Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Cost of Decarbonization and Energy Upgrade Retrofits for US Homes

Cost is a major barrier when upgrading homes to reduce carbon emissions required to meet DOE’s climate-related goals. This report summarizes a nationwide effort to gather home energy upgrade project cost data along with household energy performance data. The goal was to develop cost benchmarks and to guide future R&D efforts aimed at cost compression and scaling of the residential upgrade market. The cost data were compiled for both total project costs and costs of individual measures. The majority of energy savings were modeled, with some models using measured site data for calibration. The database was analyzed using clustering techniques to find common energy and CO2 reduction approaches. The individual measures were combined into archetypal solutions to determine least-cost approaches to maximizing energy and carbon savings. Several financial analyses were preformed to examine other cost metrics beyond first cost. Project data was obtained for 1,739 projects, from 15 states and 12 energy programs, with a total of 10,512 individual measures. The database includes a wide-array of projects, ranging from single-measure HVAC upgrades to net-zero energy whole home remodels. Projects were predominantly single-family detached dwellings with wood frame construction. Most of the data was obtained from energy programs because they had recorded the necessary information and were willing to share with this study. This sample of convenience can provide broad guidance and national cost benchmarks, but lacks sufficient detail to draw more disaggregated conclusions, such as geographical trends. The majority of data contributions were obtained without compensation from sources where the required data was already in some sort of structured format. We compensated sources to enter data from individual projects into a structured data format for about 500 projects, with an average cost of about $40 per project. The database was highly skewed to lower cost, lower impact projects due to the nature of the sample of convenience. Less than 10% of projects had savings greater than 50%. The cost data for individual measures in the database are being used in other DOE efforts on residential energy use/decarbonization. This data collection effort should continue in order to provide the best-informed guidance for DOE and industry R&D, as well as deployment efforts (including policy and program planning).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Increasing Density and Reducing Costs of Data Acquisition

There are a number of reasons why it is important to increase the density of data acquisition functions. Sensor fusion seeks to integrate large numbers of sensors into a decision network. Addition of health monitoring functions may incur additional sensor requirements. But at the same time, it is important to reduce the per-channel costs of data acquisition systems. Often the most significant cost is the management of data acquisition networks, which incurs substantial costs associated with transducer installation, configuration, calibration, and maintenance. Alternatives that lower the cost of the transducer system and reduce the data acquisition system channel count will directly impact initial system costs. Other techniques that affect maintenance and operating costs will contribute to reducing life cycle costs. This paper describes work undertaken to explore alternative architectures for lowering the cost per transducer function using a MEMS-based accelerometer as the model.

Schmalzel, J. L.↗

Cost effective data system design approach for EOS AM-1

The question of how to design a cost-effective data system for a space-based application with a high aggregate data rate is addressed. The steps used by the EOS AM-1 design team are defined. A summary of the design as of January 1993 is outlined. The AM-1 Science Data system is comprised of one subsystem that ingests, formats, and routes data - the Science Formatting Equipment (SFE), and another that records the data. Key interfaces are the interfaces to the high rate science instruments, the real-time transmitters, and the internal interface between the SFR and the Solid State Recorder. A cost-effective design approach for the AM-1 data system must take into account impacts on ground systems, data processing facilities, availability of data for real-time users, and future spacecraft designs.

Westmeyer, Paul A.↗

DRILLING OPTIMIZATION OF A CANEY SHALE WELL USING OFFSET WELL DRILLING DATA

Cost reduction can be achieved by utilizing drilling simulators to efficiently optimize new wells to be drilled using available adjacent or offset well drilling data. Different approaches involving simulators that use inverted rate of penetration (ROP) models have been implemented to help improve the drilling performance of wells primarily within the Caney shale. A complete simulation and optimization technique is presented herein which utilizes drilling data from a nearby or offset well (Garrett well) to create an optimized drilling program for a new well to be drilled (Gallaway well).

02 PETROLEUM↗

Production cost methods and data

The general gas cost equation for utility financing is presented. Modifications and assumptions made in order to apply the cost equation to hydrogen production are described. Cost data are given for various methods of hydrogen production. The cost matrix procedure is briefly discussed.

Jeffe, R. E.↗

Cost estimation model for advanced planetary programs, fourth edition

The development of the planetary program cost model is discussed. The Model was updated to incorporate cost data from the most recent US planetary flight projects and extensively revised to more accurately capture the information in the historical cost data base. This data base is comprised of the historical cost data for 13 unmanned lunar and planetary flight programs. The revision was made with a two fold objective: to increase the flexibility of the model in its ability to deal with the broad scope of scenarios under consideration for future missions, and to maintain and possibly improve upon the confidence in the model's capabilities with an expected accuracy of 20%. The Model development included a labor/cost proxy analysis, selection of the functional forms of the estimating relationships, and test statistics. An analysis of the Model is discussed and two sample applications of the cost model are presented.

