Search NASA⌕ Search

SEARCH · Search NASA

Results for “dispatch scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Deep Reinforcement Learning From Demonstrations to Assist Service Restoration in Islanded Microgrids

Microgrids can be operated in island mode during utility grid outages to support service restoration and improve system resilience. To schedule and dispatch distributed energy resources (DERs) in an islanded microgrid, conventional model-based methods rely on accurate distribution network models and lack generalization and adaptability. Data-driven methods are promising for DER coordination but face practical challenges such as potential hazards to microgrids during online training and insufficient online training opportunities due to low outage rates. This paper presents a novel two-stage learning framework that builds on the deep deterministic policy gradient from demonstrations to identify an optimal restoration strategy. At the pre-training stage, imitation learning is applied to equip the control agent with expert experiences to guarantee acceptable initial performance. At the online training stage, action clipping, reward shaping, and expert demonstrations are leveraged to ensure safe exploration while accelerating the training process. In conclusion, the proposed method is illustrated using the IEEE 123-node system and compared with a representative model-based method and the standard deep deterministic policy gradient method to prove solution accuracy and demonstrate increased computational efficiency.

Du, Yan↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Andhra Pradesh [PowerPoint]

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Gujarat

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Karnataka

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Maharashtra

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Rajasthan

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Tamil Nadu

This chapter on Tamil Nadu is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Release a public version of HERON (HERON 2.0) with improved algorithms for the treatment of energy storage

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Holistic Energy Resource Optimization Network (HERON) is a generic software plugin for the Risk Analysis Virtual Environment (RAVEN) to perform stochastic technoeconomic analysis of IES with economic drivers. This report summarizes the updates made to HERON 2.0. Particularly, we demonstrate one of the added features, Function-based Control Mechanics, by comparing a price-based dispatch strategy with the original perfect foresight baselines. Our case studies successfully demonstrate that the model is capable to incorporate artificial control algorithm into the dispatch of IES components. In addition, our results from the price-based strategy indicate that the control strategies of IES components are key to the economic and temporal performance of our model; therefore, more sophisticated dispatch strategies are required to improve the model performance.

25 ENERGY STORAGE↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Two-stage Stochastic Generalized Disjunctive Programming (GDP) Model for Proactive Planning and Reactive Operations of Resilient Power Systems under Disruptions

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Optimization Model and Algorithm for Capacity Planning and Operation of Reliable and Carbon-neutral Power Systems with High Penetration of Renewable Generation

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Concepts for design of an energy management system incorporating dispersed storage and generation

New forms of generation based on renewable resources must be managed as part of existing power systems in order to be utilized with maximum effectiveness. Many of these generators are by their very nature dispersed or small, so that they will be connected to the distribution part of the power system. This situation poses new questions of control and protection, and the intermittent nature of some of the energy sources poses problems of scheduling and dispatch. Under the assumption that the general objectives of energy management will remain unchanged, the impact of dispersed storage and generation on some of the specific functions of power system control and its hardware are discussed.

Kirkham, H.↗

Development and evaluation of a Fault-Tolerant Multiprocessor (FTMP) computer. Volume 2: FTMP software

The software developed for the Fault-Tolerant Multiprocessor (FTMP) is described. The FTMP executive is a timer-interrupt driven dispatcher that schedules iterative tasks which run at 3.125, 12.5, and 25 Hz. Major tasks which run under the executive include system configuration control, flight control, and display. The flight control task includes autopilot and autoland functions for a jet transport aircraft. System Displays include status displays of all hardware elements (processors, memories, I/O ports, buses), failure log displays showing transient and hard faults, and an autopilot display. All software is in a higher order language (AED, an ALGOL derivative). The executive is a fully distributed general purpose executive which automatically balances the load among available processor triads. Provisions for graceful performance degradation under processing overload are an integral part of the scheduling algorithms.

Lala, J. H.↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Decentralized Distribution System Restoration with Grid-Forming/Following Inverter-Based Resources

The high penetration of distributed energy resources (DERs) in active distribution systems has posed challenges to the centralized distribution system restoration (DSR) strategies in current practice. On the other hand, the advancement in smart inverter technologies enables the bottom-up restoration capability. This paper is motivated to develop a 3-layered hierarchical framework for decentralized DSR, based on the grid-forming (GFM) and grid-following (GFL) grid-edge inverters. The first layer presents the tertiary control, which determines the load pickup schedule and generation dispatch of DERs, using the alternating direction method of the multipliers algorithm. The second layer consists of two control functions: GFM control, which regulates voltage and frequency, establishing a stable grid for GFL inverters to follow; and GFL control, which regulates the real and reactive power. In the third layer, the primary control is proposed to regulate the inverter voltage and current, which is developed based on the virtual oscillator control (VOC). Furthermore, the developed framework is tested in the modified IEEE 13-node test feeder. Two scenarios of grid-connected and islanded operating modes are designed, and simulation results demonstrate the effectiveness of decentralized DSR strategies for controlling grid-edge inverters to enhance the distribution system resilience.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lila: Optimal Dispatching in Probabilistic Temporal Networks using Monte Carlo Tree Search

Executing a Probabilistic Simple Temporal Network (PSTN) amounts at scheduling, i.e. \textit{dispatch}, a set of events under time uncertainty. This constitutes a NP-hard online optimization problem. The right execution time must be dynamically assigned to each event of the PSTN such that the temporal constraints are met, whereas activity durations are progressively observed as the execution unfolds. We propose a dispatching algorithm based on Monte Carlo Tree Search, called Lila, with the following characteristics: (i) it is an anytime algorithm, both offline and online, proven asymptotically optimal; (ii) it returns the current probability of success, either before or at any moment during operations; (iii) it handles any possible continuous or discrete, even non-parametric, probability distributions, as well as inter-dependencies between random variables, exogenous and endogenous uncertainty; and (iv) can be easily extended to handle probabilistic external events, PSTNs with resources, PSTNs with cutoff times and precondition chains, etc. Lila is universal in the sense that it can handle any dispatching protocol, simply by specifying it to the algorithm. It has the unlimited flexibility offered by the simulation paradigm, whilst it asymptotically converges to optimal decisions and/or robustness approximations.

Chien, Steve A.↗