Planetary spacecraft cost modeling utilizing labor estimating relationships

A basic computerized technology is presented for estimating labor hours and cost of unmanned planetary and lunar programs. The user friendly methodology designated Labor Estimating Relationship/Cost Estimating Relationship (LERCER) organizes the forecasting process according to vehicle subsystem levels. The level of input variables required by the model in predicting cost is consistent with pre-Phase A type mission analysis. Twenty one program categories were used in the modeling. To develop the model, numerous LER and CER studies were surveyed and modified when required. The result of the research along with components of the LERCER program are reported.

Williams, Raymond↗

Cost analysis of new and retrofit hot-air type solar assisted heating systems

A detailed cost analysis/cost improvement study was performed on two Department of Energy/National Aeronautics and Space Administration operational test sites to determine actual costs and potential cost improvements of new and retrofit hot air type, solar assisted heating and hot water systems for single family sized structures. This analysis concentrated on the first cost of a system which included procurement, installation, and integration of a solar assisted heating and hot water system on a new or retrofit basis; it also provided several cost projections which can be used as inputs to payback analyses, depending upon the degree of optimism or future improvements assumed. Cost definitions were developed for five categories of cost, and preliminary estimates were developed for each. The costing methodology, approach, and results together with several candidate low cost designs are described.

Stewart, R. D.↗

The importance of operations, risk, and cost assessment to space transfer systems design

This paper examines several methodologies which contribute to comprehensive subsystem cost estimation. The example of a space-based lunar space transfer vehicle (STV) design is used to illustrate how including both primary and secondary factors into cost affects the decision of whether to use aerobraking or propulsion for earth orbit capture upon lunar return. The expected dominant cost factor in this decision is earth-to-orbit launch cost driven by STV mass. However, to quantify other significant cost factors, this cost comparison included a risk analysis to identify development and testing costs, a Taguchi design of experiments to determine a minimum mass aerobrake design, and a detailed operations analysis. As a result, the predicted cost advantage of aerobraking, while still positive, was subsequently reduced by about 30 percent compared to the simpler mass-based cost estimates.

Ball, J. M.↗

Gaussian Process Regression Method for Costing SmallSat Bus Capabilities

NASA is responding to the growing interest in, andcapabilities of, small satellites for science applications with an increasingnumber and frequency of Announcements of Opportunityfor small satellite space missions. Estimating the probabilitythat these mission concepts will fit within the small cost capsof these opportunities is largely driven by the probability thatone of the burgeoning number of small satellite providers will beable to meet the payload’s accommodation requirements withinthe budget for the spacecraft. JPL has collected a databasecontaining technical specifications and cost of commerciallyavailable Smallsat buses across various vendors. The primarypurpose of the database is for use in JPL’s Team X architecturestudies to inform cost estimates of a spacecraft bus which fitsthe customer’s technical requirements for their payload andmission. Customer needs are often unique and don’t alignperfectly with an off-the-shelf commercial spacecraft bus, whichmotivates the need to develop a cost model across the continuoustechnical parameter space.Al’s Bus Cost Distribution Estimator (ABCDE) uses Gaussianprocess regression (GPR) to predict commercial Smallsat spacecraftbus cost based on a subset of a customer’s technicalrequirements (payload mass, payload power, delta V, pointingcontrol, and downlink rate). GPR is implemented in ABCDE asa Bayesian method which fits an implied multivariate regressionon the technical parameters and uses kriging to intentionally“overfit” the residuals. Overfitting the residuals allows costestimates to collapse in uncertainty closer to the data pointswhile maintaining larger uncertainty intervals in regions of parameterspace with fewer data records. The data used to fit thismodel is sensitive and represents cost estimates for off-the-shelfcommercial buses. GPR simultaneously protects the sensitivityof the database and uses the sparse nature of the database toaccount for uncertainty in cost in a useful way. For a givenset of customer technical requirements, the tool provides a costestimate distribution, the percentiles of which can be interpretedas a confidence level of finding a commercial bus under a specifiedcost cap. ABCDE dramatically pushes the boundaries ofspacecraft cost estimation models due to its Bayesian methodology(accounting for the maximum uncertainty in the underlyingregression), the mathematically advanced kriging methodology,and the novelty of its application in Team X architecture tradestudies.

Austin, Alex↗

An approach to software cost estimation

A general procedure for software cost estimation in any environment is outlined. The basic concepts of work and effort estimation are explained, some popular resource estimation models are reviewed, and the accuracy of source estimates is discussed. A software cost prediction procedure based on the experiences of the Software Engineering Laboratory in the flight dynamics area and incorporating management expertise, cost models, and historical data is described. The sources of information and relevant parameters available during each phase of the software life cycle are identified. The methodology suggested incorporates these elements into a customized management tool for software cost prediction. Detailed guidelines for estimation in the flight dynamics environment developed using this methodology are presented.

Mcgarry, F.↗

Satellite servicing mission preliminary cost estimation model

The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.

