Search NASA⌕ Search

SEARCH · Search NASA

Results for “distributive justice”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

U.S. Department of Energy-National Lab Equity Summit: Grid Planning and Operations (Workshop Report)

This report summarizes the U.S. DOE and national laboratories equity summit that was held on February 5, 2024, and focused on grid planning and operations. The objectives of the summit were to connect DOE and lab researchers working on grid-related equity issues, share information on current and planned grid-related equity projects and initiatives, and inspire and educate participants by hearing from our panelists about solutions and challenges to integrating equity in grid planning and operations. The summit included two panels of industry leaders. The first was a state and community perspectives panel that included representatives from a state public utility commission (Oregon Public Utility Commission), a state energy office (Washington Department of Commerce), a state utility consumer advocate (Connecticut Consumer Counsel), and industry consultants (Elevated Engagement and ArkSpring Consulting). Panelists shared successes they have seen, critical challenges related to equity and grid planning and operations, and other considerations. The second panel addressed utility perspectives and included representatives from two utilities (Commonwealth Edison and Tacoma Power), the National Rural Electric Cooperative (NRECA), and a former utility employee and legal consultant. Panelists discussed the role of the utility concerning equity, the most significant technical and data modeling needs and opportunities, and the role the labs could help advance equity in grid planning and operations. There was also a session on partner organization presentations. Argonne National Laboratory made a short presentation on the Grid Modernization Laboratory Consortium (GMLC) project they are leading on equity-informed power system planning. NARUC, NASEO, and the Clean Energy States Alliance, as partners of the GMLC project also shared updates on relevant activities and resources. During the summit, there were two rounds of lightning presentations by national labs and DOE highlighting research that addresses equity and grid planning and operations (Tables 5 and 6 and slides in the Appendix). The goal of the lightning rounds was to share information between participants to encourage collaboration and leverage ongoing research at labs and DOE. The summit included two interactive exercises where summit participants shared their perspectives on relevant equity projects and initiatives (Table 2), key challenges regarding equity and grid planning and operations (Table 3), and promising innovations or progress (Table 4). At the end of the session, participants were asked to share essential insights from the event (Table 7) and an action they plan to take as a result of the event. Participants agreed that the event was useful in helping them share and learn from each other. The project team plans to use the information from the summit as a starting point to help inform future research and technical assistance. In 2026, another Equity Summit will be held (virtually or in person) as part of the same project to help raise awareness and disseminate research and resources completed during the project's duration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PR100 Final Results

This presentation includes a summary of the final results from the Puerto Rico Grid Resilience and Transition to 100% Renewable Energy Study (PR100). Led by the U.S. Department of Energy's Grid Deployment Office and the National Renewable Energy Laboratory, and funded by the Federal Emergency Management Agency, the PR100 Study was a two-year effort resulting in stakeholder-driven pathways for Puerto Rico to meet its clean energy goals. For Spanish version see https://www.nrel.gov/docs/fy24osti/88975.pdf.

100% renewable energy target↗

Presentacion del Webinar Publico sobre Resultados Finales del Estudio PR100

Esta presentacion incluye un resumen de los resultados finales del Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transiciones a Energia 100% Renovable (PR100). Dirigido por el Departamento de Energia y el Laboratorio Nacional de Energias Renovables, y financiado por la Agencia Federal para el Manejo de Emergencias, el estudio PR100 fue un esfuerzo de dos anos que ha resultado en caminos impulsados por las partes interesadas para que Puerto Rico alcance sus metas de energia limpia. For the English version of this presentation, see NREL/PR-6A20-88773 (https://www.nrel.gov/docs/fy24osti/88773.pdf).

100% renewable energy target↗

Agent-Based Model of Combined Community- and Jail-Based Take-Home Naloxone Distribution

