Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

2024 OES-Environmental 2024 State of the Science Report, Chapter 6: Strategies to Aid Consenting Processes for Marine Renewable Energy

While the marine renewable energy (MRE) industry has made positive strides in the past decade, challenges remain that stall forward progress, scaling up, and commercialization. For MRE to provide a viable solution to address the effects of climate change and achieve sustainable development and renewable energy goals, identifying and understanding barriers and opportunities to deployment is key. Barriers to date have included long consenting timelines, costly in-depth baseline data collection and monitoring requirements, and hesitancy in some countries to approve device and array deployments (Copping & Hemery 2020; Kramer et al. 2020). Some of the key drivers behind these barriers are 1) uncertainty about potential effects of MRE on marine animals, habitats, and the environment; 2) lack of familiarity with MRE technologies; or 3) challenges accessing available scientific information (Copping et al. 2020a).

16 TIDAL AND WAVE POWER↗

Logistics simulation of a remediation effort for a hypothetical radiological contamination scenario

To mitigate the effects following a large-scale nuclear or radiological material release in an urban environment and to expedite recovery, the Integrated Wash-Aid Treatment Emergency Reuse System (IWATERS) was developed. IWATERS consists of three operations: washing contaminated surfaces with an ionic wash solution, collecting, and treating the contaminated wash solution on-site to remove contaminants, and reusing the treated solution throughout operations to preserve the clean water resource. This study develops a framework to simulate the logistics of IWATERS deployment, thereby gaining an understanding of the timeline for decontamination operations. For this purpose, the Analysis of Mobility Platform and GoldSim were leveraged for a hypothetical contamination scenario covering 65,200 m 2 of an urban center. The framework reveals that remediation progress is limited by several resources, notably the availability of vermiculite, a reactive clay that is required to treat the contaminated wash solution. Further, this study also presents how the simulation approach can be used to characterize alternatives to reduce the influence of limited resources on operational progress. Overall, this work lays the foundation for evaluating different decontamination methods through detailed logistics simulation, i.e., by refining simulation assumptions and expanding the range of scenarios the simulation can depict.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Roadmap for the Completion of the Design and Implementation of a Remote Canister Monitoring System

The Office of Environmental Management within the Department of Energy is currently investigating technical issues associated with extended dry storage (50+ years) of aluminum spent nuclear fuel. As part of these efforts, a remote canister-monitoring system (RCMS) has been proposed to collect the real-time data of the environmental conditions in the canisters used for the dry storage of aluminum spent nuclear fuel in the CPP-603 facility at Idaho National Laboratory (INL). The proposed RCMS would provide the opportunity to evaluate the appropriate technologies for monitoring, to collect canister environment conditions as soon as possible, to verify and validate current laboratory-based study results and analytic modeling approaches, and to potentially identify additional dry storage options for aluminum spent nuclear fuel at the INL Site. The document provides a brief update on the progress that has been made toward deploying the RCMS and will present at a high level, the general system design philosophy behind the project and the key future tasks necessary for the completion of the RCMS system design, fabrication of the RCMS prototype, testing, and eventual deployment of the RCMS, and a tentative timeline for these tasks.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development and application of an environmental risk register for marine energy device and project developers

The marine energy industry is steadily advancing as more devices are deployed worldwide. However, several challenges and barriers remain, such as lingering uncertainty regarding the potential environmental effects of marine energy devices on marine animals, habitats, and ecosystems. Concerns have led to difficulty navigating permitting and consenting processes and receiving authorization to deploy devices in the marine environment, including extended timelines and costs. Based on existing risk registers, a novel marine energy environmental risk register was created to help the marine energy industry move beyond these barriers. This risk register aims to aid marine energy device and project developers identify and assess potential environmental risks early in device design or project planning, document and track potential environmental interactions, prioritize risks and determine risk responses, and make decisions throughout device or project development. It can also be used as a tool to assist in communicating with regulators and advisors during permitting processes and to inform stakeholder and community engagement efforts. This paper details the methods and process to develop a risk register specific to environmental effects of marine energy and describes two use cases (one for wave energy and another for tidal energy) to highlight example results. Due to the tool's novelty, the paper showcases its application for the marine energy industry and acknowledges limitations and possible future improvements. Overall, the environmental risk register shows promise to support marine energy developers when identifying, tracking, and addressing potential environmental risks and to help successfully navigate permitting and deploy marine energy devices responsibly.

Environmental effects↗

Energy Commissioning Agent/Auditor Online Training Program

The original objective of this project was to create a comprehensive training and deployment program - suitable for in-person delivery in the New York metro region – focused on educating building commissioning authorities and energy auditors. The NJIT Center for Building Knowledge was to have sole responsibility for this curriculum development and deployment plan effort. Very early in the project timeline, however, the scope of the project evolved – with DOE and NETL approval - to become a collaborative effort between NJIT and Portland Energy Conservation, Inc. (PECI). The structure of this collaboration involved PECI taking the lead on developing a comprehensive curriculum program suitable for in-person delivery, and NJIT taking the lead on turning this curriculum into a comprehensive online training program that would complement – and extend the reach of – the in-person curriculum.