Spadoni, D. J.↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

Commercial Building Sensors and Controls Systems: Barriers, Drivers, and Costs

Building sensors and controls systems, including building automation systems, consists of the sensor-based devices installed in buildings and the control and automation of those devices. Optimized sensors and controls systems could lead to 29% annual energy savings in commercial buildings and are integral to the growth of grid-interactive efficient buildings. Only 8% of small commercial buildings, however, have installed sensors and controls systems. This is largely due to cost barriers. This work seeks to increase the transparency of system costs and identify specific barriers and drivers for increased adoption. To gather industry insights, the team reached out to building owners, vendors, and contractors and conducted 20 interviews with the goal of collecting cost data and market characteristics regarding building sensors and controls. The qualitative interview data was analyzed using grounded theory to identify overarching concepts, such as barriers, drivers, and future directions on the field. From this analysis, primary barriers were found to be complexity, a lack of knowledge, and money. Primary drivers were found to be the knowledge of data, savings, and remote access. The qualitative cost data was collected in the form of invoices during the interviews. The cost values were used to develop a percentage-based cost stack which identifies the average fraction of the total cost attributed to each category (hardware, software, labor, fees, and taxes). This greater understanding of costs and barriers associated with commercial building sensors and controls systems lays the groundwork for future steps in increasing system adoption, reducing energy consumption, and market transformation.

advanced building controls↗

Open-source microreactor design models for technoeconomic assessments

Technoeconomic analyses for advanced nuclear technologies are essential for identifying cost drivers which allow for optimizing the technology to achieve better economic performance. Microreactors are emerging as a promising and reliable-energy solution, offering inherent safety, low capital investment, and rapid deployment capabilities. Past studies have conducted technoeconomic analyses for microreactors, but there remains a need for open-source technoeconomic models that can enhance collaboration, transparency, and consistency when performing this type of analysis. The present article introduces an open-source technoeconomic model for microreactors based on bottom-up cost estimation. Since no real cost data for microreactors exists, this model leverages cost data and insights gleaned from the Microreactor Applications, Research, Validation and Evaluation (MARVEL) project. It estimates the first-of-a-kind cost of two microreactor technologies and can also calculate the N th of a kind (NOAK) cost via accounting for learning and mass factory production. The two technologies considered in this paper are the liquid–metal thermal reactor (LTMR) and the gas-cooled microreactor (GCMR). In conclusion, the goal of this study is to demonstrate bottom-up cost estimation of these microreactor technologies and provide the cost estimation models that other users can leverage for various applications such as design optimization and financial planning.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Study of solid rocket motors for a space shuttle booster. Volume 2, book 3, addendum 1: Cost estimating data

A second iteration of the program baseline configuration and cost for the solid propellant rocket engines used with the space shuttle booster system is presented. The purpose of the study was to ensure that total program costs were complete and to review areas where costs might be overly conservative and could be reduced. Labor and material were analyzed in more depth, more definition was prepared to separate recurring from nonrecurring costs, and the operations portions of the engine and stage were separated into more identifiable activities.

Vonderesch, A. H.↗

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE↗

A 20 Year Lifecycle Study for Launch Facilities at the Kennedy Space Center

The lifecycle cost analysis was based on corrosion costs for the Kennedy Space Center's Launch Complexes and Mobile Launch Platforms. The first step in the study involved identifying the relevant assets that would be included. Secondly, the identification and collection of the corrosion control cost data for the selected assets was completed. Corrosion control costs were separated into four categories. The sources of cost included the NASA labor for civil servant personnel directly involved in overseeing and managing corrosion control of the assets, United Space Alliance (USA) contractual requirements for performing planned corrosion control tasks, USA performance of unplanned corrosion control tasks, and Testing and Development. Corrosion control operations performed under USA contractual requirements were the most significant contributors to the total cost of corrosion. The operations include the inspection of the pad, routine maintenance of the pad, medium and large scale blasting and repainting activities, and the repair and replacement of structural metal elements. Cost data was collected from the years between 2001 and 2007. These costs were then extrapolated to future years to calculate the 20 year lifecycle costs.

Kolody, Mark R.↗

The Distributed Wind Cost Taxonomy

To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

17 WIND ENERGY↗

Q1-2025 Solar Photovoltaic System Cost Benchmarks

The U.S. Department of Energy’s solar office and its national laboratory partners analyze cost data for U.S. solar photovoltaic systems to develop cost benchmarks to measure progress toward goals and guide research and development programs. The cost data is available in an Excel spreadsheet model that can be downloaded here.

14 SOLAR ENERGY↗

Commercial Building Sensors and Controls Systems: Barriers and Drivers: Preprint

Building sensors and controls systems, including building automation systems, comprise the sensor-based devices installed in buildings as well as the control and automation of those devices. Optimized sensors and controls systems could lead to 29% annual energy savings in commercial buildings and are integral to the growth of grid-interactive efficient buildings. Only 13% of small commercial buildings, however, have installed sensors and controls systems, largely because of cost barriers. To accelerate adoption, this work seeks to increase the transparency of system costs and identify specific barriers and drivers. To gather industry insights, the team reached out to building owners, vendors, and contractors and conducted 21 interviews with the goal of collecting cost data and market characteristics regarding building sensors and controls. We collected the cost data in the form of invoices and used it to develop a percentage-based cost category breakdown. The interview data were analyzed using grounded theory to identify overarching concepts such as barriers, drivers, and future directions. From this analysis, we found the primary barriers to be complex and confusing systems, lack of user skills, and financial concerns, and the primary drivers to be operational benefits, insight into operations, and remote access to data. The future directions analysis highlighted the potential technological solutions to address gaps and barriers, as well as predicted drivers to increase adoption. This greater understanding of the costs, barriers, and drivers associated with commercial building sensors and controls systems lays the groundwork for increasing system adoption, reducing energy consumption, and transforming the market.

building automation system↗