Importance Opioid-related overdose accounts for almost 80 000 deaths annually across the US. People who use drugs leaving jails are at particularly high risk for opioid-related overdose and may benefit from take-home naloxone (THN) distribution. Objective To estimate the population impact of THN distribution at jail release to reverse opioid-related overdose among people with opioid use disorders. Design, Setting, and Participants This study developed the agent-based Justice-Community Circulation Model (JCCM) to model a synthetic population of individuals with and without a history of opioid use. Epidemiological data from 2014 to 2020 for Cook County, Illinois, were used to identify parameters pertinent to the synthetic population. Twenty-seven experimental scenarios were examined to capture diverse strategies of THN distribution and use. Sensitivity analysis was performed to identify critical mediating and moderating variables associated with population impact and a proxy metric for cost-effectiveness (ie, the direct costs of THN kits distributed per death averted). Data were analyzed between February 2022 and March 2024. Intervention Modeled interventions included 3 THN distribution channels: community facilities and practitioners; jail, at release; and social network or peers of persons released from jail. Main Outcomes and Measures The primary outcome was the percentage of opioid-related overdose deaths averted with THN in the modeled population relative to a baseline scenario with no intervention. Results Take-home naloxone distribution at jail release had the highest median (IQR) percentage of averted deaths at 11.70% (6.57%-15.75%). The probability of bystander presence at an opioid overdose showed the greatest proportional contribution (27.15%) to the variance in deaths averted in persons released from jail. The estimated costs of distributed THN kits were less than $\$$15 000 per averted death in all 27 scenarios. Conclusions and Relevance This study found that THN distribution at jail release is an economical and feasible approach to substantially reducing opioid-related overdose mortality. Training and preparation of proficient and willing bystanders are central factors in reaching the full potential of this intervention.

Tatara, Eric [Argonne National Laboratory (ANL), A↗

Multidimensional and multitemporal energy injustices: Exploring the downstream impacts of the Belo Monte hydropower dam in the Amazon

Energy transition technologies, such as hydroelectric dams, have been seen as symbols of progress, modernity, cheap energy, environmental sustainability, and resource abundance, leading to overestimating their benefits and underestimating their drawbacks. In this study, we use the tenets approach of energy justice and a qualitative case study to explore, from a multidimensional and multitemporal perspective, the impacts faced by the inhabitants of a community located downstream from the Belo Monte hydroelectric dam. Through in-depth interviews and observations, data were collected at three points: during the late stage of construction (2016) and early operation (2017, 2019). Furthermore, we found that individuals face multiple and diverse energy injustices at various stages of the dam construction, and its severity changes over time. For instance, distributional issues were more predominant at the beginning of data collection since fisheries, their main livelihood activity was impacted by dam construction. Then, other justice issues, such as capabilities, emerged in the last years of data collection.

13 HYDRO ENERGY↗

Incorporating energy justice into utility-scale photovoltaic deployment: A policy framework

Utility-scale photovoltaic (PV) installations made up 77 GW (6%) of installed capacity in the United States, as of the end of 2021. This will grow to more than 500 GW by 2050 under a mid-case projection or more than 800 GW if solar costs decline more rapidly. While utility-scale PV is projected to grow rapidly, to date, unlike energy efficiency or distributed PV, utility-scale PV has not been used to provide substantial financial benefits to underserved communities, either through ownership, financing of assets, or direct electricity bill reduction. We assess two mechanisms through which utility-scale PV could benefit underserved communities. We find that while a framework for direct electricity bill reduction can be meaningful to customers, this mechanism falls short of providing restorative justice via wealth creation for minority-owned businesses. In contrast, we find that a framework for procurement of utility-scale PV by public and private entities from PV projects that are financed, owned, and/or developed by minority-owned businesses can provide this restorative justice benefit, and thereby facilitate an equitable energy transition. We conclude with concrete recommendations for new policies and programs to ensure that the benefits of utility-scale PV systems are distributed to underserved communities.

14 SOLAR ENERGY↗

Guidance for Integrating Energy Justice and Equity in Building Technology Deployment Programs: Tracking, Reporting, and Maximizing the Flow of Benefits from Building System Technology Deployment Activities to Disadvantaged Communities and Target Sectors

The Federal Justice40 Initiative directs at least 40% of the overall benefits of certain clean energy investments to flow to disadvantaged communities and requires that all federal programs covered by Justice40 consult stakeholders to determine the program benefits, and that the flow of benefits to disadvantaged communities is tracked and reported. Unequal distribution of benefits, in terms of access to clean energy research, design, development, and deployment, can disproportionately benefit or burden certain communities. This can result in higher rates of pollution, negative health effects, and increased energy burdens and insecurities in disadvantaged communities. Programs focused on decarbonizing the built environment can enhance health, quality of life, and economic opportunities for impacted communities. This guidance document, developed by Pacific Northwest National Laboratory and funded by the U.S. Department of Energy’s Building Technologies Office, provides best practices and approaches for incorporating energy justice and equity principles into building technology deployment activities. It provides best practices and recommendations for communicating with and involving disadvantaged communities and target building sectors in program activities, along with methods to monitor and report the distribution of benefits to these sectors. This document lays out a set of strategies, metrics, and best practices that can be implemented over time to apply energy justice and equity approaches, whether the program is just starting out or ongoing. Although this guidance was designed for Building Technologies Office technology deployment programs, the best practices, recommendations, and methods can be valuable to any program concerned with the equitable deployment of clean energy technologies. The goal of this project is to enable the equitable development, deployment, and adoption of clean energy technologies and practices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100): Six-Month Progress Update [Slides]