Evans, Deane↗

Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Conceptual Framework

This report explores one integrated technical and process concept designed to manage interconnection costs and streamline interconnection timelines to support near-term renewable energy deployment. We describe a new agreement between renewable energy developers and utilities, informed by the technical analysis. The agreement defines the operational parameters for a renewable energy system, with the goal of reducing risk and cost to all parties. This work provides a foundation upon which other states and utilities may build proof of concept. This report is supported by a technical analysis that is detailed in a companion report, "Use of Operating Agreements and Energy Storage to Reduce Photovoltaic Interconnection Costs: Technical and Economic Analysis" (McLaren et al. 2022).

14 SOLAR ENERGY↗

Using Advanced Modeling to Accelerate the Scale-Up of Carbon Capture Technologies

Carbon capture and storage (CCS) is one of many approaches that are critical for significantly reducing domestic and global CO2 emissions. The U.S. Department of Energy’s Clean Coal Technology Program Plan envisions 2nd generation CO2 capture technologies ready for demonstration-scale testing around 2020 with the goal of enabling commercial deployment by 2025 [1]. Third generation technologies have a similarly aggressive timeline. A major challenge is that the development and scale-up of new technologies in the energy sector historically takes up to 15 years to move from the laboratory to pre-deployment and another 20 to 30 years for widespread industrial scale deployment. In order to help meet the goals of the DOE carbon capture program, the Carbon Capture Simulation Initiative (CCSI) was launched in early 2011 to develop, demonstrate, and deploy advanced computational tools and validated multi-scale models to reduce the time required to develop and scale up new carbon capture technologies. The CCSI Toolset (1) enables promising concepts to be more quickly identified through rapid computational screening of processes and devices, (2) reduces the time to design and troubleshoot new devices and processes by using optimization techniques to focus development on the best overall process conditions and by using detailed device-scale models to better understand and improve the internal behavior of complex equipment, and (3) provides quantitative predictions of device and process performance during scale up based on rigorously validated smaller scale simulations that take into account model and parameter uncertainty[2]. This article focuses on essential elements related to the development and validation of multi-scale models in order to help minimize risk and maximize learning as new technologies progress from pilot to demonstration scale.

Miller, David↗

State-Level Comparison of Processes and Timelines for Distributed Photovoltaic Interconnection in the United States

This report presents results from an analysis of distributed photovoltaic (PV) interconnection and deployment processes in the United States. Using data from more than 30,000 residential (up to 10 kilowatts) and small commercial (10-50 kilowatts) PV systems, installed from 2012 to 2014, we assess the range in project completion timelines nationally (across 87 utilities in 16 states) and in five states with active solar markets (Arizona, California, New Jersey, New York, and Colorado).

14 SOLAR ENERGY↗

The Feasibility of Direct CO2 Conversion Technologies on Impacting Mid-Century Climate Goals

Recent IPCC modeling suggests that to limit global warming below 2 degrees C, "unprecedented" reductions in CO2 emissions will be required during the 2030-2050 time frame. The direct conversion of CO2 to fuels and chemicals using renewable electricity has garnered interest as one route to draw down emissions with the ability to synthesize products at a significantly lower carbon footprint than conventional methods. However, most direct CO2 conversion pathways are only in the early stages of development and face technical and market hurdles prior to scale-up, bringing into question what role they may play in influencing global CO2 emissions within this critical two-decade window. In this perspective, we highlight low-temperature electrolysis as a promising technology for direct CO2 conversion, including discussion on the products that could most impact global emission levels, and importantly, offer insight into the timeline, required advancements, and specific technical targets needed to successfully scale and deploy these technologies at the commercial level.

chemicals↗

Learning from the Pandemic: the Future of Meetings in HEP and Beyond

The COVID-19 pandemic has by-and-large prevented in-person meetings since March 2020. While the increasing deployment of effective vaccines around the world is a very positive development, the timeline and pathway to "normality" is uncertain and the "new normal" we will settle into is anyone's guess. Particle physics, like many other scientific fields, has more than a year of experience in holding virtual meetings, workshops, and conferences. A great deal of experimentation and innovation to explore how to execute these meetings effectively has occurred. Therefore, it is an appropriate time to take stock of what we as a community learned from running virtual meetings and discuss possible strategies for the future. Continuing to develop effective strategies for meetings with a virtual component is likely to be important for reducing the carbon footprint of our research activities, while also enabling greater diversity and inclusion for participation. This report summarizes a virtual two-day workshop on Virtual Meetings held May 5-6, 2021 which brought together experts from both inside and outside of high-energy physics to share their experiences and practices with organizing and executing virtual workshops, and to develop possible strategies for future meetings as we begin to emerge from the COVID-19 pandemic. This report outlines some of the practices and tools that have worked well which we hope will serve as a valuable resource for future virtual meeting organizers in all scientific fields.

