Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Design concepts and cost studies for magnetic suspension and balance systems

The application of superconducting magnets for suspension and balance of wind tunnel models was studied. Conceptual designs are presented for magnetic suspension and balance system (MSBS) configurations compatible with three high Reynolds number cases representing specified combinations of test conditions and model sizes. Concepts in general met initially specified performance requirements such as duty cycle, force and moment levels, model angular displacement and positioning accuracy with nominal design requirements for support subsystems. Other performance requirements, such as forced model sinusoidal oscillations, and control force magnitude and frequency, were modified so as to alleviate the magnitude of magnet, power, and cryogenic design requirements.

Bloom, H. L.↗

Space station needs, attributes and architectural options study costing working group briefing

The interface between tasks and the sequence of information flow are charted. The mission model and the requirements of each mission. These requirements along with the mission model schedule resulted in a further definition of the mission payloads, the Space Station architecture and the STS requirements was developed in task 2. The information was used to estimate the cost parameters necessary to generate cost estimates for the system with the aid of cost models for the Missions, Space Station and Space Transportation.

Source record↗

Space station needs attributes and architectural options study costing working group briefing

Individuals in the United States who understand the promise of materials processing in space and who also are senior technical personnel associated with commercial firms that process materials: (1) endorsed the concept of a space station as a desirable national asset; (2) stated that a commercial MPS research program is mandatory to extend commericalization of space for materials processing; and (3) described in general terms a national research laboratory and free flying facilities that are needed. Participants agreed that industry R&D is motivated largely by market pull rather than by technology push, that initial interest is low-g materials research; and that to farther, commercial market assurance (a salable product) is a must.

Source record↗

Low cost payload studies

Low cost payload studies aimed at the reduction of Space Shuttle cost, with the emphasis on mission support subsystem equipment, are reviewed. Spacecraft design, manufacturing and operational approaches are specified and quantified to demonstrate the feasibility of reductions of cost from present-day estimates. Space Shuttle design capabilities for retrieval, repair, and reuse of future payloads are indicated as cost reduction possibilities. It is also pointed out that an increased volume and weight carrying capability of the Space Shuttle can alter the design approach to future payloads to reduce cost. Details are given on some specific subsystem component design alterations integrated in an overall low-cost payload design. Refurbishment is discussed as the final area of interest for low cost payload design. Total program savings of up to 50% are found to be possible in the studies.

Moore, W. F.↗

Study to establish cost projections for production of Redox chemicals

A cost study of four proposed manufacturing processes for redox chemicals for the NASA REDOX Energy Storage System yielded favorable selling prices in the range $0.99 to $1.91/kg of chromic chloride, anhydrous basis, including ferrous chloride. The prices corresponded to specific energy storage costs from under $9 to $17/kWh. A refined and expanded cost analysis of the most favored process yielded a price estimate corresponding to a storage cost of $11/kWh. The findings supported the potential economic viability of the NASA REDOX system.

Walther, J. F.↗

Strapdown cost trend study and forecast

The potential cost advantages offered by advanced strapdown inertial technology in future commercial short-haul aircraft are summarized. The initial procurement cost and six year cost-of-ownership, which includes spares and direct maintenance cost were calculated for kinematic and inertial navigation systems such that traditional and strapdown mechanization costs could be compared. Cost results for the inertial navigation systems showed that initial costs and the cost of ownership for traditional triple redundant gimbaled inertial navigators are three times the cost of the equivalent skewed redundant strapdown inertial navigator. The net cost advantage for the strapdown kinematic system is directly attributable to the reduction in sensor count for strapdown. The strapdown kinematic system has the added advantage of providing a fail-operational inertial navigation capability for no additional cost due to the use of inertial grade sensors and attitude reference computers.

