Pros, Cons, and Alternatives to Weight Based Cost Estimating

Many cost estimating tools use weight as a major parameter in projecting the cost. This is often combined with modifying factors such as complexity, technical maturity of design, environment of operation, etc. to increase the fidelity of the estimate. For a set of conceptual designs, all meeting the same requirements, increased weight can be a major driver in increased cost. However, once a design is fixed, increased weight generally decreases cost, while decreased weight generally increases cost - and the relationship is not linear. Alternative approaches to estimating cost without using weight (except perhaps for materials costs) have been attempted to try to produce a tool usable throughout the design process - from concept studies through development. This paper will address the pros and cons of using weight based models for cost estimating, using liquid rocket engines as the example. It will then examine approaches that minimize the imp~ct of weight based cost estimating. The Rocket Engine- Cost Model (RECM) is an attribute based model developed internally by Pratt & Whitney Rocketdyne for NASA. RECM will be presented primarily to show a successful method to use design and programmatic parameters instead of weight to estimate both design and development costs and production costs. An operations model developed by KSC, the Launch and Landing Effects Ground Operations model (LLEGO), will also be discussed.

Joyner, Claude R.↗

Weight and cost forecasting for advanced manned space vehicles

A mass and cost estimating computerized methology for predicting advanced manned space vehicle weights and costs was developed. The user friendly methology designated MERCER (Mass Estimating Relationship/Cost Estimating Relationship) organizes the predictive process according to major vehicle subsystem levels. Design, development, test, evaluation, and flight hardware cost forecasting is treated by the study. This methodology consists of a complete set of mass estimating relationships (MERs) which serve as the control components for the model and cost estimating relationships (CERs) which use MER output as input. To develop this model, numerous MER and CER studies were surveyed and modified where required. Additionally, relationships were regressed from raw data to accommodate the methology. The models and formulations which estimated the cost of historical vehicles to within 20 percent of the actual cost were selected. The result of the research, along with components of the MERCER Program, are reported. On the basis of the analysis, the following conclusions were established: (1) The cost of a spacecraft is best estimated by summing the cost of individual subsystems; (2) No one cost equation can be used for forecasting the cost of all spacecraft; (3) Spacecraft cost is highly correlated with its mass; (4) No study surveyed contained sufficient formulations to autonomously forecast the cost and weight of the entire advanced manned vehicle spacecraft program; (5) No user friendly program was found that linked MERs with CERs to produce spacecraft cost; and (6) The group accumulation weight estimation method (summing the estimated weights of the various subsystems) proved to be a useful method for finding total weight and cost of a spacecraft.

Williams, Raymond↗

Cost Model Comparison: A Study of Internally and Commercially Developed Cost Models in Use by NASA

NASA makes use of numerous cost models to accurately estimate the cost of various components of a mission - hardware, software, mission/ground operations - during the different stages of a mission's lifecycle. The purpose of this project was to survey these models and determine in which respects they are similar and in which they are different. The initial survey included a study of the cost drivers for each model, the form of each model (linear/exponential/other CER, range/point output, capable of risk/sensitivity analysis), and for what types of missions and for what phases of a mission lifecycle each model is capable of estimating cost. The models taken into consideration consisted of both those that were developed by NASA and those that were commercially developed: GSECT, NAFCOM, SCAT, QuickCost, PRICE, and SEER. Once the initial survey was completed, the next step in the project was to compare the cost models' capabilities in terms of Work Breakdown Structure (WBS) elements. This final comparison was then portrayed in a visual manner with Venn diagrams. All of the materials produced in the process of this study were then posted on the Ground Segment Team (GST) Wiki.

cost models↗

Software Development Cost Estimation Executive Summary

Identify simple fully validated cost models that provide estimation uncertainty with cost estimate. Based on COCOMO variable set. Use machine learning techniques to determine: a) Minimum number of cost drivers required for NASA domain based cost models; b) Minimum number of data records required and c) Estimation Uncertainty. Build a repository of software cost estimation information. Coordinating tool development and data collection with: a) Tasks funded by PA&E Cost Analysis; b) IV&V Effort Estimation Task and c) NASA SEPG activities.

data mining↗

Selected Tether Applications Cost Model

Diverse cost-estimating techniques and data combined into single program. Selected Tether Applications Cost Model (STACOM 1.0) is interactive accounting software tool providing means for combining several independent cost-estimating programs into fully-integrated mathematical model capable of assessing costs, analyzing benefits, providing file-handling utilities, and putting out information in text and graphical forms to screen, printer, or plotter. Program based on Lotus 1-2-3, version 2.0. Developed to provide clear, concise traceability and visibility into methodology and rationale for estimating costs and benefits of operations of Space Station tether deployer system.

