DOE OSTI2019
Dispatchable generation refers to sources of electricity that can be turned on or off, or can adjust their power output accordingly to an order. Geothermal plants are usually used for base-load power rather than dispatchable power. Flexibility is a challenge for a geothermal plant because the heat source does not naturally respond quickly to changes in demand. The current state-of-the-art approach to address this challenge is to maintain the geothermal fluid flows at relatively steady rates while providing a bypass around the generation equipment as needed. Under part load, some of the geothermal fluid is pumped to the surface, bypasses the generation equipment, and is re-injected to the ground without extracting any useful enthalpy. This approach is robust but necessarily incurs high parasitic power draws at part load due to the constant, full-flow pumping power requirements. There are even more challenges and unknowns for steam and flash geothermal plants, which were the focus for this project. As a process improvement to this existing configuration of a dispatchable geothermal plant, we examined the use of a phase-change thermal-energy storage (TES) unit that will provide some “inertia” against temperature fluctuations. The TES phase change material (PCM) could be in the form of eutectic molten nitrate salts, organic sugar alcohols, or the like based on the required temperature. This configuration allowed the power plant to meet the ramp rate requirements while allowing the geothermal resource to drawn down at the duty-cycle-averaged extraction rate rather than the full-rated-output extraction rate. The project team performed an experimental and computational evaluation of a peak shaving technical approach that used thermal storage to switch between two nominal operating points: full rated power and 50% power. In the initial requirements definition phase, the team decided to examine the PCM/TES-enhanced geothermal plant in the context of a 40-MW two-stage flash plant operating in mid-Southern California. Steady-state process simulations were used to understand the equipment sizing and the energetics. Dynamic process simulations were used to understand the response rate of the system to changes in requested power output from the utility. The technical approach was also guided by a techno-economic analysis (TEA) and a high-level analysis of the reservoir. Recognizing that performance of the thermal storage was a key risk element, high-fidelity finite-element simulations of the PCM-TES heat exchanger were performed to better understand its performance and temporal response. These simulations were validated with a subscale PCM-TES experimental apparatus that mimicked the geometry of the full-scale system. The key outcomes of this Phase I project were that: 1) the PCM-TES heat exchanger met the target for gravimetric energy storage density, 2) the dispatchable geothermal plant met its target for response rate, 3) the peak shaving approach reduces the number of production wells and does not disturb the wellfield, and 4) the incentives for properly remunerating dispatchable operation were identified.