Search NASA⌕ Search

SEARCH · Search NASA

Results for “dynamic scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Expert system for on-board satellite scheduling and control

An Expert System is described which Rockwell Satellite and Space Electronics Division (S&SED) is developing to dynamically schedule the allocation of on-board satellite resources and activities. This expert system is the Satellite Controller. The resources to be scheduled include power, propellant and recording tape. The activities controlled include scheduling satellite functions such as sensor checkout and operation. The scheduling of these resources and activities is presently a labor intensive and time consuming ground operations task. Developing a schedule requires extensive knowledge of the system and subsystems operations, operational constraints, and satellite design and configuration. This scheduling process requires highly trained experts anywhere from several hours to several weeks to accomplish. The process is done through brute force, that is examining cryptic mnemonic data off line to interpret the health and status of the satellite. Then schedules are formulated either as the result of practical operator experience or heuristics - that is rules of thumb. Orbital operations must become more productive in the future to reduce life cycle costs and decrease dependence on ground control. This reduction is required to increase autonomy and survivability of future systems. The design of future satellites require that the scheduling function be transferred from ground to on board systems.

Barry, John M.↗

An Adaptive Memory Interface Controller for Improving Bandwidth Utilization of Hybrid and Reconfigurable Systems

Emerging applications such as data mining, bioinformatics, knowledge discovery, social network analysis are irregular. They use data structures based on pointers or linked lists, such as graphs, unbalanced trees or unstructures grids, which generates unpredictable memory accesses. These data structures usually are large, but difficult to partition. These applications mostly are memory bandwidth bounded and have high synchronization intensity. However, they also have large amounts of inherent dynamic parallelism, because they potentially perform a task for each one of the element they are exploring. Several efforts are looking at accelerating these applications on hybrid architectures, which integrate general purpose processors with reconfigurable devices. Some solutions, which demonstrated significant speedups, include custom-hand tuned accelerators or even full processor architectures on the reconfigurable logic. In this paper we present an approach for the automatic synthesis of accelerators from C, targeted at irregular applications. In contrast to typical High Level Synthesis paradigms, which construct a centralized Finite State Machine, our approach generates dynamically scheduled hardware components. While parallelism exploitation in typical HLS-generated accelerators is usually bound within a single execution flow, our solution allows concurrently running multiple execution flow, thus also exploiting the coarser grain task parallelism of irregular applications. Our approach supports multiple, multi-ported and distributed memories, and atomic memory operations. Its main objective is parallelizing as many memory operations as possible, independently from their execution time, to maximize the memory bandwidth utilization. This significantly differs from current HLS flows, which usually consider a single memory port and require precise scheduling of memory operations. A key innovation of our approach is the generation of a memory interface controller, which dynamically maps concurrent memory accesses to multiple ports. We present a case study on a typical irregular kernel, Graph Breadth First search (BFS), exploring different tradeoffs in terms of parallelism and number of memories.

BFS↗

IRIS-GNN: Leveraging Graph Neural Networks for Scheduling on Truly Heterogeneous Runtime Systems

The diversity of accelerators in computer systems poses significant challenges for software developers, such as managing vendor-specific compiler toolchains, code fragmentation requiring different kernel implementations, and performance portability issues. To address these, the Intelligent Runtime System (IRIS) was developed. IRIS works across various systems, from smartphones to supercomputers, enabling automatic performance scaling based on available accelerators. It introduces abstract tasks for seamless execution transitions between accelerators while ensuring memory consistency and task dependencies. Although IRIS simplifies system details, optimal dynamic scheduling still requires user input to understand workload structures. To address this, we introduce a new scheduling policy for IRIS, termed IRIS-GNN, which is the first IRIS hybrid policy that operates in conjunction with the dynamic policies. This policy employs a Graph-Neural Network (GNN) to conduct Graph Classification of any task graphs submitted to IRIS. This GNN analyzes the structure and attributes of the task graph, categorizing it as either locality, concurrency, or mixed. This classification subsequently guides the selection of the dynamic policy used by IRIS. We provide a comparison of the performance of IRIS-GNN against the complete spectrum of IRIS’s dynamic policies, assess the overhead introduced by the GNN within this scheduling framework, and ultimately explore its practical application in real-world scenarios.

