Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Integrated orbital servicing study for low-cost payload programs. Volume 2: Technical and cost analysis

Orbital maintenance concepts were examined in an effort to determine a cost effective orbital maintenance system compatible with the space transportation system. An on-orbit servicer maintenance system is recommended as the most cost effective system. A pivoting arm on-orbit servicer was selected and a preliminary design was prepared. It is indicated that orbital maintenance does not have any significant impact on the space transportation system.

Cody, E. R.↗

Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

Garrocq, C. A.↗

The growing importance of costs and ways to maintain cost control on a large program in today's competitive environment

Discussion of management techniques that make it possible to overcome inflationary and developmental cost rises while holding schedule and performance fixed in scientific space programs. The techniques reviewed pertain to high personnel motivation, continual review of contract rigidity for de facto modification by senior judgment, standardization vs design innovation, cooperative customer/contractor goal orientation vs task orientation, and deep real-time management visibility.

Newman, J. J.↗

Cost reduction in space operations - Structuring a planetary program to minimize the annual funding requirement as opposed to minimizing the program runout cost

An approach is proposed for the structuring of a planetary mission set wherein the peak annual funding is minimized to meet the annual budget restraint. One aspect of the approach is to have a transportation capability that can launch a mission in any planetary opportunity; such capability can be provided by solar electric propulsion. Another cost reduction technique is to structure a mission test in a time sequenced fashion that could utilize essentially the same spacecraft for the implementation of several missions. A third technique would be to fulfill a scientific objective in several sequential missions rather than attempt to accomplish all of the objectives with one mission. The application of the approach is illustrated by an example involving the Solar Orbiter Dual Probe mission.

Herman, D. H.↗

But what will it Cost? The history of NASA cost estimating

Within two years of being chartered in 1958 as an independent agency to conduct civilian pursuits in aeronautics and space, NASA absorbed either wholly or partially the people, facilities, and equipment of several existing organizations. These included the laboratories of the National Advisory Committee of Aeronautics (NACA) at Langley Research Center in Virginia, Ames Research Center in California, and Lewis Research Center in Ohio; the Army Ballistic Missile Agency (ABMA) at Redstone Arsenal Alabama, for which the team of Wernher von Braun worked; and the Department of Defense Advanced Research Projects Agency (ARPA) and their ongoing work on big boosters. These were especially valuable resources to jump start the new agency in light of the shocking success of the Soviet space probe Sputnik in the autumn of the previous year and the corresponding pressure from an impatient American public to produce some response. Along with these inheritances, there came some existing systems engineering and management practices, including project cost estimating methodologies. This paper will briefly trace the origins of those methods and how they evolved within the agency over the past three decades.

Hamaker, Joseph W.↗