Keeley, Michael G.↗

Estimating the Cost of Doing a Cost Estimate

This article provides a model for estimating the cost required to do a cost estimate...Our earlier work provided data for high technology projects. This article adds data from the construction industry which validates the model over a wider range of technology.

Cost cost estimating budgets budget estimating pro↗

Quantitative software models for the estimation of cost, size, and defects

The presentation will provide a brief overview of the SQI measurement program as well as describe each of these models and how they are currently being used in supporting JPL project, task and software managers to estimate and plan future software systems and subsystems.

software metrics process improvement↗

Solar-assisted gas-energy water-heating feasibility for apartments

Studies of residential energy use, solar-energy technology for buildings, and the requirements for implementing technology in the housing industry led to a project to develop a solar water heater for apartments. A design study for a specific apartment was used to establish a solar water-heater cost model which is based on plumbing contractor bids and manufacturer estimates. The cost model was used to size the system to minimize the annualized cost of hot water. The annualized cost of solar-assisted gas-energy water heating is found to be less expensive than electric water heating but more expensive than gas water heating. The feasibility of a natural gas utility supplying the auxiliary fuel is evaluated. It is estimated that gas-utilizing companies will find it profitable to offer solar water heating as part of a total energy service option or on a lease basis when the price of new base-load supplies of natural gas reaches $2.50-$3.00 per million Btu.

Davis, E. S.↗

Application of parametric weight and cost estimating relationships to future transport aircraft

A model comprised of system level weight and cost estimating relationships for transport aircraft is presented. In order to determine the production cost of future aircraft its weight is first estimated based on performance parameters, and then the cost is estimated as a function of weight. For initial evaluation CERs were applied to actual system weights of six aircraft (3 military and 3 commercial) with mean empty weights ranging from 30,000 to 300,000 lb. The resulting cost estimates were compared with actual costs. The average absolute error was only 4.3%. Then the model was applied to five aircraft still in the design phase (Boeing 757, 767 and 777, and BAC HS146-100 and HS146-200). While the estimates for the 757 and 767 are within 2 to 3 percent of their assumed break-even costs, it is recognized that these are very sensitive to the validity of the estimated weights, inflation factor, the amount assumed for nonrecurring costs, etc., and it is suggested that the model may be used in conjunction with other information such as RDT&E cost estimates and market forecasts. The model will help NASA evaluate new technologies and production costs of future aircraft.

Beltramo, M. N.↗

Estimation Model of Spacecraft Parameters and Cost Based on a Statistical Analysis of COMPASS Designs

The Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team at Glenn Research Center has performed integrated system analysis of conceptual spacecraft mission designs since 2006 using a multidisciplinary concurrent engineering process. The set of completed designs was archived in a database, to allow for the study of relationships between design parameters. Although COMPASS uses a parametric spacecraft costing model, this research investigated the possibility of using a top-down approach to rapidly estimate the overall vehicle costs. This paper presents the relationships between significant design variables, including breakdowns of dry mass, wet mass, and cost. It also develops a model for a broad estimate of these parameters through basic mission characteristics, including the target location distance, the payload mass, the duration, the delta-v requirement, and the type of mission, propulsion, and electrical power. Finally, this paper examines the accuracy of this model in regards to past COMPASS designs, with an assessment of outlying spacecraft, and compares the results to historical data of completed NASA missions.

cost modeling↗

The Opportunity in Commercial Approaches for Future NASA Deep Space Exploration Elements

This work joins two events, showing the potential for commercial, public private partnerships, modeled on programs like COTS, to reduce the cost to NASA significantly for other required deep space exploration capabilities. These other capabilities include landers, stages and more. We mature the concept of costed baseball cards, adding cost estimates to NASAs space systems baseball cards.

cost modeling estimation↗

Improving and Expanding NASA Software Cost Estimation Methods

Estimators and analysts are increasingly being tasked to develop better models and reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods for cost estimation, there is very little focus on the use of cost models based on analogy and clustering algorithms. In this paper we summarize the results of our research in developing an analogy method for estimating NASA spacecraft flight software using spectral clustering on system characteristics (symbolic nonnumerical data) and evaluate its performance by comparing it to a number of the most commonly used estimation methods. The strengths and weaknesses of each method based on their performance are also discussed. The paper concludes with an overview of the analogy estimation tool (ASCoT) developed for use within NASA that implements the recommended analogy algorithm.