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phase-out of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040, as established in Puerto Rico Energy Public Policy Act (Act 17). Since hurricanes Irma and Maria in September 2017, DOE and its national laboratories have provided Puerto Rico energy system stakeholders with tools, training, and modeling support to enable planning and operation of the electric power grid with more resilience against further disruptions. On February 2, 2022, DOE, FEMA, and six national laboratories launched the two-year Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) to conduct comprehensive analysis of stakeholder-driven pathways to Puerto Rico's energy future. The robust and objective energy analysis entails five activities, with an emphasis on power system reliability, resilience, and generation planning. This presentation provides a six-month progress update on the study, including presentation of four initial scenario frameworks defined with extensive stakeholder input.

14 SOLAR ENERGY↗

MOD-Plan: Multi-Objective Decision Planning Framework for Electric Grid Resilience, Equity, and Decarbonization [Slides]

Traditionally electric grid planning strives to maintain safe, reliable, efficient, and affordable service for current and future customers. As policies, social preferences, and the threat landscape evolve, additional considerations for power system planners are emerging, including decarbonization, resilience, and energy equity and justice. The MOD-Plan framework leverages and extends prior work to provide a framework for integrating incorporating resilience, equity, and decarbonization into integrated distribution system planning.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transicion a Energia 100% Renovable (PR100): Actualizacion de Progreso de Seis Meses [Slides]

Puerto Rico se ha comprometido a satisfacer sus necesidades de electricidad con un 100% de energia renovable para 2050, junto con el cumplimiento de objetivos intermedios del 40% para 2025, el 60% para 2040, la eliminacion gradual de la generacion a base de carbon para 2028, y una mejora del 30% en la eficiencia energetica para 2040, segun lo establecido en la Ley de Politica Publica Energetica de Puerto Rico (Ley 17). Desde los huracanes Irma y Maria en septiembre de 2017, DOE y sus laboratorios nacionales han proporcionado a las partes interesadas del sistema energetico de Puerto Rico herramientas, adiestramiento y apoyo de modelaje para permitir la planificacion y el funcionamiento de la red electrica con mas resiliencia frente a nuevas interrupciones. El 2 de febrero de 2022, DOE, FEMA y seis laboratorios nacionales lanzaron el Estudio de Resiliencia de la Red Electrica de Puerto Rico y Transicion a la Energia 100% Renovable (PR100), de dos anos de duracion, para llevar a cabo un analisis exhaustivo de las vias impulsadas por las partes interesadas para el futuro energetico de Puerto Rico. El analisis energetico, solido y objetivo, comprende cinco actividades, con enfasis en la confiabilidad del sistema electrico, la resiliencia y la planificacion de la generacion. Esta presentacion provee una actualizacion de progreso del trabajo de seis meses sobre el Estudio, incluyendo la presentacion de cuatro escenarios iniciales definidos mediante un rol activo de las partes interesadas. This is the Spanish translation of NREL/PR-6A20-83432.

