Distribution system costs associated with the deployment of photovoltaic systems
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
Not provided.
Abstract not provided.
Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs) at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring, Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases, distribution system state estimation (DSSE) and fault identification are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1 feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.
In an effort to better understand the impacts of high penetrations of photovoltaic generators on distribution systems, Arizona Public Service and its partners have begun work on a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale photovoltaics (PV). Building upon the APS Community Power Project --Flagstaff Pilot, this project will analyze the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes as well as large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters are being designed andinstalled to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models will be used to analyze the impacts of the PV on distribution circuit protection systems (including anti-islanding), predict voltage regulation and phase balance issues, and develop volt/var control schemes. This paper continues from a paper presented at the2011 IEEE PVSC conference that introduces the project and describes some of the preliminary consideration, as well as project plans and early results. This paper gives a status update of the project and presents selected results from Phase 2 of the project. It discusses baseline feeder modeling, load allocation, data acquisition, utility-scale PV integration, preliminary model validation, andplans for future phases.
Abstract Not Provided
Abstract not provided.
Explore the source record for details and available documents.
PurposeThe study was designed to assess outcomes of arteriovenous (AV) accesses after interventional stent-graft deployment in haemodialysis patients.Materials and Methods63 haemodialysis patients with 66 AV fistulas and AV grafts were treated by interventional stent-graft deployment from 2006 to 2012 at our hospital. Data of these patients were retrospectively analysed for location of deployed stent-grafts, occurrence and location of (re-)stenosis and (re-)thrombosis. Complex stenosis was the most frequent indication for stent-graft deployment (45.5 %), followed by complications of angioplasty with vessel rupture or dissection (31.8 %).ResultsA high rate of procedural success was achieved (98.5 %). The most frequent location of the deployed stent-graft was the draining vein (66.7 %). Stent-graft deployment was more frequent in AV grafts than in AV fistulas. Primary patency was 45.5 % at 6 month, 31.3 % at 12 month and 19.2 % at 24 month. Primary patency was significantly better for AV fistulas than for AV grafts with deployed stent-grafts. Patency of the deployed stent-graft was much better than overall AV access primary patency with deployed stent-graft. Re-stenosis with thrombosis was the most frequent indication for re-intervention. Most frequent location of re-stenosis was the draining vein (37.1 %), followed by stenosis at the AV access (29.5 %) and the deployed stent-graft (23.5 %).ConclusionRe-stenosis and re-thrombosis remain frequent in AV fistulas and AV grafts in haemodialysis patients despite stent-graft deployment. Re-stenosis of the deployed stent-graft is, only in the minority of the cases, responsible for AV access dysfunction.
Given proper care in siting, design, deployment, operation and maintenance, marine and hydrokinetic technologies could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood, due to a lack of technical certainty. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based approach to the emerging wave and tidal technology sectors in order to evaluate the impact of these technologies on the marine environment and potentially conflicting uses. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios will capture variations in technical approaches and deployment scales to properly identify and characterize environmental impacts and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential effects of these emerging technologies and focus all stakeholders onto the critical issues that need to be addressed. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory and navigational issues. The results of this study are structured into three reports: 1. Wave power scenario description 2. Tidal power scenario description 3. Framework for Identifying Key Environmental Concerns This is the second report in the sequence and describes the results of conceptual feasibility studies of tidal power plants deployed in Tacoma Narrows, Washington. The Narrows contain many of the same competing stakeholder interactions identified at other tidal power sites and serves as a representative case study. Tidal power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize impacts, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informs the process of selecting representative tidal power devices. The selection criteria is that such devices are at an advanced stage of development to reduce technical uncertainties and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. A number of other developers are also at an advanced stage of development including Verdant Power, which has demonstrated an array of turbines in the East River of New York, Clean Current, which has demonstrated a device off Race Rocks, BC, and OpenHydro, which has demonstrated a device at the European Marine Energy Test Center and is on the verge of deploying a larger device in the Bay of Fundy. MCT demonstrated their device both at Devon (UK) and Strangford Narrows (Northern Ireland). Furthermore OpenHydro, CleanCurrent, and MCT are the three devices being installed at the Minas Passage (Canada). Environmental effects will largely scale with the size of tidal power development. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nominally represent (1) a small pilot deployment, (2) an early, small commercial deployment, and (3) a large commercial scale plant. For the three technologies and scales at the selected site, this results in a total of nine deployment scenarios outlined in the report.