Source record↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

Review of a Draft - Avoiding the Impossible: Re-focusing a Non-Feasible Mission 2-Hrs into a 3-Day Engineering Session

Concurrent engineering offers a great many benefits to engineers and mission designers throughout the world of aerospace. The only downside of concurrent engineering, and this is somewhat unavoidable, is that you don’t know the results of a design session until the end when it is completed. Usually, this is not a problem – you wouldn’t start building a spacecraft before the design is finished. However, within mass and cost constrained systems, you may end up with a final design that although technically sound – is not feasible due to mass or cost limits. Employing in-session mass and cost models with flexible inputs that refine their estimates and variance as more detailed information comes in throughout a design session allows major design changes to be made when the probability of breaching a mass or cost cap exceeds a threshold level. This enables mission designers to re-focus the study, and avoid spending 3-days with 15 engineers designing a non-feasible mission. By understanding key correlations and nested relationships within mass or cost, and specifically mass or cost allocations per mission element by mission type, it’s possible to get flexible-input, statistically based mass and cost estimates very early in the design process. Baseline models are seeded using mission characteristics and general parameters (outer planetary orbiter-probe mission, $500M cost cap for example) to provide a rough estimate of the expected mass or cost. As information gets solidified during the session, it gets added to the model and the estimates are updated. Continuing the orbiter-probe mission example, modeling probe heat shield cost as a percent of total probe cost, and probe cost as a percent of total flight system cost, and total flight system cost as a percent of total mission cost allows a design team to roll-up solidified information to estimate the probability of fitting within a mass or cost constraint early in a concurrent design session. When only the heat shield cost is known, the variance of the final estimate is higher, whereas when the full probe gets defined, naturally, the variance of the estimate decreases. A methodology, model, verification and demo implementation for cost limit breach are presented.

Hihn, Jairus M.↗

The determination of operational and support requirements and costs during the conceptual design of space systems

The first year of research to provide NASA support in predicting operational and support parameters and costs of proposed space systems is reported. Some of the specific research objectives were (1) to develop a methodology for deriving reliability and maintainability parameters and, based upon their estimates, determine the operational capability and support costs, and (2) to identify data sources and establish an initial data base to implement the methodology. Implementation of the methodology is accomplished through the development of a comprehensive computer model. While the model appears to work reasonably well when applied to aircraft systems, it was not accurate when used for space systems. The model is dynamic and should be updated as new data become available. It is particularly important to integrate the current aircraft data base with data obtained from the Space Shuttle and other space systems since subsystems unique to a space vehicle require data not available from aircraft. This research only addressed the major subsystems on the vehicle.

Ebeling, Charles↗

An activity-based methodology for operations cost analysis

This report describes an activity-based cost estimation method, proposed for the Space Exploration Initiative (SEI), as an alternative to NASA's traditional mass-based cost estimation method. A case study demonstrates how the activity-based cost estimation technique can be used to identify the operations that have a significant impact on costs over the life cycle of the SEI. The case study yielded an operations cost of $101 billion for the 20-year span of the lunar surface operations for the Option 5a program architecture. In addition, the results indicated that the support and training costs for the missions were the greatest contributors to the annual cost estimates. A cost-sensitivity analysis of the cultural and architectural drivers determined that the length of training and the amount of support associated with the ground support personnel for mission activities are the most significant cost contributors.

Korsmeyer, David↗

Predicting Cost/Reliability/Maintainability of Advanced General Aviation Avionics Equipment

A methodology is provided for assisting NASA in estimating the cost, reliability, and maintenance (CRM) requirements for general avionics equipment operating in the 1980's. Practical problems of predicting these factors are examined. The usefulness and short comings of different approaches for modeling coast and reliability estimates are discussed together with special problems caused by the lack of historical data on the cost of maintaining general aviation avionics. Suggestions are offered on how NASA might proceed in assessing cost reliability CRM implications in the absence of reliable generalized predictive models.

Davis, M. R.↗

Program and Project Management Framework

The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

Butler, Cassandra D.↗

Analysis of satellite servicing cost benefits

Under the auspices of NASA/JSC a methodology was developed to estimate the value of satellite servicing to the user community. Time and funding precluded the development of an exhaustive computer model; instead, the concept of Design Reference Missions was involved. In this approach, three space programs were analyzed for various levels of servicing. The programs selected fall into broad categories which include 80 to 90% of the missions planned between now and the end of the century. Of necessity, the extrapolation of the three program analyses to the user community as a whole depends on an average mission model and equivalency projections. The value of the estimated cost benefits based on this approach depends largely on how well the equivalency assumptions and the mission model match the real world. A careful definition of all assumptions permits the analysis to be extended to conditions beyond the scope of this study.

Builteman, H. O.↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

Orbital Space Plane Cost Credibility

NASA's largest new start development program is the Orbital Space Plane (OSP) Program. The program is currently in the formulation stage. One of the critical issues to be resolved, prior to initiating full-scale development, is establishing cost credibility of NASA s budget estimates for development, production, and operations of the OSP. This paper will discuss the processes, tools, and methodologies that NASA, along with its industry partners, are implementing to assure cost credibility for the OSP program. Results of benchmarking of current tools and the development of new cost estimating capabilities and approaches will be discussed.

Creech, Steve↗

Systems cost performance analysis (study 2.3). Volume 1: Executive summary

A methodology for developing balanced designs of spacecraft subsystems which interrelates cost, performance, safety, and schedule considerations was developed. The methodology consists of a two-step process: selection of all hardware designs which satisfy the given performance and safety requirements; and estimating the cost and schedule required to design, build, and operate each spacecraft design. Aggregate equations were written to describe the performance, safety (reliability), cost, and schedule required for one type of stabilization and control subsystem in terms of the equipment used. The methodology was applied to unmanned, automated spacecraft subsystems, and the resulting model was implemented as a digital computer program.

Source record↗

Proposed Reliability/Cost Model

New technique estimates cost of improvement in reliability for complex system. Model format/approach is dependent upon use of subsystem cost-estimating relationships (CER's) in devising cost-effective policy. Proposed methodology should have application in broad range of engineering management decisions.

Delionback, L. M.↗