing weight each time. Because the tank flies to orbital velocity with the Space Shuttle Orbiter, minimization of weight is mandatory, to maximize payload performance. The initial configuration, the standard weight tank, weighed 76,000 pounds and was an aluminum 2219 structure. The light weight tank weighed 66,000 pounds and flew 86 missions. The super light weight tank weighed 58,500 pounds and was primarily an aluminum-lithium structure. The final configuration and low weight enabled system level performance sufficient for assembly of the International Space Station in a high inclination orbit, vital for international cooperation. Another significant challenge was the minimization of ice formation on the cryogenic tanks. This was essential due to the system configuration and the choice of ceramic thermal protection system materials on the Orbiter. Ice would have been a major debris hazard. Spray on foam insulation materials served multiple functions including thermal insulation, conditioning of cryogenic propellants, and thermal protection for the tank structure during ascent and entry. The tank is large, and unique manufacturing facilities, tooling, and handling, and transportation operations were developed. Weld processes and tooling evolved with the design as it matured through several block changes. Non Destructive Evaluation methods were used to assure integrity of welds and thermal protection system materials. The aluminum-lithium alloy was used near the end of the program and weld processes and weld repair techniques had to be refined. Development and implementation of friction stir welding was a substantial technology development incorporated during the Program. Automated thermal protection system application processes were developed for the majority of the tank surface. Material obsolescence was an issue throughout the multi-decade program. Process controls were implemented to assure cleanliness in the production environment, to control contaminants, and to preclude corrosion. Each tank was accepted via rigorous inspections, including non-destructive evaluation techniques, proof testing, and all systems testing. In the post STS-107 era, the project focused on ascent debris risk reduction. This was accomplished via stringent process controls, post flight assessment using substantially improved imagery, and selective redesigns. These efforts were supported with a number of test programs to simulate combined environments. The debris risk was reduced by two orders of magnitude. During this time a major natural disaster was overcome when hurricane Katrina damaged the manufacturing facility. Numerous lessons from these efforts, the manufacturing and material processing issues, the key design features, and evolution of the design will be discussed.

Pilet, Jeffery C.↗

Automated Inspection of the RSRM Case O-Ring Seal Surface

An automated inspection system has been developed to inspect the o-ring sealing surfaces on the Space Shuttle reusable solid rocket motor (RSRM) case segment joints. A laser digitizing system is used to create a three dimensional map of the o-ring sealing surfaces. This data is analyzed for any irregularities, which are noted for further inspection and disposition. This paper describes both the hardware and the software used to gather data as well as the methods developed to analyze the data. The RSRM is assembled from four casting segments. Each of the field joints between these segments is sealed with three o-rings. These o-rings are critical for the proper operation of the motor. After launch the booster segments are recovered and reused. As part of the refurbishment process the o-ring sealing surfaces are inspected for any irregularities. The system developed uses a combination of commercial and customized hardware and software. The system uses two computer systems in a real time environment to control a laser, an XYZ precision table, and case rotation and position information. The system is capable of inspecting both the tang end and the clevis end of the RSRM field joint. The o-ring grooves and flat sealing surfaces are inspected.

ODell, Keith P.↗

Robotic control and inspection verification

Three areas of possible commercialization involving robots at the Kennedy Space Center (KSC) are discussed: a six degree-of-freedom target tracking system for remote umbilical operations; an intelligent torque sensing end effector for operating hand valves in hazardous locations; and an automatic radiator inspection device, a 13 by 65 foot robotic mechanism involving completely redundant motors, drives, and controls. Aspects concerning the first two innovations can be integrated to enable robots or teleoperators to perform tasks involving orientation and panal actuation operations that can be done with existing technology rather than waiting for telerobots to incorporate artificial intelligence (AI) to perform 'smart' autonomous operations. The third robot involves the application of complete control hardware redundancy to enable performance of work over and near expensive Space Shuttle hardware. The consumer marketplace may wish to explore commercialization of similiar component redundancy techniques for applications when a robot would not normally be used because of reliability concerns.

Davis, Virgil Leon↗

Liquid Bismuth Propellant Management System for the Very High Specific Impulse Thruster with Anode Layer

Two prototype bismuth propellant feed systems were constructed and operated in conjunction with a propellant vaporizer. One system provided bismuth to a vaporizer using gas pressurization but did not include a means to measure the flow rate. The second system incorporated an electromagnetic pump to provide fine control of the hydrostatic pressure and a new type of in-line flow sensor that was developed for accurate, real-time measurement of the mass flow rate. High-temperature material compatibility was a driving design requirement for the pump and flow sensor, leading to the selection of Macor for the main body of both components. Posttest inspections of both components revealed no degradation of the material. The gas pressurization system demonstrated continuous pressure control over a range from zero to 200 torr. In separate proof-of-concept experiments, the electromagnetic pump produced a linear pressure rise as a function of current that compared favorably with theoretical pump pressure predictions, producing a pressure rise of 10 kPa at 30 A. Preliminary flow sensor operation indicated a bismuth flow rate of 6 mg/s with an uncertainty of plus or minus 6%. An electronics suite containing a real-time controller was successfully used to control the entire system, simultaneously monitoring all power supplies and performing data acquisition duties.

Polzin, K. A.↗

Ultrasonic quality inspection of bonded honeycomb assemblies is automated

Inspection system for bonded honeycomb assemblies is accurate, fast, and automated. The ultrasonic system consists of inner and outer transducer positioning assemblies with suitable motor controls, a centerless turntable assembly, water squirter assemblies, and an inspection program completely encoded on tape suitable for use on a high speed computer.