Commercial viability of the marine hydrokinetic (MHK) energy industry is contingent on numerous and diverse factors. A major factor is the effects deployed devices have on animals. This factor is multi-faceted since it is dependent on the availability of appropriate scientific approaches to detect these effects. One of the animal groups with overlapping distributions of MHK devices are fishes. As such, individual fish behavior is likely to be influenced by the presence and operation of MHK devices. Depending on the scale of deployment there are implications for changes to essential fish habitat and effects that can be explored during deployment of a single device yet most changes are likely to be realized when multiple devices are deployed over large areas. It is not only important to document these effects and examine the need for mitigation, but also determine whether the methods involved can be used within the economic constraints of this nascent industry. The results presented in this report benefit the MHK industry by providing transferrable environmental monitoring approaches for MHK projects, specifically related to the interactions between static and dynamic tidal turbines and fish. In addition, some of the data can be used to generalize conditions (e.g., the temporal periodicity of fish presence in tidal regions and probability of fish encountering a device) at other MHK sites with similar physical conditions and fish assemblages. Ocean Renewable Power Company, LLC (ORPC) deployed and tested a prototype OCGen® tidal module in Cobscook Bay, Maine, in the summer of 2014. University of Maine researchers proposed an approach to inform other researchers, regulators, and industry members of the effects of this deployment on fish. While the approach was specifically applied to the OCGen® module, results are applicable to other pilot projects and inform future array deployments. Research funded under this grant allowed us to quantify fish presence as well as individual and group-level behavior changes in the presence of the deployed OCGen® module along with a bottom support frame from a previously deployed device (TidGen®). Specific objectives associated with fish behavior changes were (1) continuation of two long-term datasets: (a) stationary down-looking hydroacoustic dataset near an MHK device (group-level) and (b) stationary side-looking hydroacoustics near the bottom-support frame of a previously deployed MHK device (individual-level); (2) application of new processing methods to down-looking hydroacoustic datasets to improve fish species identification (group-level); and (3) development of an encounter probability model using data on fish abundance, vertical distribution, and behavior.
In 2020, a team from the National Renewable Energy Laboratory (NREL) partnered with the East Carolina University Coastal Studies Institute to develop a small, modular, wave-powered point absorber desalination prototype. That prototype, known as the hydraulic and electric reverse osmosis wave energy converter (HERO WEC), was intended to de-risk the installation activities planned for the Waves to Water Prize sponsored by the Water Power Technologies Office. The NREL team was given approximately 18 months to design, build, bench test, and deploy the HERO WEC prototype. Since the initial HERO WEC development, it has been used for two in-lab test programs and three ocean deployments. The first in-lab test program focused on ensuring that the overall operation of the device occurred as expected and on validating the operation of safety systems such as pressure relief valves or electrical breakers for load mitigation. The second in-lab test program was the first time the NREL team leveraged NREL’s large-amplitude motion platform to characterize the performance of the HERO WEC. Of the three in-water deployments, the first deployment was effectively an installation and recovery practice with no meaningful wave activity during the time that it was installed. The second deployment was a 2-week effort that enabled both the electric and hydraulic configurations of the device to be in the water for approximately 5 days each. This deployment was also the first time that the team had the opportunity to perform a drivetrain swap on the Coastal Studies Institute research vessel. The third deployment had to be split into two separate installations due to minor damage incurred from the WEC spinning during the initial installation. This report summarizes the deployments, the challenges encountered with each deployment, and the lessons learned for future work.
Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory issues (Pacific Energy Ventures) and navigational issues (PCCI). The results of this study are structured into three reports: (1) Wave power scenario description (2) Tidal power scenario description (3) Framework for Identifying Key Environmental Concerns This is the first report in the sequence and describes the results of conceptual feasibility studies of wave power plants deployed in Humboldt County, California and Oahu, Hawaii. These two sites contain many of the same competing stakeholder interactions identified at other wave power sites in the U.S. and serve as representative case studies. Wave power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize potential effects, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informed the process of selecting representative wave power devices. The selection criteria requires that devices are at an advanced stage of development to reduce technical uncertainties, and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. Table 1 summarizes the selected wave power technologies. A number of other developers are also at an advanced stage of development, but are not directly mentioned here. Many environmental effects will largely scale with the size of the wave power plant. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nominally represent (1) a small pilot deployment, (2) a small commercial deployment, and (3) a large commercial scale plant. It is important to understand that the purpose of this study was to establish baseline scenarios based on basic device data that was provided to use by the manufacturer for illustrative purposes only.
