Search NASA⌕ Search

SEARCH · Search NASA

Results for “early design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗

Initial User Study Insights Clarified Community Requirements & Early Feedback on Conceptual Design

The HPDF User Experience (UX) team conducted eight semi-structured interviews with twelve individuals leading data and computing infrastructure work at DOE Office of Science (SC) user facilities or projects. This report presents key takeaways synthesizing community perspectives and needs, along with recommendations for the project. These insights should be considered as conceptual design work continues, early partnerships begin, workflow readiness activities evaluate and enhance key scientific tools, and early access systems are made available to the Office of Science (SC) community. Vigilance in meeting community requirements and ensuring workflow readiness will be needed to ensure HPDF’s success.

97 MATHEMATICS AND COMPUTING↗

Planning for Material Control and Accountancy at Liquid Fueled Molten Salt Reactors

The purpose of this report is to provide molten salt reactor (MSR) developers and future US Nuclear Regulatory Commission (NRC) license applicants with recommendations for developing an effective and practical material control and accounting (MC&A) plan, focused primarily on MSR designs that use circulating liquid fuel. Because of the breadth of MSR designs, there is no single, generic, detailed MC&A plan that will work for every design. The wide variation of fresh fuel salts, the method and frequency of loading fresh fuel, the reactor system design components (e.g., tanks, filtration systems, chemical processing streams), and waste streams will determine the specific measurement locations and instrumentation that can best meet MC&A objectives throughout an MSR facility. Additionally, MSR designs are rapidly evolving, and new design features and deployment scenarios that will affect MC&A are being explored and pursued. This report defines a generic MC&A approach that was developed for terrestrial (as opposed to maritime) deployments to meet the intent of NRC domestic safeguards and MC&A. MSR license applicants should consider nuclear safeguards (both domestic and international) and security throughout the design, as early as the preconceptual design phase. MC&A of special nuclear material (SNM) is an aspect of the NRC’s domestic safeguards program, alongside physical protection. Because liquid-fueled MSRs are reactors with SNM in nondiscrete (or item) form, it is likely that the NRC may require liquid-fueled MSR license applicants to submit a formal MC&A plan as a part of their license application. Currently, the NRC licensing protocol presents a challenge because the NRC MC&A regulations have not been updated to accommodate advanced reactors, including types of MSRs. Because no liquid-fueled MSR has been licensed for operation at the time of this report, no template or precedence for a successfully licensed MSR MC&A plan exists. However, the MSR license applicant can take advantage of the NRC’s published commitments to performance-based regulations. The authors recommend that the license applicant, or MSR designers, develop an MC&A plan throughout the design lifecycle and plan to submit a detailed MC&A program description, or MC&A plan, to the NRC as a part of a license application. No MC&A plan template or guidance exists that is specific to liquid-fueled MSRs. The authors recommend that license applicants discuss the topic of MC&A during preapplication engagement. Because of the uniqueness of MC&A for liquid fueled MSRs, the authors recommend that liquid fueled MSR developers engage with the NRC on the topic of MC&A in the early phases of its design development and follow up any time there are significant modifications in design plans that would affect MC&A. For example, topics like modifications in fuel handling processes, changes in uranium enrichment, or additional chemical processing streams added to the design could be discussed with the NRC specifically on the topic of MC&A.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risk Informed, Performance-Based, Technology-Inclusive Regulatory Infrastructure: Technology-Inclusive Determination of Mechanistic Source Terms for Offsite Dose-Related Assessments for Advanced Nuclear Reactor Facilities

This report summarizes a risk informed, performance-based and technology-inclusive approach to determine source terms for dose related assessments at advanced nuclear facilities. This approach uses a graded process which allows both the non-mechanistic source terms calculation methods, which adopt conservative approaches and assumptions based on known physical and chemical principles, and more importantly the mechanistic source term calculation methods, which consider design-specific scenarios and use best estimate models with uncertainty quantification for a range of licensing basis events (LBEs), to be used for the design and licensing of advanced nuclear technologies. The source terms developed with this graded approach, and radionuclide inventories elsewhere in the facility that are determined during source term analysis, can be used to address licensing issues to support the application processes of 10 CFR Part 50 for a construction permit and operating license or 10 CFR Part 52 for a Combined Operating License (COL), Standard Design Certification, Early Site Permit, Standard Design Approval or Manufacturing License. They can also be used for other purposes including equipment environmental qualification, control room habitability analyses, and assessments of severe accident risks in environmental impact statements. There are many advanced reactor concepts being developed including high temperature gas-cooled reactor (HGTR), sodium-cooled fast reactor (SFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), micro-reactor, etc. The graded approach presented in this report for source terms determination is, to the extent possible, generic to any of these reactor designs and to future reactor designs. This report provides information on the review of the regulatory foundation for use of conservative bounding source terms as well as event-specific mechanistic source terms for advanced nuclear reactor designs.