14 SOLAR ENERGY↗

Scaling Equitable Finance

Driven by dramatic declines in up-front cost, the U.S. solar photovoltaics (PV) industry has taken off over the past decade, growing from 1 gigawatt of installed capacity in 2009 to 89 gigawatts in 2020—or enough capacity to power roughly 19 million homes. The industry is expected to double in size over just the next 5 years.1 Much of the growth has been driven by large, utility-scale projects that can produce 5 mega- watts or more of power—enough to power at least 1,000 homes. The cost of electricity produced by these projects has decreased by more than 70 percent since 2010. As of Q3 2020, development costs of large, util- ity-scale solar PV power plants were under $1 per watt, down by more than 70 percent from 2010.2 A robust array of investors has come forward to efficiently deliver capital to these kinds of utility-scale projects including large banks, insurance companies, pension funds, and others. But low- and moderate-income communities, including communities of color, are at risk of being left behind in the transition to clean energy. Mission- driven solar project developers and financial institu- tions have been working alongside energy justice advocates to open up solar access for these communi- ties, using strategies ranging from community solar, to solar installations on affordable multifamily housing, to distributed solar and storage programs, and more. Their goals go beyond simply generating more green energy to advancing social equity by: • empowering communities to control their energy future • stabilizing energy prices, saving money, and build- ing wealth for low-income families • creating quality jobs • improving health by reducing pollution • providing energy resilience for vulnerable communities Mission-driven actors are successfully deploying a wide variety of strategies to meet these goals, from helping low-income homeowners get solar—and some- times battery storage, to developing solar projects serv- ing affordable rental housing and community facilities, to building larger “shared solar” projects to which households from across the community can subscribe. However, the financing ecosystem does not work nearly as well for these “mission driven” solar proj- ects as it does for utility-scale projects. For home rooftop solar, even if low-income consumers have a home and suitable roof, they may fail to qualify for federal tax incentives, lack adequate credit to qualify for a loan—or the mission-driven lenders seeking to serve them may not be adequately capitalized to make long-term loans. For mission-driven commercial or community-scale projects, assembling nearly every component of the project capital stack—whether bridging early-stage costs, attracting tax credit equity investors, securing long-term debt, or coming up with sponsor equity and filling gaps—can present challenges. A variety of obstacles contribute to the scarcity of financing for low-income solar, including small project sizes, lack of developer balance sheet capacity, both real and perceived issues with credit risk, elevated technical assistance needs, and greater subsidy requirements to pursue goals such as deep energy affordability, climate resilience, or job creation. Still other obstacles are regulatory: for example, not all states allow community solar projects or Power Purchase Agreements, common strategies used for providing low-income solar—and the potential for regulations to shift over time creates risks that mission-driven projects can ill afford. This report synthesizes information garnered from 47 key informant interviews, four focus group discus- sions involving 60 stakeholders, and a review of the substantial existing literature on low-income solar finance to assess the current landscape of mission- driven solar development in the United States, examine the roles that community-based financial institutions could play, and recommend public invest- ments and policy changes that could help to scale the provision of equitable solar finance. Key recommen- dations for policymakers and funders in the renew- able energy and community development fields that emerge from this process include the following: • Help to capitalize and support community-based lenders to provide flexible, low-cost, and long- term financing to mission-driven solar projects— including providing guarantees or other forms of credit enhancement. • Provide federal support for equitable solar, including a grant-in-lieu-of-credits option for the Investment Tax Credit to improve access to this critical government subsidy. • Develop pools of government and philanthropic support that can complement financing from community-based lenders to complete the capi- tal stack for mission-driven projects, as well as to support education and technical assistance to both consumers and potential project sponsors. • Create a national Renewable Energy Credits pro- gram that includes social equity targets to provide a baseline of support for clean energy generation. • Change utility regulations to remove barriers to low-income solar projects; lower permitting costs; provide greater certainty for developers, consumers and owners; and measure progress toward equity in renewable energy policy implementation.

14 SOLAR ENERGY↗

The Los Angeles 100% Renewable Energy Study (LA100): Chapter 7. Distribution System Analysis

The City of Los Angeles has set ambitious goals to transform its electricity supply, aiming to achieve a 100% renewable energy power system by 2045, along with aggressive electrification targets for buildings and vehicles. To reach these goals, and assess the implications for jobs, electricity rates, the environment, and environmental justice, the Los Angeles City Council passed a series of motions directing the Los Angeles Department of Water and Power (LADWP) to determine the technical feasibility and investment pathways of a 100% renewable energy portfolio standard. The Los Angeles 100% Renewable Energy Study (LA100) is a first-of-its-kind objective, rigorous, and science-based power systems analysis to determine what investments could be made to achieve these goals. The LA100 final report is presented as a collection of 12 chapters and an executive summary, each of which is available as an individual download. This chapter summarizes the growth in distribution-connected energy resources and provides a detailed review of impacts to the distribution grid of growth in customer electricity demand, solar, and storage, as well as required distribution grid upgrades and associated costs.