This analysis represents the biogas-to-electricity pathway under the Renewable Fuel Standard (RFS) as a point of purchase incentive and tests the impact of this incentive on EV deployment using a vehicle consumer choice model. The credit value generated under this policy was calculated in a number of scenarios based on electricity use of each power train choice on a yearly basis over the 15 year vehicle lifetime, accounting for the average electric vehicle miles travelled and vehicle efficiency, competition for biogas-derived electricity among electric vehicles (EVs), the RIN equivalence value and the time value of money. The credit value calculation in each of these scenarios is offered upfront as a point of purchase incentive for EVs using the Market Acceptance of Advanced Automotive Technologies (MA3T) vehicle choice model, which tracks sales, fleet size and energy use over time. The majority of the scenarios use a proposed RIN equivalence value, which increases the credit value as a way to explore the analysis space. Additional model runs show the relative impact of the equivalence value on EV deployment. The MA3T model output shows that a consumer incentive accelerates the deployment of EVs for all scenarios relative to the baseline (no policy) case. In the scenario modeled to represent the current biogas-to-electricity generation capacity (15 TWh/year) with a 5.24kWh/RIN equivalence value, the policy leads to an additional 1.4 million plug-in hybrid electric vehicles (PHEVs) and 3.5 million battery electric vehicles (BEVs) in 2025 beyond the no-policy case of 1.3 million PHEVs and 2.1 million BEVs when the full value of the credit is passed on to the consumer. In 2030, this increases to 2.4 million PHEVs and 7.3 million BEVs beyond the baseline. This larger impact on BEVs relative to PHEVs is due in part to the larger credit that BEVs receive in the model based on the greater percentage of electric vehicle miles traveled by BEVs relative to PHEVs. In this scenario 2025 also represents the last year in which biogas-derived electricity is able to fully supply the transportation electricity demand in the model. After 2025, the credit value declines on a per vehicle basis. At the same time a larger fraction of the credit may shift towards biogas producers in order to incent additional biogas production. The expanded 41 TWh/year biogas availability scenarios represent an increase beyond today s generation capacity and allow greater eRIN generation. With a 5.24kWh/RIN equivalence value, when all of the credit is directed towards reducing vehicle purchase prices, the 41 TWh/year biogas scenario results in 4.1 million additional PHEVs and 12.2 million additional BEVs on the road in 2030 beyond the baseline of 2.5 million PHEVs and 6.1 million BEVs. Under this expanded biogas capacity, biogas-derived electricity generation is able to fully supply electricity for a fleet of over 21 million EVs (15.6 million BEVs and 5.8 million PHEVs) on a yearly basis. In addition to assessing the full value credit scenarios described above, multiple scenarios were analyzed to determine the impact if only a fraction of the credit value was passed on to the consumer. In all of these cases, the EV deployment was scaled back as the fraction of the credit that was passed on to the consumer was reduced. These scenarios can be used to estimate the impact if the credit value is reduced in other ways as well, as demonstrated by the scenarios where the current (22.6 kWh/RIN) equivalence value was used. The EV deployment that results from an equivalence value of 22.6 kWh/RIN equivalence value is roughly equivalent to the EV deployment observed in the 25% case using the 5.24 kWh/RIN equivalence value. A higher equivalence value means that a smaller number of credits, and therefore value, is created for each kWh, and therefore the impact on EV deployment is reduced. This analysis shows several of the drivers that will impact eRIN generation and credit value, and tests the impact of an eRIN point of purchase incentive on EV deployment. This additional incentive can accelerate the deployment of EVs when it is used to reduce vehicle purchase prices. However, the ultimate impact of this policy, as modeled here, will be determined by future RIN prices, the extent to which eRIN credit value can be passed on to the consumer as a point of purchase incentive and the equivalence value.
Pacific Northwest National Laboratory (PNNL) operates two AXYS WindSentinel lidar buoys for the U.S. Department of Energy’s Wind Energy Technologies. The purpose of these buoys is to collect hub-height winds and supporting meteorological and oceanographic information to facilitate the development of offshore wind energy in the U.S. In general, each buoy is deployed for a year or more at a given location in order to capture at least a full annual cycle of weather conditions. The initial deployment for one buoy was off the coast of Virginia beginning in 2015, and the other buoy was first deployed off the coast of New Jersey beginning in 2016. Over the last two years, PNNL has had an opportunity to analyze the data collected during these first two deployments. This report describes a substantial analysis of data collected by the two lidar buoys operated off the coasts of Virginia and New Jersey. The centerpiece instrument for each buoy as deployed off Virginia and New Jersey is a lidar system, which is designed to measure the horizontal wind vector from approximately 40 m to 200 m above the sea surface with vertical resolution of 40 m. Since the initial deployments, the original lidars have been replaced with more powerful Leosphere 866 v2 systems. The analyses in this report will apply to the original Vindicator systems. In addition to the wind profiles from the lidars, the buoys collect near-surface measurements of wind speed and direction, air temperature, relative humidity, barometric pressure, and solar irradiance. Oceanographic variables measured include the two-dimensional wave spectrum, water temperature and conductivity, and ocean current vectors to a depth of 90 m. An assessment of overall data recovery and a basic analysis of the data collected was provided in a previous report This report substantially extends that analysis. The various sections describe the development and application of an inertial measurement unit (IMU) data recovery scheme for the New Jersey deployment; a climatological analysis of winds at hub height and at the surface together with thermodynamic variables measured at the surface for the full deployment periods; an analysis of oceanographic observations describe sea state; the development of a refinement for NOAA’s WaveWatch III model to allow its application to near-shore areas; a basic climatology of ocean currents observed from the buoys; an analysis of observed winds in the framework of Monin-Obukhov Similarity Theory; and the development and evaluation of techniques to extract turbulence intensity and turbulence kinetic energy from the lidars. The analyses contained in this report provide a great deal of new information about offshore conditions on the U.S. East Coast. In addition, the experience gained will inform both configurations and analysis of data from future deployments of these lidar buoy systems.