Neubauer, Mark S.↗

Transportation Energy Futures Series: Vehicle Technology Deployment Pathways: An Examination of Timing and Investment Constraints

Scenarios of new vehicle technology deployment serve various purposes; some will seek to establish plausibility. This report proposes two reality checks for scenarios: (1) implications of manufacturing constraints on timing of vehicle deployment and (2) investment decisions required to bring new vehicle technologies to market. An estimated timeline of 12 to more than 22 years from initial market introduction to saturation is supported by historical examples and based on the product development process. Researchers also consider the series of investment decisions to develop and build the vehicles and their associated fueling infrastructure. A proposed decision tree analysis structure could be used to systematically examine investors' decisions and the potential outcomes, including consideration of cash flow and return on investment. This method requires data or assumptions about capital cost, variable cost, revenue, timing, and probability of success/failure, and would result in a detailed consideration of the value proposition of large investments and long lead times. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transportation Energy Futures Series: Vehicle Technology Deployment Pathways: An Examination of Timing and Investment Constraints

Scenarios of new vehicle technology deployment serve various purposes; some will seek to establish plausibility. This report proposes two reality checks for scenarios: (1) implications of manufacturing constraints on timing of vehicle deployment and (2) investment decisions required to bring new vehicle technologies to market. An estimated timeline of 12 to more than 22 years from initial market introduction to saturation is supported by historical examples and based on the product development process. Researchers also consider the series of investment decisions to develop and build the vehicles and their associated fueling infrastructure. A proposed decision tree analysis structure could be used to systematically examine investors' decisions and the potential outcomes, including consideration of cash flow and return on investment. This method requires data or assumptions about capital cost, variable cost, revenue, timing, and probability of success/failure, and would result in a detailed consideration of the value proposition of large investments and long lead times. This is one of a series of reports produced as a result of the Transportation Energy Futures (TEF) project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for abating GHGs and reducing petroleum dependence related to transportation.

33 ADVANCED PROPULSION SYSTEMS↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

WLCG Transition from X.509 to Tokens. Status, Plans, and Timeline

Since 2017, the Worldwide LHC Computing Grid (WLCG) has been working towards enabling token-based authentication and authorization throughout its entire middleware stack. Following the initial publication of the WLCG Token Schema v1.0 in 2019, OAuth2.0 token workflows have been integrated across grid middleware. There are many complex challenges to be addressed before the WLCG can be end-to-end token-based, including not just technical hurdles but also interoperability with the wider authentication and authorization landscape. This paper presents the status of the WLCG coordination and deployment work, and how it relates to software providers and partner communities. The authors also detail how the WLCG token transition timeline has progressed, and how it has changed since its publication.

97 MATHEMATICS AND COMPUTING↗

Computational Evolutionary Methodology for Knowledge Discovery and Forecasting in Epidemiology and Medicine

Humanity is facing an increasing number of highly virulent and communicable diseases such as avian influenza. Researchers believe that avian influenza has potential to evolve into one of the deadliest pandemics. Combating these diseases requires in-depth knowledge of their epidemiology. An effective methodology for discovering epidemiological knowledge is to utilize a descriptive, evolutionary, ecological model and use bio-simulations to study and analyze it. These types of bio-simulations fall under the category of computational evolutionary methods because the individual entities participating in the simulation are permitted to evolve in a natural manner by reacting to changes in the simulated ecosystem. This work describes the application of the aforementioned methodology to discover epidemiological knowledge about avian influenza using a novel eco-modeling and bio-simulation environment called SEARUMS. The mathematical principles underlying SEARUMS, its design, and the procedure for using SEARUMS are discussed. The bio-simulations and multi-faceted case studies conducted using SEARUMS elucidate its ability to pinpoint timelines, epicenters, and socio-economic impacts of avian influenza. This knowledge is invaluable for proactive deployment of countermeasures in order to minimize negative socioeconomic impacts, combat the disease, and avert a pandemic.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Grid Optimization Competition Challenge 3 Problem Formulation

This report contains the problem formulation for the Grid Optimization (GO) Competition Challenge 3. The Grid Optimization Competition is run by a team of researchers from a number of organizations, including the sponsor Advanced Research Projects Agency - Energy (ARPA-E), lead organization Pacific Northwest National Laboratory (PNNL), and technical contributors from Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), Georgia Institute of Technology (GT), University of Wisconsin (UW), and others. The GO Competition poses challenge problems in the field of power grid management, invites entrants to develop solvers for these problems, invokes the solvers on a set of problem instances using common hardware, ranks the solvers according to their performance, and awards prizes according to the rankings. The overall goal of the GO Competition is to spur innovative research on high impact and computationally challenging problems in power grid management from initial development through commercial deployment. Complete information about the GO Competition can be found online at [2]. The webpage covers previous Challenges, rules, timeline, registration information, data formats, scoring methods, computational platform information, information on supported solvers and languages, sponsor information, frequently asked questions, administrator contact information, publicly available problem instances, computer code for reading and evaluating problem and solution data, a sandbox for testing solvers, and a solver submission interface, results, and publications.

24 POWER TRANSMISSION AND DISTRIBUTION↗