Impact of High PV Penetration on the Inter-AreaOscillations in the U.S. Eastern Interconnection
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Presented by NETL at Carbon Capture, Utilization, and Storage (CCUS) Conference, 06/16
As photovoltaic (PV) generation penetration increases, the inertial and primary frequency response of North American electric grids after a generation loss disturbance will decrease. This change could negatively influence North American power grids frequency stability. This project produced a series of high PV penetration models from detailed, validated base models of all three U.S. interconnections (Eastern Interconnection, Western Electricity Coordinating Council, and Electric Reliability Council of Texas) so that the effects of increased PV generation on their frequency responses can be fully quantified. Mitigation strategies were also developed and validated using both software and hardware test beds.
The Department of Energy's Office of Electricity has initiated a $60M program to assist the electric industry in interconnection-level analysis and planning. The objective of this effort is to facilitate the development or strengthening of capabilities in each of the three interconnections serving the lower 48 states of the United States, to prepare analyses of transmission requirements under a broad range of alternative futures and develop long-term interconnection-wide transmission expansion plans. The interconnections are the Western Interconnection, the Eastern Interconnection, and the Texas Interconnection. One element of this program address the support and development of an integrated energy-water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning (the Eastern Interconnection is not participating in this element). Specific objectives include: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between members of this proposal team and the Western Electricity Coordinating Council (WECC), Western Governors Association (WGA), the Electric Reliability Council of Texas (ERCOT) and their associated stakeholder teams. (3) Exercise the Energy-Water DSS to investigate water stress implications of the transmission planning scenarios put forward by WECC, WGA, and ERCOT. The goals of this project are: (1) Develop an integrated Energy-Water Decision Support System (DSS) that will enable planners to analyze the potential implications of water stress for transmission and resource planning. (2) Pursue the formulation and development of the Energy-Water DSS through a strongly collaborative process between Western Electricity Coordinating Council, Electric Reliability Council of Texas, Western Governors Association, and Western States Water Council. (3) Exercise the Energy-Water DSS to investigate water transmission planning scenarios.
The reliable operation of an electric power system depends on careful management of the balance between generation and load to ensure that system frequency is maintained within narrow bounds around a scheduled value. Yet, maintaining frequency at the scheduled value is challenging because the load served is continuously changing, and occasionally, events such as the sudden loss of a large generation plant or large amount of load, cause frequency to deviate abruptly. This report reviews the recent history of frequency performance for all three U.S. interconnections: Eastern, Western, and the Electric Reliability Council of Texas (ERCOT). The review is based on data collected by the North American Electric Reliability Corporation (NERC). The review focuses on frequency response, which measures the performance of the interconnections immediately following sudden, large imbalances between load and generation. Trends in frequency response are presented and preliminary efforts are made to relate frequency response to other aspects of frequency performance and to examine aspects of the methods used to calculate frequency response.
This technical report is a summary of work performed under the DOE GMLC program under the task titled “Discovery through Situational Awareness”. The focus of this work was to apply big data, statistical techniques to PMU data to do the following: 1) baseline PMU data and find anomalies with a focus on phase angle pairs, 2) identify the frequencies of dominant modal oscillations between different parts of a power system, and 3) identify and classify frequency events in PMU data. This work was performed on PMU data from the Western Interconnect. Many of these algorithms will be applied to wide area phase angle pair data on the Eastern Interconnect in a tool called ESAMS (Eastern Interconnect Situational Awareness Monitoring System). ESAMS was built by EPG (Electric Power Group) and PNNL and is currently being installed on the Eastern Interconnect. The results discussed in this report were made from 14 PMUs from data ranging from Oct 2016 to May 2018. The PMU data were measured 60 times each second. Fourteen phase angle pairs were included, with reactive and active power being calculated at 14 sites. All results have been de-identified for this report. The methodologies applied in the ESAMS tool are described in Section 2. A baseline of PMU data is created using the last 120 days of data. This baseline describes typical behavior as understood from the data. The baseline is then applied to the next day’s data and anomalies from that baseline are identified. Plots are created to help describe what is anomalous during that specific moment in time. These algorithms are currently being installed on the Eastern Interconnect. FY19 work will include discussing the results and findings from the ESAMS tool. A new method of identifying the frequencies of dominant modal oscillations between different parts of a power system is described in Section 3. A list of 199 frequency events provided by Bonneville Power Administration were used to create algorithms to detect frequency events and to create classification rules that can be used to identify future frequency events. Section 4 discusses the results the performance of 7 different event detection, clustering-based methods. Accuracy percentages ranged from 93.59% to 99.16%, with most methods being very fast. GBM (Gradient Boosting Machine) performed well and quickly. These 7 different methods were also tested to determine how well each built classification rules on training data and then applied those rules to identify future frequency events. Accuracy percentages ranged from 89.09% to 99.9%, with all methods performing quickly. GLM (General Linear Model) was viewed as the top performer when considering accuracy and processing time. Because the list of events consisted of 80% of them as active power events and only 20% as faults, all methods struggled to identify events as faults. Small faults were especially difficult to identify. A separate algorithm was created to help with this. Additional work will be done in FY19 on event detection using more data and more events and refinements to the methods.