Remote coastal communities, which could be early adopters of wave energy projects, have concerns over costs, conflicts, and potential risks of development. Designers and developers are challenged to address these community concerns as they continue to develop wave energy technologies. One potential means of reducing costs, conflicts, and risks, especially for demonstration and pilot-scale projects, could be planning a deployment that operates for only a portion of the year—a seasonal deployment. Here, in this paper, we examine the impacts of a seasonal deployment in terms of cost, electricity production, operations and maintenance, environmental impacts, and community benefits. We take a holistic, comparative approach to feasibility that can be replicated for other comparative studies. We estimate electricity production using a point absorber WEC modeled near Sitka, AK, USA and optimized for the given sea conditions. We determine that, for remote community sized projects, seasonal deployments could result in small cost savings (less than 10 %), but larger decreases in annual energy production (around 30 % for our case study area). Seasonal deployments could be preferable in places with seasonal energy needs, if failures and device access become a major hindrance to wave energy technology development, or as a cautionary approach to introducing new technology to the oceans. We also determine that a highly seasonal wave resource is not necessarily a requirement for seasonal deployments to be considered. Seasonal deployments are an alternative to year-round deployments that can be considered in places where marine spatial conflict is a seasonal concern.
Dynamic wireless power transfer (DWPT), or dynamic wireless charging technology, enables charging-while-driving and offers opportunities for eliminating range anxiety, stimulating market penetration of electric vehicles (EVs), and enhancing the sustainability performance of electrified transportation. However, the deployment of wireless charging lanes on highways and urban road networks can be costly and resource-intensive. A life cycle assessment (LCA) is conducted here to compare the sustainability performance of DWPT applied in a network of highways and urban roads for charging electric passenger cars. The assessment compares DWPT to stationary wireless charging and to conventional plug-in charging using a case study of Washtenaw County in Michigan, USA over 20 years. The LCA is based on three key sustainability metrics: costs, greenhouse gas (GHG) emissions, and energy burdens, encompassing not only the use-phase burdens from electricity and fuel, but also the upfront deployment burdens of DWPT infrastructure. A genetic algorithm is applied to optimize the rollout of DWPT infrastructure both spatially and temporally in order to minimize life cycle costs, GHG, and energy burdens: (1) spatial optimization selects road segments to deploy DWPT considering traffic volume, speed, and pavement remaining service life (RSL); (2) temporal optimization determines in which year to deploy DWPT on a particular road segment considering EV market share growth as a function of DWPT coverage rate, future DWPT cost reduction, and charging efficiency improvement. Results indicate that optimal deployment of DWPT electrifying up to about 3% of total roadway lane-miles reduces life cycle GHG emissions and energy by up to 9.0% and 6.8%, respectively, and enables downsizing of the EV battery capacity by up to 48%, compared to the non-DWPT scenarios. Roadside solar panels and storage batteries are essential to significantly reduce life cycle energy and GHG burdens but bring additional costs. Breakeven analysis indicates a breakeven year for solar charging benefits to pay back the DWPT infrastructure burdens can be less than 20 years for GHG and energy burdens but longer than 20 years for costs. A monetization of carbon emissions of at least $250 per metric tonne of CO 2 is required to shift the optimal “pro-cost” deployment to the optimal “pro-GHG” deployment. A roadway segment with volume greater than about 26,000 vehicle counts per day, speed slower than 55 miles per hour (1 mile ≈ 1.609 km), and pavement RSL shorter than 3 years should be given a high priority for early-stage DWPT deployment.