Search NASASearch

SEARCH · Search NASA

Results for “deployable payload mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

NASA-ISRO Synthetic Aperture Radar (NISAR) Mission

NISAR is a multi-disciplinary Earth-observing radar mission that makes global measurements of land surface changes that will greatly improve Earth system models. NISAR data will clarify spatially and temporally complex phenomena, including ecosystem disturbances, ice sheet collapse, and natural hazards including earthquakes, tsunamis, volcanoes, and landslides. It provides societally relevant data that will enable better protection of life and property. The mission, a NASA-ISRO partnership, uses two fully polarimetric SARs, one at L-band (L-SAR) and one at S-band (S-SAR), in exact repeating orbits every 12 days that allows interferometric combination of data on repeated passes. NASA provides the L SAR; a shared deployable reflector; an engineering payload that supports mission-specific data handling, navigation and communication functions; science observation planning and L SAR data processing. ISRO provides the S-SAR, spacecraft, launch vehicle, satellite operations, and S-SAR data processing. The mission will be launched from the Satish Dhawan Space Centre, Sriharikota, India. Mission development has addressed many unique challenges and incorporates many “firsts” for a jointly-developed free-flyer radar science mission.

Sarma, C V H S

ADEPT, A Mechanically Deployable Re-Entry Vehicle System, Enabling Interplanetary CubeSat and Small Satellite Missions

There is growing interest for utilizing Small Satellites beyond low Earth orbit. A number of secondary CubeSat payload missions are planned at Mars, cis-Lunar Space, near Earth objects, and moons of the Gas Giants. Use of smaller systems may enable utilization of otherwise unused capacity of larger "host" missions. Development of re-entry systems that leverage and accommodate Small Satellite technology will substantially expand the range of mission applications by offering the capability for high speed entry or aerocapture at destinations with atmospheres. Deployable entry vehicles (DEVs) offer benefits over traditional rigid aeroshells including volume, mass and payload form factor. The Adaptive Deployable Entry and Placement Technology (ADEPT) offers such a delivery capability for Small Sat or CubeSat orbiter(s), in-situ elements, or landers. The ADEPT system can package with off the shelf CubeSat deployment systems (1U-16U) to offer a delivery capability for a single CubeSat or constellations. Furthermore, ADEPT can deliver the same science payload to a destination with a stowed diameter a factor of 3-4 times smaller than an equivalent rigid aeroshell, alleviating volumetric constraints on the secondary payload accommodation or primary carrier spacecraft bus. This paper will describe ADEPT's current development status and define various interplanetary mission concepts in order to provide guidelines for potential Small Satellite payload developers and mission implementers.

Adaptive Deployable Entry and Placement Technology

Space Launch System Departure Trajectory Analysis for Cislunar and Deep-Space Exploration

The Space Launch System will insert Orion into different orbits for Artemis I and Artemis II. The Artemis program has considerations beyond the immediate mission of inserting Orion into its desired trajectory. Primarily, following separation from Orion, the Interim Cryogenic Propulsion Stage must be safely dis-posed, and another is that secondary payloads will be deployed only after Orion separation to ensure safety of the primary mission. The first consideration (ICPS disposal) constrains the latter (secondary payload trajectories). In this paper, we give an overview of the constraints and opportunities provided by Artemis missions for secondary payloads within the Earth-Moon system and beyond.

Andrew F Heaton

Galilean satellite mission concepts

Post-Galileo mission concepts considered possible for satellite-intensive investigations are presented, with consideration given to single and multiple target scenarios using orbiter and lander deployments. Candidate missions that satisfy the selected science objectives are identified, and specific scenario/target combinations which fall within performance constraints are chosen. The concepts are then developed into descriptive mission profiles. Also discussed are target encounter and deployment requirements, payload delivery, and operational considerations. Particular attention is given to Jupiter radiation effects and shielding requirements. A wide range of satellite-intensive missions is thought to be within the performance capabilities of earth-gravity-assisted ballistic trajectories and nuclear electric propulsion technology.

Soldner, J. K.

Satellite services and orbital retrieval

Within the capabilities of the Space Shuttle Orbiter, a broad range of services which can be made available to the satellite user community as summarized. Payload deployment, close proximity retrieval, and a number of other mission related functions are discussed. The focus here is on close proximity retrieval and retrieval of payloads in higher energy low Earth orbits.

Adornato, R. J.

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins

Life sciences payloads for Shuttle

The Life Sciences Program for utilization of the Shuttle in the 1980's is presented. Requirements for life sciences research experiments in space flight are discussed along with study results of designs to meet these requirements. The span of life sciences interests in biomedicine, biology, man system integration, bioinstrumentation and life support/protective systems is described with a listing of the research areas encompassed in these descriptions. This is followed by a description of the approach used to derive from the life sciences disciplines, the research functions and instrumentation required for an orbital research program. Space Shuttle design options for life sciences experiments are identified and described. Details are presented for Spacelab laboratories for dedicated missions, mini-labs with carry on characteristics and carry on experiments for shared payload missions and free flying satellites to be deployed and retrieved by the Shuttle.