Johnston, Beau↗

An Asynchronous Task-based Fan-Both Sparse Cholesky Solver

Systems of linear equations arise at the heart of many scientific and engineering applications. Many of these linear systems are sparse; i.e., most of the elements in the coefficient matrix are zero. Direct methods based on matrix factorizations are sometimes needed to ensure accurate solutions. For example, accurate solution of sparse linear systems is needed in shift-invert Lanczos to compute interior eigenvalues. The performance and resource usage of sparse matrix factorizations are critical to time-to-solution and maximum problem size solvable on a given platform. In many applications, the coefficient matrices are symmetric, and exploiting symmetry will reduce both the amount of work and storage cost required for factorization. When the factorization is performed on large-scale distributed memory platforms, communication cost is critical to the performance of the algorithm. At the same time, network topologies have become increasingly complex, so that modern platforms exhibit a high level of performance variability. This makes scheduling of computations an intricate and performance-critical task. In this paper, we investigate the use of an asynchronous task paradigm, one-sided communication and dynamic scheduling in implementing sparse Cholesky factorization (symPACK) on large-scale distributed memory platforms. Our solver symPACK relies on efficient and flexible communication primitives provided by the UPC++ library. Performance evaluation shows good scalability and that symPACK outperforms state-of-the-art parallel distributed memory factorization packages, validating our approach on practical cases.

Jacquelin, Mathias↗

Co-optimization of repairs and dynamic network reconfiguration for improved distribution system resilience

In this work, a post-disaster distribution system repair and restoration (DSRR) strategy is proposed to improve distribution system resilience. The DSRR strategy is formulated as a two-stage optimization. The first stage is a comprehensive co-optimization of repair crew scheduling, dynamic network reconfiguration, and distributed energy resource (DER) dispatch based on the forecast load profile. The goal is to minimize the accumulative operating cost caused by the load reduction payment as well as DER operating cost. In particular, since the number of available repair crews is usually smaller than the number of faulted lines after a disaster event, the DSRR strategy determines the optimal scheduling for repairing faulted lines. The second stage is a re-dispatch of the DER power output and load shedding based on the real-time load demand of each bus. The proposed algorithm is validated by case studies of the IEEE 33-bus and 123-bus test systems. We consider those scenarios in which faults occur in multiple heavy-loaded feeders. The simulation results demonstrate that the DSRR strategy effectively coordinate the repair scheduling, network reconfiguration and load shedding to minimize the operating cost.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Method for resource control in parallel environments using program organization and run-time support

A system and method for dynamic scheduling and allocation of resources to parallel applications during the course of their execution. By establishing well-defined interactions between an executing job and the parallel system, the system and method support dynamic reconfiguration of processor partitions, dynamic distribution and redistribution of data, communication among cooperating applications, and various other monitoring actions. The interactions occur only at specific points in the execution of the program where the aforementioned operations can be performed efficiently.

Ekanadham, Kattamuri↗

Method for resource control in parallel environments using program organization and run-time support

A system and method for dynamic scheduling and allocation of resources to parallel applications during the course of their execution. By establishing well-defined interactions between an executing job and the parallel system, the system and method support dynamic reconfiguration of processor partitions, dynamic distribution and redistribution of data, communication among cooperating applications, and various other monitoring actions. The interactions occur only at specific points in the execution of the program where the aforementioned operations can be performed efficiently.

Ekanadham, Kattamuri↗

Efficient mapping algorithms for scheduling robot inverse dynamics computation on a multiprocessor system

Two efficient mapping algorithms for scheduling the robot inverse dynamics computation consisting of m computational modules with precedence relationship to be executed on a multiprocessor system consisting of p identical homogeneous processors with processor and communication costs to achieve minimum computation time are presented. An objective function is defined in terms of the sum of the processor finishing time and the interprocessor communication time. The minimax optimization is performed on the objective function to obtain the best mapping. This mapping problem can be formulated as a combination of the graph partitioning and the scheduling problems; both have been known to be NP-complete. Thus, to speed up the searching for a solution, two heuristic algorithms were proposed to obtain fast but suboptimal mapping solutions. The first algorithm utilizes the level and the communication intensity of the task modules to construct an ordered priority list of ready modules and the module assignment is performed by a weighted bipartite matching algorithm. For a near-optimal mapping solution, the problem can be solved by the heuristic algorithm with simulated annealing. These proposed optimization algorithms can solve various large-scale problems within a reasonable time. Computer simulations were performed to evaluate and verify the performance and the validity of the proposed mapping algorithms. Finally, experiments for computing the inverse dynamics of a six-jointed PUMA-like manipulator based on the Newton-Euler dynamic equations were implemented on an NCUBE/ten hypercube computer to verify the proposed mapping algorithms. Computer simulation and experimental results are compared and discussed.