07 ISOTOPE AND RADIATION SOURCES↗

Cyber-Informed Engineering (CIE) Integration into Model- Based Systems Engineering (MBSE)

Engineering design in the field of industrial engineering, such as designing automated factories or warehouses, is critical for the effective operation of facilities. Any design flaws introduced early can result in significant capital expenses to correct. However, early-stage engineering design is inherently complex. The systems are not yet built, requiring designers to integrate various aspects, including digital engineering and cybersecurity, to support virtual representations throughout the design process. In this study, we propose an approach to integrate Cyber-Informed Engineering (CIE) principles into model-based systems engineering (MBSE). This approach facilitates the development of a digital thread for engineering systems, ensuring secure digital artifacts in the design of industrial engineering systems.

42 - ENGINEERING↗

ARC-100 Conceptual Design Phase Level 1 PSA Early Draft

This report represents the initial structure and content created for the ARC-100 nuclear reactor initial conceptual design Probabilistic Safety Assessment. The objective of the study is to assess the safety of the ARC-100 nuclear reactor conceptual design using a risk-informed approach. This early draft report is the first transmittal of the Probabilistic Safety Assessment approach and will be expanded over the remainder of the projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Simulating Buildings While the Design is Still in the Architect's Imagination

Very early in the design process, prior to drawing a single line, architects get information from their client or prospective client trying to understand the nature and requirements of the building that needs to be designed. The design of the building is completely fluid, as the architect considers many options in their imagination. The overall massing of the building, the general shape and form, are being considered during this early step. Even for a simple box-shaped building, the aspect ratio between the east-west and the north-south dimensions of the building can greatly impact energy consumption due to daylighting availability. The prevailing winds and building orientation can impact natural ventilation. The locations of high and low population density spaces can also impact energy use. Deciding the floor area per office workstation or the size of the auditorium will impact energy use. Does making a building two stories instead of one reduce energy impacts by reducing roof area or does the additional volume for stairs and elevators result in more energy use. Since certain types of spaces require more windows for occupants than others, the locations of those spaces will determine how much glazing each building orientation has impacting daylighting as well as heating and cooling energy. The project was an attempted first step toward creating a system tailored toward architects for this very early stage in the design process to help them understand the energy impacts of design options. The approach was not to be based on drawing the building, and instead, the main inputs would have been the size of each type of space in the building. This report describes information gathered during the development that might be of use to others developing similar software as well as some of the software that was developed during the project. Phase II funding to continue this work was not pursued due to intellectual property issues discovered during the development of the commercialization plan.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Microgrid Design Toolkit (MDT) User Guide: Software v1.4

The MDT is a decision support software that can provide the information needed to identify optimal microgrid designs in the early stages of the design process. MDT searches the trade space of alternative microgrid designs in terms of user-defined objectives, such as performance, reliability, and cost. It produces a Pareto frontier of solutions embodying the efficient tradeoffs amongst multiple user-defined objectives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters: Preprint

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

industry support↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements for tidal, river, and ocean current technologies has been completed. This work presents the evaluation questions and qualitative performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

converter↗

Human Factors for Advanced Reactors

Existing light water reactors in the U.S. are primarily large baseload electricity generating facilities. The concept of operations for these plants remains largely unchanged since the advent of commercial nuclear power—the main control room serves as the hub of plant activities and is staffed with multiple licensed operators who work in tandem under the shift supervisor, and staff such as field workers support the control room remotely. While newer plants have brought the advent of digital human-machine interfaces to replace earlier analog and mechanical instrumentation and controls, much of the control process remains unchanged and manual. It is simply a newer version of legacy concepts. Advanced reactors potentially bring considerable changes to the size, fuel type, automation, and staffing of nuclear power plants, necessitating a fundamental shift not just from analog to digital, but further from human to automation, from onsite to remote, from control to monitoring, and from many to few operators. Despite this multitude of parallel evolutions in reactor designs, many of the vendors developing the next generation of reactors represent smaller research and development enterprises. It is therefore not feasible to address all aspects of plant design at the same time. In particular, the competing design aspects of new reactors present a significant challenge to the development of robust and human factored systems at the plant. As vendors develop new reactor designs, much of the early focus is naturally on the fuel and reactor system technology. Looming behind these early advances is the daunting prospect of first-of-a-kind control concepts that have not yet been developed or validated. A failure to address the human element of reactor design early will lead to missed opportunities. The quickest development process is the replication of existing concepts of operations at legacy plants, even when such systems were long ago surpassed by better human-machine technologies outside the nuclear industry. Conversely, attempting to undertake novel concepts of operations late in the design life cycle of a plant could result in protracted development efforts and delays in licensing and deployment. This does not have to happen, and it is imperative that human factors be considered now, early in the design of new reactors.