Dunning, R. W.

STS-96 FD Highlights and Crew Activities Report: Flight Day 10

On this tenth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen making final preparation for their return to Earth. Rominger Husband, and Ochoa checkout the flight control systems, perform hot-fired tests and verify the performance of Discovery's small steering jets. Jernigan and Tokarev stow all the equipment used in the mission. Payette deploys a small student-built payload called STARSHINE. The crew also tests all the communications channels.

Source record

STS-44 Mission Highlights Resource Tape. Part 1 of 2

The STS-44 mission is highlighted in this first part of a two part video set. The flight crew consisted of: Cmdr. Fred Gregory; Pilot Tom Hendricks; Payload Specialist Tom Hennen; and Mission Specialists Story Musgrave, Jim Voss, and Mario Runco. The primary space shuttle mission objective was the deployment of the Defense Support Program (DSP) satellite. Secondary payload and spaceborne experiments consisted of a microbial air sampler, the Terra Scout PADVOS system, an M88-1 camera demonstration, a lower body negative pressure test, the Visual Function Tester, and a bioreactor demonstration. A tour of the flight deck, mid-deck, bathroom, and flight compartments with explanations of the equipment found in each area was conducted, a trash compactor was demonstrated, and footage of the crew together for their Thanksgiving dinner was shown. Earth views include several oceans, cloud cover, typhoon Yuri, northeast Australia, and the Barrier Reef Islands. The actor John Patrick Stewart (Commander Pickard of the show 'Star Trek: The Next Generation') performed the wake-up call for the astronauts. This flight was shortened due to an inertial measurement unit failure on the sixth day of the mission.

Source record

The Space Shuttle - Key considerations

Typical Space Shuttle flight operations, including launch/insertion, on-orbit operations, de-orbit, and ground turnaround, are summarized. The orbiter, main engine, and solid rocket boosters will be reusable. The Shuttle will be able to abort ascent and return the orbiter plus payload to the launch site if necessary. Mission capabilities include a 7-30 day duration, crew of 4-7 (with 1-4 payload specialists), and 14,500-29,500 kg payloads. Payload accommodations, including cabin, crew provisions, pointing and position stability, thermal constraints, electric power, communications, payload deployment and retrieval, contamination control, and kits for extended missions, are considered. The Thermal Protection System, utilizing pyrolized carbon and silica tiles, is described. The Space Shuttle Main Engine design and performance are considered and compared to those of the J-2 engine used on Saturn/Apollo missions.

Malkin, M. S.

LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelerator) PASS (Payload Adapter Separation System) Design & Qualification

On November 10, 2022, NASA, in partnership with United Launch Alliance (ULA), launched Low-earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) as a secondary payload on an Atlas V Centaur out of the Vandenburg Space Force Base (VSFB). After successfully delivering the primary payload, Joint Polar Satellite System-2 (JPSS-2), to a sun synchronous trajectory, the Centaur upper stage reoriented LOFTID onto the desired reentry trajectory. After conducting a de-orbit burn to enter the atmosphere the Payload Adaptor was ejected to expose the packed LOFTID vehicle. The LOFTID Hypersonic Inflatable Aerodynamic Decelerator (HIAD) was deployed and inflated. The Centaur pointed LOFTID to the desired entry attitude and spun the vehicle up to roughly three rpm before separating the reentry vehicle over the Middle East. The LOFTID vehicle flew freely before reentering the atmosphere over Alaska at >8km/sec and decelerating as designed. LOFTID demonstrated stable flight from hypersonic entry through subsonic parachute deployment. LOFTID was enabled by a mission-unique Payload Adapter Separation System (PASS) which separated the Payload Adapter prior to the start of the LOFTID flight demonstration, allowing the launch vehicle to accommodate a superstack of two independent, similarly sized payloads. This paper will discuss the design, development, and qualification effort of the LOFTID PASS.

Sean M Hancock

STS-107 Flight Day 15 Highlights

This video shows the activities of the STS-107 crew on flight day 15 of the Columbia orbiter's final mission. The crew includes Commander Rick Husband, Pilot William McCool, Mission Specialists Michael Anderson, David Brown, Laurel Clark, and Kalpana Chawla, and Payload Specialist Ilan Ramon. The primary activities of flight day 15 are crew interviews, and operating the Water Mist Fire Suppression (MIST) experiment. Early in the video, astronauts McCool and Ramon respond together to a question. Much of the video is taken up by an interview of astronauts Brown, Anderson, and McCool. Two parts of the video show the MIST experiment in operation, operated the first time by astronaut Brown. Another part of the video is narrated by Mission Specialist Clark, who identifies views of Mount Vesuvius, and an atoll in the south Pacific. In this part, Payload Specialist Ramon is seen on an exercise machine, Commander Husband shows body fluid samples from the crew taken during the mission, and Clark demonstrates how the crew eats meals. The video ends with footage from earlier in the mission which shows a deployed radiator in the shuttle's payload bay that reflects an image of the Earth.