Nonsynchronous generations such as photovoltaics (PVs) are expected to undermine bulk power systems (BPSs)' frequency response at high penetration levels. Though the underlying mechanism has been relatively well understood, the accurate assessment and effective enhancement of the U.S. interconnections, frequency response under extra-high PV penetration conditions remains an issue. In this paper, the industry-provided full-detail interconnection models were further validated by synchrophasor frequency measurements and realistically-projected PV geographic distribution information were used to develop extra-high PV penetration scenarios and dynamic models for the three main U.S. interconnections, including Eastern Interconnection (EI), Western Electricity Coordinating Council (WECC), and Electric Reliability Council of Texas (ERCOT). Up to 65% instantaneous PV and 15% wind penetration were simulated and the frequency response change trend of each U.S. interconnection due to the increasing PV penetration level were examined. Most importantly, the practical solutions to address the declining frequency response were discussed. This paper will provide valuable guidance for policy makers, utility operators and academic researchers not only in the U.S. but also other countries in the world.
In 2023 additional electricity transmission would have provided the most value for links that crossed between grid interconnection regions in the United States (the Western Interconnection, the Eastern Interconnection, the Texas Interconnection) or crossed between system operator regions within the same interconnection. Many multi-interconnection or multi-region links had values of greater than $\$20$/MWh, or up to $\$175$ million/yr per 1 GW expanded transmission (subject to limits to the depth of the market at each side of the link). In contrast, many links within regions, or between regions in the northeast, had relatively low values in 2023, following the overall decline in wholesale electricity prices in 2023 compared with 2021-2022. The most valuable link in 2023, at $\$61$ /MWh, was between Texas and the Southwest. Multiple events in 2023 (high natural gas prices in the western U.S., and high summer temperatures in Texas and the Southwest) were observed to have driven this high value. Of particular note, high prices in Texas occurred at a largely distinct set of hours from high prices in the Southwest, helping to drive up the value of transmission in total and demonstrating significant value to both regions. This example demonstrates the unique value of transmission (compared to other solutions, such as building local generation resources) in delivering benefits to multiple regions given its ability to connect areas of the country that inevitably face differing circumstances.
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 14 topics was developed for further analysis. This paper brings together the earlier interim reports of the first 13 topics plus one additional topic into a single final report.
In 2010, the U.S. Department of Energy (DOE) provided $60M in funding to five regional entities to conduct interregional transmission planning activities: the Eastern Interconnection Planning Collaborative (EIPC); the Eastern Interconnection States Planning Council (EISPC); the Transmission Expansion Planning and Policy Committee (TEPPC); the State Provincial Steering Committee (SPSC);and the Electricity Reliability Council of Texas (ERCOT). DOE also provided funding to the Lawrence Berkeley National Laboratory (LBNL) to support aspects of these interregional transmission planning activities. LBNL’s support involved both technical assistance to DOE in its oversight of the activities conducted by the five regional entities and the preparation of six, standalone technical studies that were conducted in direct support for specific entities. This is the final report on LBNL’s activities. It consists of summaries of each activity; references are provided to each of the stand-alone studies.
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.
Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a stakeholder steering committee (SSC) that included representatives from the Eastern Interconnection States’ Planning Council (EISPC) among others, the project was conducted in two phases. The first was a 2015–2040 analysis that looked at a broad array of possible future scenarios, while the second focused on a more detailed examination of the grid in 2030. The studies provided a wealth of information on possible future generation, demand, and transmission alternatives. However, at the conclusion there were still unresolved questions and issues. The US Department of Energy, which had sponsored the study, asked Oak Ridge National Laboratory researchers and others who worked on the project to conduct an additional study of the data to provide further insights for stakeholders and the industry. This report documents the second part of that follow-on study [an earlier report (Hadley 2013) covered the first part, and a subsequent report will address the last part].
NREL project manager Aaron Bloom introduces NREL’s Eastern Renewable Generation Integration Study (ERGIS) and high-performance computing capabilities and new methodologies that allowed NREL to model operations of the Eastern Interconnection at unprecedented fidelity. ERGIS shows that the Eastern Interconnection can balance the variability and uncertainty of wind and solar photovoltaics at a 5-minute level, for one simulated year.