99 GENERAL AND MISCELLANEOUS↗

Driving Economics and Reducing Risks: The Business Case for Security-by-Design in Nuclear Power

This report provides an analysis of the financial, operational, and strategic advantages of incorporating Security-by-Design (SeBD) early in the lifecycle of nuclear power plant projects. By framing security as a foundational design element rather than a late-stage add-on, owners, vendors, and operators can reduce budget overruns, strengthen regulatory compliance, and increase revenue opportunities. The report details key lifecycle phases, highlighting the strategic imperative for organizations (including project developers, investors, vendors, and regulators) to adopt SeBD. Drawing on industry estimates, real-world case studies, and comparative cost analyses, the findings underscore that even a modest upfront investment in SeBD can yield substantial long-term returns by preventing costly retrofit activities, minimizing regulatory delays, and positioning nuclear vendors for the ability to adapt in the evolving security market. By avoiding excessive retrofit expenses and positioning security as a built-in feature rather than an afterthought, nuclear projects can protect their financial performance, enhance public trust, and secure a competitive edge in an increasingly complex global energy market. The authors advocate for SeBD’s strategic implementation, supported by established quality management methodologies, thereby promoting continuous improvement and defect avoidance. Ultimately, early SeBD integration represents a strategic investment, yielding significant returns by preventing costly retrofits and positioning nuclear projects for enhanced competitiveness and public trust.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Developing energy flexibility in clusters of buildings: A critical analysis of barriers from planning to operation

This paper examines building energy flexibility at an aggregated level and addresses the main barriers and research gaps for the development of this resource across three design and development phases: market and policy, early planning and design, and operation. We review methodologies and tools and discuss barriers, challenges, and opportunities, incorporating policy, economic, technical, professional, and social perspectives. Although various legal and regulatory frameworks exist to foster the development of energy flexibility for small buildings, financing mechanisms are limited with a significant number of perceived risks undermining private investment. For the early planning and design phase, planners and designers lack appropriate tools and face interoperability challenges, which often results in insufficient consideration of demand response programs. The review of the operational phase highlighted the socio-technical challenges related to both the complexity of deployment and communication, as well as privacy and acceptability issues. Finally, the paper proposes a number of targeted research directions to address challenges and promote greater energy flexibility deployments, including capturing building demand side dynamics, improving baseline estimations and developing seamless connectivity between buildings and districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demonstrating the Value of 3D Models to Support Large-Scale Digital Modifications at Nuclear Power Plants

Many Nuclear Power Plants are currently in the process of extending their operating licenses for continued generation. The use of three-dimensional (3D) modeling in the early stages of large scale NPP modernization efforts is one lower cost method that can verify proposed design changes against established guidelines and allows for visual presentation of the 3D model to various stakeholders in the project. Guidance from Nuclear Regulatory Commission NUREG 0711 and 0700, and other sources on performing HF/E for control rooms and design modifications can be visually represented in 3D models. Distance and measurements, workstation design, anthropometric considerations, and early feedback of modifications are used in 3D models to identify potential human issues early in the design process. 3D modeling is a useful tool for early design and help to reduce costs and present visuals to stakeholders early in the design.

3D Models↗

Quantum Computing Strategy 2026

Quantum computing (QC) is a rapidly maturing technology with the potential for revolutionary impacts on stockpile stewardship science and national security. Recent developments in fault-tolerant architectures have compressed vendor roadmaps, and predictions of a production-ready quantum computer by the mid-2030s are becoming increasingly credible. This strategy provides a roadmap for integrating QC into the Advanced Simulation and Computing (ASC) program by investing in four strategic focus areas: 1. Develop Capabilities in Mission-Relevant Quantum Applications: ASC will prioritize developing quantum-ready applications in mission areas that have shown significant promise for quantum advantage, including simulations of materials in extreme environments, nuclear dynamics, solving linear and nonlinear partial differential equations, and uncertainty quantification. These applications directly support stockpile stewardship science and modernization objectives. 2. Conduct R&D in Algorithms, Software, and Hardware: Sustained research into quantum algorithms, robust software tools, and quantum hardware is essential. ASC will develop efficient quantum algorithms; invest in quantum compilers, debuggers, and performance tools; and explore specialized quantum hardware tailored to NNSA’s unique requirements. 3. Engage with Vendors and Partners: Early and active collaboration with commercial quantum hardware vendors and academic partners is critical. Through testbeds, co-design agreements, and quantum demonstration facilities, ASC will influence hardware design, gain early access to emerging technologies, and ensure that quantum platforms evolve to meet mission needs. 4. Build Knowledge, Experience, and Workforce: Expanding and upskilling the quantum-trained workforce is essential to long-term success. This includes hiring, internal training, university outreach, and postdoctoral support to ensure ASC maintains the expertise required to operate, program, and integrate quantum systems as they become available. While quantum computing will never replace classical computing, it has the potential to solve certain problems with speed and accuracy that would be unachievable using any conceivable classical high-performance computing (HPC) system. By investing strategically in QC, ASC will help propel the emergent QC industry, maintain U.S. technological leadership, ensure mission readiness, and position itself to rapidly adopt quantum technologies as they mature.

97 MATHEMATICS AND COMPUTING↗