Hihn, Jairus↗

Modeling preparation costs for space missions by using major cost drivers

A model is suggested for making long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of major mission cost drivers, such as maintenance and operations, downlink frequency upgrade, uplink frequency upgrade, telemetry upgrade, antenna gain/noise temperature, radiometric accuracy upgrade, radio science upgrade, and very long baseline interferometry. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. The model allows one to estimate the total cost and the cost over time of a similar future space mission. The model was back tested against the three projects and gave cost estimates that range from 17 pct. below to 19 pct. above actual mission preparation costs. The model was also compared with two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager) and Viking. The model gave total preparation cost estimates that range from 15 pct. above to 4 pct. below actual total preparation costs for MJS and Viking, respectively.

Sherif, J. S.↗

Cost Modeling for low-cost planetary missions

This presentation will provide an overview of the JPL parametric cost models used to estimate flight science spacecrafts and instruments. This material will emphasize the cost model approaches to estimate low-cost flight hardware, sensors, and instrumentation, and to perform cost-risk assessments. This presentation will also discuss JPL approaches to perform cost modeling and the methodologies and analyses used to capture low-cost vs. key cost drivers.

cost model↗

The Launch Systems Operations Cost Model

One of NASA's primary missions is to reduce the cost of access to space while simultaneously increasing safety. A key component, and one of the least understood, is the recurring operations and support cost for reusable launch systems. In order to predict these costs, NASA, under the leadership of the Independent Program Assessment Office (IPAO), has commissioned the development of a Launch Systems Operations Cost Model (LSOCM). LSOCM is a tool to predict the operations & support (O&S) cost of new and modified reusable (and partially reusable) launch systems. The requirements are to predict the non-recurring cost for the ground infrastructure and the recurring cost of maintaining that infrastructure, performing vehicle logistics, and performing the O&S actions to return the vehicle to flight. In addition, the model must estimate the time required to cycle the vehicle through all of the ground processing activities. The current version of LSOCM is an amalgamation of existing tools, leveraging our understanding of shuttle operations cost with a means of predicting how the maintenance burden will change as the vehicle becomes more aircraft like. The use of the Conceptual Operations Manpower Estimating Tool/Operations Cost Model (COMET/OCM) provides a solid point of departure based on shuttle and expendable launch vehicle (ELV) experience. The incorporation of the Reliability and Maintainability Analysis Tool (RMAT) as expressed by a set of response surface model equations gives a method for estimating how changing launch system characteristics affects cost and cycle time as compared to today's shuttle system. Plans are being made to improve the model. The development team will be spending the next few months devising a structured methodology that will enable verified and validated algorithms to give accurate cost estimates. To assist in this endeavor the LSOCM team is part of an Agency wide effort to combine resources with other cost and operations professionals to support models, databases, and operations assessments.

Prince, Frank A.↗

The Dangers of Parametrics

Building a parametric cost model is hard work. The data is noisy and often does not behave like we want it to. We need statistics to give us an indication of the goodness of our models, but; statistics can be manipulated and mislead. On top of all of that, our own very human biases can lead us astray; causing us to see patterns in the noise and draw false conclusions from the data. Yet, it is the data itself that is the foundation for making better cost estimates and cost models. I believe the mistake we often make is we believe that our models are representative of the data; that our models summarize the experiences, the knowledge, and the stories contained in the data. However, it is the opposite that is true. Our models are but imitations of reality. They give us trends, but not truth. The experiences, the knowledge, and the stories that we need in order to make good cost estimates is bound up in the data. You cannot separate good cost estimating from a knowledge of the historical data. One final thought. It is our attempts to make sense out of the randomness that leads us astray. In order to make progress as cost modelers and cost estimators, we must accept that there are real limitations on our ability to model the past and predict the future. I do not believe we should throw up our hands and say this is the best we can do. Rather, to see real improvement we must first recognize these limitations, avoid the easy but misleading solutions, and seek to find ways to better model the world we live in. I don't have any simple solutions. Perhaps the answers lie in better data or in a totally different approach to simulating how the world works. All I know is that we must do our best to speak truth to ourselves and our customers. Misleading ourselves and our customers will, in the end, result in an inability to have a positive impact on those we serve.

Prince, Frank A.↗