Lee, C. S. G.↗

Fault-tolerant dynamic task graph scheduling

In this paper, we present an approach to fault tolerant execution of dynamic task graphs scheduled using work stealing. In particular, we focus on selective and localized recovery of tasks in the presence of soft faults. We elicit from the user the basic task graph structure in terms of successor and predecessor relationships. The work stealing-based algorithm to schedule such a task graph is augmented to enable recovery when the data and meta-data associated with a task get corrupted. We use this redundancy, and the knowledge of the task graph structure, to selectively recover from faults with low space and time overheads. We show that the fault tolerant design retains the essential properties of the underlying work stealing-based task scheduling algorithm, and that the fault tolerant execution is asymptotically optimal when task re-execution is taken into account. Experimental evaluation demonstrates the low cost of recovery under various fault scenarios.

fault tolerance↗

Resource constrained design of artificial neural networks using comparator neural network

We present a systematic design method executed under resource constraints for automating the design of artificial neural networks using the back error propagation algorithm. Our system aims at finding the best possible configuration for solving the given application with proper tradeoff between the training time and the network complexity. The design of such a system is hampered by three related problems. First, there are infinitely many possible network configurations, each may take an exceedingly long time to train; hence, it is impossible to enumerate and train all of them to completion within fixed time, space, and resource constraints. Second, expert knowledge on predicting good network configurations is heuristic in nature and is application dependent, rendering it difficult to characterize fully in the design process. A learning procedure that refines this knowledge based on examples on training neural networks for various applications is, therefore, essential. Third, the objective of the network to be designed is ill-defined, as it is based on a subjective tradeoff between the training time and the network cost. A design process that proposes alternate configurations under different cost-performance tradeoff is important. We have developed a Design System which schedules the available time, divided into quanta, for testing alternative network configurations. Its goal is to select/generate and test alternative network configurations in each quantum, and find the best network when time is expended. Since time is limited, a dynamic schedule that determines the network configuration to be tested in each quantum is developed. The schedule is based on relative comparison of predicted training times of alternative network configurations using comparator network paradigm. The comparator network has been trained to compare training times for a large variety of traces of TSSE-versus-time collected during back-propagation learning of various applications.

Wah, Benjamin W.↗

Elastic distributed training with fast convergence and efficient resource utilization

Distributed learning is now routinely conducted on cloud as well as dedicated clusters. Training with elastic resources brings new challenges and design choices. Prior studies focus on runtime performance and assume a static algorithmic behavior. In this work, by analyzing the impact of of resource scaling on convergence, we introduce schedules for synchronous stochastic gradient descent that proactively adapt the number of learners to reduce training time and improve convergence. Our approach no longer assumes a constant number of processors throughout training. In our experiment, distributed stochastic gradient descent with dynamic schedules and reduction momentum achieves better convergence and significant speedups over prior static ones. Numerous distributed training jobs running on cloud may benefit from our approach.

Cong, Guojing↗

User-Assisted Store Recycling for Dynamic Task Graph Schedulers

The emergence of the multi-core era has led to increased interest in designing effective yet practical parallel programming models. Models based on task graphs that operate on single-assignment data are attractive in several ways: they can support dynamic applications and precisely represent the available concurrency. However, they also require nuanced algorithms for scheduling and memory management for efficient execution. In this paper, we consider memory-efficient dynamic scheduling of task graphs. Specifically, we present a novel approach for dynamically recycling the memory locations assigned to data items as they are produced by tasks. We develop algorithms to identify memory-efficient store recycling functions by systematically evaluating the validity of a set of (user-provided or automatically generated) alternatives. Because recycling function can be input data-dependent, we have also developed support for continued correct execution of a task graph in the presence of a potentially incorrect store recycling function. Experimental evaluation demonstrates that our approach to automatic store recycling incurs little to no overheads, achieves memory usage comparable to the best manually derived solutions, often produces recycling functions valid across problem sizes and input parameters, and efficiently recovers from an incorrect choice of store recycling functions.

97 MATHEMATICS AND COMPUTING↗

Vehicle to Grid Frequency Regulation Capacity Optimal Scheduling for Battery Swapping Station Using Deep Q-Network

Battery swapping stations (BSSs) are ideal candidates for fast frequency regulation services (FFRS) due to their large battery stock capacity. In addition, BSSs can precharge batteries for customers and the batteries that are not in charging can provide a stable regulation capacity to the market. However, uncertainties, such as ACE signals and the EV per-hour visit counts, introduce stochastic nonlinear dynamics into the operation of a BSS-based FFRS. Currently, there is no quantification method to ensure its optimal economical operation. To close this gap, in this article, we propose a novel deep Q-learning-based FFRS capacity dynamic scheduling strategy. This method can autonomously schedule the hourly regulation capacity in real time to maximize the BSSx0027;s revenue for providing FFRS. Case studies using real-world data verify the efficacy of the proposed work.