Source record

NEA Scout Thermal Control

The Near-Earth Asteroid Scout (NEA Scout) is a 6U CubeSat that will fly to a near earth asteroid using a solar sail. The mission is a joint project between NASA’s Marshall Space Flight Center and the Jet Propulsion Laboratory. The CubeSat will be deployed as a secondary payload during the Space Launch System (SLS) Exploration Mission 1 (EM-1). The CubeSat will use an 85 sq m (915 sq ft) aluminized polyimide solar sail for deep space propulsion. A multispectral camera will be used to characterize a small asteroid (<300 feet in diameter). The primary thermal architecture is a passive design with heaters to keep temperatures above the minimum allowable. Thermal vacuum testing was done on subsystems where possible. However for some long lead subsystems thermal vacuum testing will not be done until the final assembly.

Stewart, Elijah

STS-77 Flight Day 5

On this fifth day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., spend the first half of their workday assisting payload controllers with investigations into materials processing of samples and the growth of crystals. The progress of starfish and mussel development in a spaceborne aquarium in the Spacehab module in the Shuttle's cargo bay is seen. The crew then move off in different directions to support work with many of the experiments that make up the fourth mission of the Spacehab pressurized module. Endeavour is about 64 miles away from the Passive Aerodynamically Stabilized Magnetically Damped Satellite-Satellite Test Unit, or PAMS-STU, which was deployed from a canister in the payload bay on day four. Since mission day five coincided with Memorial Day , the crew started the 'Indy 500' from earth orbit.

Source record

Centaur operations at the space station

A study was conducted on the feasibility of using a Centaur vehicle as a testbed to demonstrate critical OTV technologies at the Space Station. Two Technology Demonstration Missions (TDMs) were identified: (1) Accommodations, and (2) Operations. The Accommodations TDM contained: (1) berthing, (2) checkout, maintenance and safing, and (3) payload integration missions. The Operations TDM contained: (1) a cryogenic propellant resupply mission, and (2) Centaur deployment activities. A modified Space Station Co-Orbiting Platform (COP) was selected as the optimum refueling and launch node due to safety and operational considerations. After completion of the TDMs, the fueled Centaur would carry out a mission to actually test deployment and help offset TDM costs. From the Station, the Centaur could carry a single payload in excess of 20,000 pounds to geosynchronous orbit or multiple payloads.

Porter, J.

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is schedule to fly as the secondary payload of a Delta 2 in March, 1993. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. SEDS1 will deploy a 50 lb. instrumented satellite as an end mass using a 20 km tether. Langley Research Center is providing the end mass instrumentation, while the Marshall Space Flight Center is designing and building the deployer. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on the application of a brake, and cut the tether at the proper time after it swings to the local vertical. Also, SEDS1 will collect data which will be used to test the accuracy of tether dynamics models used to stimulate this type of deployment. The experiment will last about 1.5 hours and complete approximately 1.5 orbits. Radar tracking of the Delta II and end mass is planned. In addition, the SEDS1 on-board computer will continuously record, store, and transmit mission data over the Delta II S-band telemetry system. The Data System will count tether windings as the tether unwinds, log the times of each turn and other mission events, monitor tether tension, and record the temperature of system components. A summary of the measurements taken during the SEDS1 are shown. The Data System will also control the tether brake and cutter mechanisms. Preliminary versions of two major sections of the flight software, the data telemetry modules and the data collection modules, were developed and tested under the 1990 NASA/ASEE Summer Faculty Fellowship Program. To facilitate the debugging of these software modules, a prototype SEDS Data System was programmed to simulate turn count signals. During the 1991 summer program, the concept of simulating signals produced by the SEDS electronics systems and circuits was expanded and more precisely defined. During the 1992 summer program, the SEDS signal simulator was programmed to test the requirements of the SEDS Mission software, and this simulator will be used in the formal verification of the SEDS Mission Software. The formal test procedures specification was written which incorporates the use of the signal simulator to test the SEDS Mission Software and which incorporates procedures for testing the other major component of the SEDS software, the Monitor Software.

Pierson, William E.

The Circumstellar Imaging Telescope image motion compensation system - Ultra-precise control on the Space Station platform

The Circumstellar Imaging Telescope (CIT) is a 1.9 m visible wavelength Cassegrain instrument whose primary mission is to locate extra-solar planets by direct imaging. The current reference concept calls for it to be deployed as a Space Station attached payload some time in the late 1990s. Mission and signal processing demands impose the following attitude control requirements: pointing accuracy - 250 nrad RMS, pointing stability - 50 nrad RMS over 30 minutes, roll accuracy - 1 mrad RMS, roll stability 1 mrad RMS over 30 minutes. This paper reports on the results of a recent design study in which it was determined that these requirements can be met on the Space Station by a three tiered control system consisting of a two degree of freedom mechanical gimbal for course pointing, a magnetically suspended roll bearing for roll accommodation, translational isolation and intermediate pointing control, and articulation of the secondary mirror for fine pointing.

Sevaston, G. E.