100% Renewable↗

A Supply Chain Road Map for Offshore Wind Energy in the United States

"A Supply Chain Road Map for Offshore Wind Energy in the United States" identifies pathways to developing a domestic offshore wind supply chain that can manufacture and deploy the major components needed to set the United States on a pathway to installing 30 GW of offshore wind by 2030 and 110 GW by 2050. The report estimates that this supply chain could require an investment of at least $\$$22.7 billion this decade to meet an annual demand for components, ports, and vessels in 2030. Although this is a considerable investment, it could allow the industry to install around $\$$100 billion worth of offshore wind this decade by reducing risk of delays due to global supply chain bottlenecks and creating a robust network of assets that will continue to be effective well beyond 2030. The United States would need at least 34 manufacturing facilities employing 10,000 workers, 39,000 jobs in the supporting supply chain, 10 marshaling ports, 4-6 dedicated wind turbine installation vessels, 4-6 dedicated heavy-lift vessels, and 4-8 U.S.-flagged specialized feeder barges to come online this decade to support an average annual deployment of 4-6 gigawatts offshore wind capacity per year. This supply chain could be developed in 6-9 years, but would require near-term decision making and efficient permitting and planning to strategically develop these resources by 2030. Additional investment and expansion would be required in the 2030s as the sector expands into new regions (such as the Gulf of Mexico) and new technologies (such as larger wind turbines and floating wind energy projects). Furthermore, the planning process needs to meaningfully engage with communities that will be impacted by supply chain expansion to achieve just outcomes and maximize benefits to these stakeholders, which will result in a more equitable and sustainable supply chain. While U.S. offshore wind has made significant progress in recent years, remaining supply chain challenges include uncertainty surrounding deployment and procurement timelines; a lack of port and vessel infrastructure; and limitations in the available workforce, supporting supplier networks, and energy justice best practices. However, many of these problems can be addressed through improved communication between key stakeholder groups, support from federal and state governments, and forward-thinking designs of supply chain assets to accommodate future technology changes for fixed-bottom and floating offshore wind. Although it is a significant task, developing these domestic capabilities represents a once-in-a-generation opportunity to contribute to a decarbonized energy future and also create massive economic benefits that are distributed throughout the country.

17 WIND ENERGY↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimizing equity in energy policy interventions: A quantitative decision-support framework for energy justice

This paper presents a quantitative framework to support policy decision-making around equitable energy interventions. By combining sociodemographic and techno-economic models in the energy space, we propose a linear programming model to calculate the optimal portfolio of energy investments that explicitly minimizes the energy burden of a given population of energy insecure households. The model is formulated as a multi-objective optimization suitable to support the decisions on weatherization and deployment of distributed energy resources. We illustrate our methodology with a case study involving a population of 14,043 energy insecure households in Wayne County, Detroit, United States.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PR100 One-Year Progress Summary Report: Preliminary Modeling Results and High-Resolution Solar and Wind Data Sets

The Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy Study (PR100) is a 2-year study by the U.S. Department of Energy's (DOE's) Grid Deployment Office and six national laboratories to comprehensively analyze stakeholder-driven pathways to Puerto Rico's clean energy future. In Year 1 of the study, the PR100 team rigorously modeled and analyzed scenarios that meet Puerto Rico's renewable energy targets and achieve short-term recovery goals and long-term energy resilience. This report, which summarizes PR100 progress in Year 1, provides considerations that can inform potential funding and implementation decisions by key federal and local agencies and stakeholders. The summary report follows the publication in July 2022 of a PR100 Six-Month Progress Update (in English and Spanish), as well as public webinars in February 2022 to kick off the study and in July 2022 to present the 6-month update. A final written report and web-based visuals will be published in late 2023. All publications and public events associated with the study will be available in Spanish and English. This report is also available in Spanish https://www.nrel.gov/docs/fy23osti/85144.pdf.

100%↗

Designing the PR100 Study: Puerto Rico Grid Resilience and Transition to 100% Renewable Energy

Puerto Rico has committed to meeting its electricity needs with 100% renewable energy by 2050, along with realizing interim goals of 40% by 2025, 60% by 2040, the phaseout of coal-fired generation by 2028, and a 30% improvement in energy efficiency by 2040 as established in Act 17. [1] To meet these goals and support widespread end-use electrification, the territory must explore how renewable energy and other generation technologies can be developed with energy storage, distributed generation, distribution control, electric vehicles, and energy efficient and responsive loads in each of Puerto Rico's cities and communities. To support Puerto Rico in reaching its renewable energy goals; help ensure energy system resilience against future extreme weather events; improve energy justice; and provide inputs to LUMA Energy's walk, jog, and run approach in its coordinated planning roadmap, the U.S. Department of Energy, National Renewable Energy Laboratory, Argonne National Laboratory, Lawrence Berkeley National Laboratory, Oak Ridge National Laboratory, Pacific Northwest National Laboratory and Sandia National Laboratories propose to evaluate 100% renewable energy pathways through an integrated analysis process. This talk will present steps in designing a two-year study entitled Puerto Rico Grid Resilience and Transitions to 100% Renewable Energy (PR100). [1] U.S. Energy Information Administration (EIA). 2020. Puerto Rico Territory Energy Profile.

100% renewable energy↗