25 ENERGY STORAGE↗

Dynamic Resource Management for Parallel Tasks in an Oversubscribed Energy-Constrained Heterogeneous Environment

Abstract: The worth of completing parallel tasks is modeled using utility functions, which monotonically-decrease with time and represent the importance and urgency of a task. These functions define the utility earned by a task at the time of its completion. The performance of such a system is measured as the total utility earned by all completed tasks over some interval of time (e.g., 24 hours). To maximize system performance when scheduling dynamically arriving parallel tasks onto a high performance computing (HPC) system that is oversubscribed and energy-constrained, we have designed, analyzed, and compared different heuristic techniques. Four utility-aware heuristics (i.e., Max Utility, Max Utility-per-Time, Max Utility-per-Resource, and Max Utility-per-Energy), three FCFS-based heuristics (Conservative Backfilling, EASY Backfilling, and FCFS with Multiple Queues), and a Random heuristic were examined in this study. A technique that is often used with the FCFS-based heuristics is the concept of a permanent reservation. We compare the performance of permanent reservations with temporary place-holders to demonstrate the advantages that place-holders can provide. We also present a novel energy filtering technique that constrains the maximum energy-per-resource used by each task. We conducted a simulation study to evaluate the performance of these heuristics and techniques in an energy-constrained oversubscribed HPC environment. With place-holders, energy filtering, and dropping tasks with low potential utility, our utility-aware heuristics are able to significantly outperform the existing FCFS-based techniques.

Energy-Constrained↗

Preliminary Cyber-Informed Dynamic Branch Conditions for Analysis with the Dynamic Simplified Cyber MELCOR Model

Instrumentation and control of nuclear power is transforming from analog to modern digital assets. These control systems perform key safety and security functions. This transformation is occurring in new plant designs as well as in the existing fleet of plants as the operation of those plants is extended to 60 years. This transformation introduces new and unknown exploits involving both digital asset induced safety issues and security exploits. Traditional the open literature of nuclear power risk assessment tools and cyber security assessment methods have not been modified or developed to address the unique nature of cyber failure modes and of cyber security threats. Starting in 2015, Sandia National Laboratories (SNL) embarked on a two year dynamic cyber-risk informed project to facilitate the analysis of unique cyber failure modes and the time sequencing of cyber faults, both malicious and non-malicious, and impose those cyber exploits and cyber faults onto a nuclear power plant accident sequence simulator code to assess how cyber exploits and cyber faults could interact with a plant's digital instrumentation and control (DI and C) system in the absence of digital controls. This will be achieved by coupling SNL's existing dynamic scheduler code (ADAPT), nuclear accident simulator code (MELCOR), and cyber Emulytics code (SCEPTRE) to demonstrate real-time simulation of cyber exploits and their impact on automatic DI and C responses. Studying such potential time-sequenced cyber-attacks and their risks (i.e., the associated impact and the associated degree of difficulty to achieve the attack vector) as they pertain to accident management will provide a risk informed basis for developing effective cyber security controls for nuclear power. This paper will discuss the rationale behind the proposed generic cyber exploits for an abstracted Pressurized Water Reactor that has adopted a unified DI and C System. Other papers related to this project submitted to this conference discuss: - The MELCOR model for this abstracted reactor, called the Dynamic Simplified Cyber (DSC) model, - Modifications to ADAPT to: Extend the framework for multiple simulators, Incorporation of importance measures into dynamic event tree analysis, Sort and reduce the dynamic event tree based upon inputs to or outputs from the tree, and - A feasibility study for using density based clustering methods with dynamic time wrapping to cluster and prune dynamic event trees. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A VISION of Advanced Nuclear System Cost Uncertainty