Integrating 20% or more wind energy into the system and transmitting large sums of wind energy over long distances will require a decision making capability that can handle very large scale power systems with tens of thousands of buses and lines. There is a need to explore innovative analytical and implementation solutions for continuing reliable operations with the most economical integration of additional wind energy in power systems. A number of wind integration solution paths involve the adoption of new operating policies, dynamic scheduling of wind power across interties, pooling integration services, and adopting new transmission scheduling practices. Such practices can be examined by the decision tool developed by this project. This project developed a very efficient decision tool called Wind INtegration Simulator (WINS) and applied WINS to facilitate wind energy integration studies. WINS focused on augmenting the existing power utility capabilities to support collaborative planning, analysis, and wind integration project implementations. WINS also had the capability of simulating energy storage facilities so that feasibility studies of integrated wind energy system applications can be performed for systems with high wind energy penetrations. The development of WINS represents a major expansion of a very efficient decision tool called POwer Market Simulator (POMS), which was developed by IIT and has been used extensively for power system studies for decades. Specifically, WINS provides the following superiorities; (1) An integrated framework is included in WINS for the comprehensive modeling of DC transmission configurations, including mono-pole, bi-pole, tri-pole, back-to-back, and multi-terminal connection, as well as AC/DC converter models including current source converters (CSC) and voltage source converters (VSC); (2) An existing shortcoming of traditional decision tools for wind integration is the limited availability of user interface, i.e., decision results are often text-based demonstrations. WINS includes a powerful visualization tool and user interface capability for transmission analyses, planning, and assessment, which will be of great interest to power market participants, power system planners and operators, and state and federal regulatory entities; and (3) WINS can handle extended transmission models for wind integration studies. WINS models include limitations on transmission flow as well as bus voltage for analyzing power system states. The existing decision tools often consider transmission flow constraints (dc power flow) alone which could result in the over-utilization of existing resources when analyzing wind integration. WINS can be used to assist power market participants including transmission companies, independent system operators, power system operators in vertically integrated utilities, wind energy developers, and regulatory agencies to analyze economics, security, and reliability of various options for wind integration including transmission upgrades and the planning of new transmission facilities. WINS can also be used by industry for the offline training of reliability and operation personnel when analyzing wind integration uncertainties, identifying critical spots in power system operation, analyzing power system vulnerabilities, and providing credible decisions for examining operation and planning options for wind integration. Researches in this project on wind integration included (1) Development of WINS; (2) Transmission Congestion Analysis in the Eastern Interconnection; (3) Analysis of 2030 Large-Scale Wind Energy Integration in the Eastern Interconnection; (4) Large-scale Analysis of 2018 Wind Energy Integration in the Eastern U.S. Interconnection. The research resulted in 33 papers, 9 presentations, 9 PhD degrees, 4 MS degrees, and 7 awards. The education activities in this project on wind energy included (1) Wind Energy Training Facility Development; (2) Wind Energy Course Development.
The transition from conventional to modern power systems is causing an increase in integration of inverter-based resources (IBRs). This generally leads to a decrease in total system inertia, which in-turn increases the system’s rate-of-change-of-frequency (RoCoF) during disturbances. This poses a threat to the frequency stability of the system and may falsely trigger protective devices. To monitor system status and plan for integrating renewable energy sources like photovoltaic, wind, and energy storage systems, a realistic study of inertia estimation and analysis in the United States (US) over the past decade is needed. This paper uses field-measured phasor measurement unit (PMU) data collected throughout the US from 2013 to 2023 via the Frequency Monitoring Network (FNET/GridEye) operated by the University of Tennessee, Knoxville (UTK) and Oak Ridge National Laboratory (ORNL). The collected PMU frequency data is utilized to estimate the system inertia of the three US interconnections: Eastern, Western, and Texas. Various RoCoF time windows are investigated for estimating the inertia of each interconnection by maximizing the correlation coefficient between the measured RoCoF and power mismatch. The resulting inertia trends over the past decade show approximately a 6% decline in inertia in the Eastern interconnection, a 15% decline in inertia in the Western interconnection, and a 16% increase in inertia in Texas. Key insights into how inertia is changing amidst the complex energy landscape are extracted using the fuel mix trend data. This provides valuable information for future energy strategies and planning.
The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.
Not Available
In recent years, utilities have made great strides in the use of high-speed wide-area measurements collected from within their footprints. However, it is increasingly clear that analyses at wider scales are needed. On January 11, 2019 an oscillation with significant amplitude observable across the Eastern Interconnection persisted for approximately 18 minutes. The generator responsible for the oscillation was only identified after it tripped itself offline. This event, along with several other similar events, demonstrated the need for increased coordination among utilities to effectively mitigate system-wide oscillations and avoid unnecessary or detrimental operator actions. In response to this need, the Eastern Interconnection Situational Awareness Monitoring System (ESAMS) was upgraded to allow the region where an oscillation is originating to be identified. This report documents the algorithms developed for this task and describes how they were integrated into the ESAMS tool. Results from simulation- and measurement-based tests demonstrate the reliability of the approaches.