Kammerer, C. C.↗

Time-Domain Terahertz Computed Axial Tomography NDE System

NASA has identified the need for advanced non-destructive evaluation (NDE) methods to characterize aging and durability in aircraft materials to improve the safety of the nation's airline fleet. 3D THz tomography can play a major role in detection and characterization of flaws and degradation in aircraft materials, including Kevlar-based composites and Kevlar and Zylon fabric covers for soft-shell fan containment where aging and durability issues are critical. A prototype computed tomography (CT) time-domain (TD) THz imaging system has been used to generate 3D images of several test objects including a TUFI tile (a thermal protection system tile used on the Space Shuttle and possibly the Orion or similar capsules). This TUFI tile had simulated impact damage that was located and the depth of damage determined. The CT motion control gan try was designed and constructed, and then integrated with a T-Ray 4000 control unit and motion controller to create a complete CT TD-THz imaging system prototype. A data collection software script was developed that takes multiple z-axis slices in sequence and saves the data for batch processing. The data collection software was integrated with the ability to batch process the slice data with the CT TD-THz image reconstruction software. The time required to take a single CT slice was decreased from six minutes to approximately one minute by replacing the 320 ps, 100-Hz waveform acquisition system with an 80 ps, 1,000-Hz waveform acquisition system. The TD-THZ computed tomography system was built from pre-existing commercial off-the-shelf subsystems. A CT motion control gantry was constructed from COTS components that can handle larger samples. The motion control gantry allows inspection of sample sizes of up to approximately one cubic foot (.0.03 cubic meters). The system reduced to practice a CT-TDTHz system incorporating a COTS 80- ps/l-kHz waveform scanner. The incorporation of this scanner in the system allows acquisition of 3D slice data with better signal-to-noise using a COTS scanner rather than the gchirped h scanner. The system also reduced to practice a prototype for commercial CT systems for insulating materials where safety concerns cannot accommodate x-ray. A software script was written to automate the COTS software to collect and process TD-THz CT data.

Zimdars, David↗

Development and implementation of a shuttle modal inspection system

One of the major tasks between Space Shuttle flights is inspection of the orbiter subsystems such as control surfaces, vertical tail, and wings. To date, inspection techniques have consisted primarily of visual and X-ray methods, which are not only time consuming but not as comprehensive as desired. Previous shuttle component and orbiter ground modal testing revealed that orbiter component damage could be identified using standard modal test methods. As a result, NASA has procured a dedicated shuttle modal inspection system (SMIS) that will be used for subsystem inspection. This paper presents a background on the use of modal testing to detect shuttle component damage, details on this new implementation, and an early use of the SMIS capability to investigate a potential orbiter vibration problem.

Hunt, David L.↗

External Tank - The Structure Backbone

The External Tank forms the structural backbone of the Space Shuttle in the launch configuration. Because the tank flies to orbital velocity with the Space Shuttle Orbiter, minimization of weight is mandatory, to maximize payload performance. Choice of lightweight materials both for structure and thermal conditioning was necessary. The tank is large, and unique manufacturing facilities, tooling, handling, and transportation operations were required. Weld processes and tooling evolved with the design as it matured through several block changes, to reduce weight. Non Destructive Evaluation methods were used to assure integrity of welds and thermal protection system materials. The aluminum-lithium alloy was used near the end of the program and weld processes and weld repair techniques had to be refined. Development and implementation of friction stir welding was a substantial technology development incorporated during the Program. Automated thermal protection system application processes were developed for the majority of the tank surface. Material obsolescence was an issue throughout the 40 year program. The final configuration and tank weight enabled international space station assembly in a high inclination orbit allowing international cooperation with the Russian Federal Space Agency. Numerous process controls were implemented to assure product quality, and innovative proof testing was accomplished prior to delivery. Process controls were implemented to assure cleanliness in the production environment, to control contaminants, and to preclude corrosion. Each tank was accepted via rigorous inspections, including non-destructive evaluation techniques, proof testing, and all systems testing. In the post STS-107 era, the project focused on ascent debris risk reduction. This was accomplished via stringent process controls, post flight assessment using substantially improved imagery, and selective redesigns. These efforts were supported with a number of test programs to simulate combined environments. Processing improvements included development and use of low spray guns for foam application, additional human factors considerations for production, use of high fidelity mockups during hardware processing with video review, improved tank access, extensive use of non destructive evaluation, and producibility enhancements. Design improvements included redesigned bipod fittings, a bellows heater, a feedline camera active during ascent flight, removal of the protuberance airload ramps, redesigned ice frost ramps, and titanium brackets replaced aluminum brackets on the liquid oxygen feedline. Post flight assessment improved due to significant addition of imagery assets, greatly improving situational awareness. The debris risk was reduced by two orders of magnitude. During this time a major natural disaster was overcome when Katrina damaged the manufacturing facility. Numerous lessons from these efforts are documented within the paper.

Welzyn, Kenneth↗

Validation Test Results for Orthogonal Probe Eddy Current Thruster Inspection System

Recent nondestructive evaluation efforts within NASA have focused on an inspection system for the detection of intergranular cracking originating in the relief radius of Primary Reaction Control System (PCRS) Thrusters. Of particular concern is deep cracking in this area which could lead to combustion leakage in the event of through wall cracking from the relief radius into an acoustic cavity of the combustion chamber. In order to reliably detect such defects while ensuring minimal false positives during inspection, the Orthogonal Probe Eddy Current (OPEC) system has been developed and an extensive validation study performed. This report describes the validation procedure, sample set, and inspection results as well as comparing validation flaws with the response from naturally occuring damage.

Wincheski, Russell A.↗