Eberlein, A. J.↗

Techniques for Conducting Effective Concept Design and Design-to-Cost Trade Studies

Concept design plays a central role in project success as its product effectively locks the majority of system life cycle cost. Such extraordinary leverage presents a business case for conducting concept design in a credible fashion, particularly for first-of-a-kind systems that advance the state of the art and that have high design uncertainty. A key challenge, however, is to know when credible design convergence has been achieved in such systems. Using a space system example, this paper characterizes the level of convergence needed for concept design in the context of technical and programmatic resource margins available in preliminary design and highlights the importance of design and cost evaluation learning curves in determining credible convergence. It also provides techniques for selecting trade study cases that promote objective concept evaluation, help reveal unknowns, and expedite convergence within the trade space and conveys general practices for conducting effective concept design-to-cost studies.

Design To Cost↗

Task three: Report: STDN Antenna and preamplifier cost tradeoff study

The general goal of this task, STDN Antenna and Preamplifier G/T Study, was to determine cost-effective combinations of antennas and preamplifiers for several sets of conditions for frequency, antenna elevation angle, and rain. The output of the study includes design curves and tables which indicate the best choice of antenna size and preamplifier type to provide a given G/T performance. The report indicates how to evaluate the cost effectiveness of proposed improvements to a given station. Certain parametric variations are presented to emphasize the improvement available by reducing RF losses and improving the antenna feed.

Source record↗

Techniques for Conducting Effective Concept Design and Design-to-Cost Trade Studies

Concept design plays a central role in project success as its product effectively locks the majority of system life cycle cost. Such extraordinary leverage presents a business case for conducting concept design in a credible fashion, particularly for first-of-a-kind systems that advance the state of the art and that have high design uncertainty. A key challenge, however, is to know when credible design convergence has been achieved in such systems. Using a space system example, this paper characterizes the level of convergence needed for concept design in the context of technical and programmatic resource margins available in preliminary design and highlights the importance of design and cost evaluation learning curves in determining credible convergence. It also provides techniques for selecting trade study cases that promote objective concept evaluation, help reveal unknowns, and expedite convergence within the trade space and conveys general practices for conducting effective concept design-to-cost studies.

Trade Studies↗

Benefit-cost methodology study with example application of the use of wind generators

An example application for cost-benefit methodology is presented for the use of wind generators. The approach adopted for the example application consisted of the following activities: (1) surveying of the available wind data and wind power system information, (2) developing models which quantitatively described wind distributions, wind power systems, and cost-benefit differences between conventional systems and wind power systems, and (3) applying the cost-benefit methodology to compare a conventional electrical energy generation system with systems which included wind power generators. Wind speed distribution data were obtained from sites throughout the contiguous United States and were used to compute plant factor contours shown on an annual and seasonal basis. Plant factor values (ratio of average output power to rated power) are found to be as high as 0.6 (on an annual average basis) in portions of the central U. S. and in sections of the New England coastal area. Two types of wind power systems were selected for the application of the cost-benefit methodology. A cost-benefit model was designed and implemented on a computer to establish a practical tool for studying the relative costs and benefits of wind power systems under a variety of conditions and to efficiently and effectively perform associated sensitivity analyses.

Zimmer, R. P.↗

Arithmetic error codes - Cost and effectiveness studies for application in digital system design.

The application of error-detecting or error-correcting codes in digital computer design requires studies of cost and effectiveness tradeoffs to supplement the knowledge of their theoretical properties. General criteria for cost and effectiveness studies of error codes are developed, and results are presented for arithmetic error codes with the low-cost check modulus 2 super a - 1. Both separate (residue) and nonseparate (AN) codes are considered. The class of multiple arithmetic error codes is developed as an extension of low-cost single codes.

Avizienis, A.↗

DCS: A global satellite environmental data collection system study

Cost analysis and technical feasibility data are presented on five medium orbiting and six geosynchronous satellite data collection systems with varying degrees of spacecraft and local user terminal complexity. Data are also provided on system approaches, user requirements, and user classes. Systems considered include orbiting ERTS and EOS type satellites and geosynchronous SmS and SEOS type data collectors.

Source record↗