VISION (VerifIable fuel cycle SImulatiON) is the Advanced Fuel Cycle Initiative’s and Global Nuclear Energy Partnership Program’s nuclear fuel cycle systems code designed to simulate the US commercial reactor fleet. The code is a dynamic stock and flow model that tracks the mass of materials at the isotopic level through the entire nuclear fuel cycle. As VISION is run, it calculates the decay of 70 isotopes including uranium, plutonium, minor actinides, and fission products. VISION.ECON is a sub-model of VISION that was developed to estimate fuel cycle and reactor costs. The sub-model uses the mass flows generated by VISION for each of the fuel cycle functions (referred to as modules) and calculates the annual cost based on cost distributions provided by the Advanced Fuel Cycle Cost Basis Report1. Costs are aggregated for each fuel cycle module, and the modules are aggregated into front end, back end, recycling, reactor, and total fuel cycle costs. The software also has the capability to perform system sensitivity analysis. This capability may be used to analyze the impacts on costs due to system uncertainty effects. This paper will provide a preliminary evaluation of the cost uncertainty affects attributable to 1) key reactor and fuel cycle system parameters and 2) scheduling variations. The evaluation will focus on the uncertainty on the total cost of electricity and fuel cycle costs. First, a single light water reactor (LWR) using mixed oxide fuel is examined to ascertain the effects of simple parameter changes. Three system parameters; burnup, capacity factor and reactor power are varied from nominal cost values and the affect on the total cost of electricity is measured. These simple parameter changes are measured in more complex scenarios 2-tier systems including LWRs with mixed fuel and fast recycling reactors using transuranic fuel. Other system parameters are evaluated and results will be presented in the paper. Secondly, the uncertainty due to variation in scheduling effects is evaluated. For example, economic impacts due to increased nuclear energy growth rates and speed-ups in deployment of fuel cycle facilities and fast reactors. Preliminary results show that significant variations in the costs of the scenarios can result from variations in burnup, capacity factor and reactor power. The paper will include new results from analysis of additional system variables and due to scheduling dynamics. Reference 1. Shropshire, D.E. et al, 2007, Advanced Fuel Cycle Cost Basis, INL/EXT-07-12107, April 2007.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

On the adequacy of lightweight thread approaches for high-level parallel programming models

High-level parallel programming models (PMs) are becoming crucial in order to extract the computational power of current on-node multi-threaded parallelism. The most popular PMs, such as OpenMP or OmpSs, are directive-based: the complexity of the hardware is hidden by the underlying runtime system, improving coding productivity. The implementations of OpenMP usually rely on POSIX threads (pthreads), offering excellent performance for coarse-grained parallelism and a perfect match with the current hardware. OmpSs is a task oriented PM based on an ad hoc runtime solution called Nanos++; it is the precursor of the tasking parallelism in the OpenMP tasking specification. A recent trend in runtimes and applications points to leveraging massive on-node parallelism in conjunction with fine-grained and dynamic scheduling paradigms. In this paper we analyze the behavior of the OpenMP and OmpSs PMs on top of the recently emerged Generic Lightweight Threads (GLT) API. GLT exposses a common API for lightweight thread (LWT) libraries that offers the possibility of running the same application over different native LWT solutions. We describe the design details of those high-level PMs implemented on top of GLT and analyze different scenarios in order to assess where the use of LWTs may benefit application performance. Our work reveals those scenarios where LWTs overperform pthread-based solutions and compares the performance between an ad hoc solution and a generic implementation.

97 MATHEMATICS AND COMPUTING↗

Cross-scale efficient tensor contractions for coupled cluster computations through multiple programming model backends

Coupled-cluster methods provide highly accurate models of molecular structure through explicit numerical calculation of tensors representing the correlation between electrons. These calculations are dominated by a sequence of tensor contractions, motivating the development of numerical libraries for such operations. While based on matrix–matrix multiplication, these libraries are specialized to exploit symmetries in the molecular structure and in electronic interactions, and thus reduce the size of the tensor representation and the complexity of contractions. The resulting algorithms are irregular and their parallelization has been previously achieved via the use of dynamic scheduling or specialized data decompositions. We introduce our efforts to extend the Libtensor framework to work in the distributed memory environment in a scalable and energy-efficient manner. We achieve up to 240× speedup compared with the optimized shared memory implementation of Libtensor. We attain scalability to hundreds of thousands of compute cores on three distributed-memory architectures (Cray XC30 and XC40, and IBM Blue Gene/Q), and on a heterogeneous GPU-CPU system (Cray XK7). As the bottlenecks shift from being compute-bound DGEMM's to communication-bound collectives as the size of the molecular system scales, we adopt two radically different parallelization approaches for handling load-imbalance, tasking and bulk synchronous models. Nevertheless, we preserve a unified interface to both programming models to maintain the productivity of computational quantum chemists.

97 MATHEMATICS AND COMPUTING↗