Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Integration of Electric Power Infrastructure into the Drinking Water Shared Risk Framework: Prototype Development

An existing shared risk framework designed for assessing and comparing threat-based risks to water utilities is being extended to incorporate electric power. An important differentiating characteristic of this framework is the use of a system-centric rather than an asset-centric approach. This approach allows anonymous sharing of results and enables comparison of assessments across different utilities within an infrastructure sector. By allowing utility owners to compare their assessments with others, they can improve their self-assessments and identification of "unknown unknowns". This document provides an approach for extension of the framework to electric power, including treatment of dependencies and interdependencies. The systems, threats, and mathematical description of associated risks used in a prototype framework are provided. The method is extensible so that additional infrastructure sectors can be incorporated. Preliminary results for a proof of concept calculation are provided.

42 ENGINEERING↗

Local and utility-wide cost allocations for a more equitable wildfire-resilient distribution grid

Climate-induced extreme weather conditions make electricity infrastructure more vulnerable. They increase the risk of power-line-ignited wildfires which can, in turn, jeopardize electric power delivery. Here, leveraging machine learning, we show that lower-income communities in California not only have lower fractions of power distribution lines undergrounded, but overhead lines and poles in their neighbourhoods are also more vulnerable to wildfires. Should they bear the cost of undergrounding fire-prone lines themselves, they would have to pay a disproportionately higher cost per household. We propose a cost allocation scheme with an income threshold below which the cost is borne by utility-wide ratepayers and above which the cost is borne locally. This scheme can not only minimize the average of undergrounding costs per household as a share of income, but also homogenize such cost–income ratios across communities. Furthermore, our research demonstrates the opportunity to appropriately integrate existing policies to make electricity infrastructure affordable, equitable and reliable amidst climate change.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

EVI-EnSitePy (Electric Vehicle Infrastructure – Energy Estimation and Site Optimization Tool in Python) [EVI-X Modeling Suite] [SWR-25-07]

EVI-EnSitePy is a comprehensive agent-based tool designed for the analysis and design of high-power charging sites, encompassing a wide array of site agents including Electric Vehicles (EVs), chargers, energy storage units (ESS), renewable energy resources (DER), and loads. This versatile tool offers diverse functionalities and a modular modeling approach, allowing detailed configuration of agents based on power ratings, port numbers, energy capacities, demand requirements, charger interfaces, and flexibility to customize the tool for project specific goals. By simulating agent interactions and employing various metrics, EVI-EnSitePy enables the assessment of site performance, exploration of energy management systems (EMS), and implementation of innovative EV charging policies. Utilizing EV charge schedules and arrival states, the tool performs thorough charging site simulations, with outputs consisting of agent and site-level power profiles and statistical metrics. Employing a tree graph structure, EVI-EnSitePy supports nested site structures and power distribution modeling. The tool's ability to generate charging schedules deterministically or via stochastic analysis further enhances its versatility. Through its features and capabilities, EVI-EnSitePy offers a powerful platform for informed decision-making in the realm of high-power charging site design and operation.

Jackson, Derek [National Renewable Energy Laborato↗

Addressing Electric Aviation Infrastructure Cybersecurity Implementation

This technical report evaluates key considerations of cybersecurity systems in preparation for the electrification of both legacy and new aviation services. The objectives are to consider the landscape of components and interconnections, review sensitivities and the criticality of data and operations, and aim to understand the applicability of existing best practices or the need for new ones associated with the cybersecurity of electric charging systems for the aviation sector. Given the early stages of electric aviation deployment, developers have the opportunity to plan and integrate cybersecurity strategies into the complete electric aviation system during the initial stages of design and procurement and will benefit from employing a framework for continuous cybersecurity monitoring. This paper presents initial considerations of key cybersecurity strategies and their application to forthcoming electric aviation systems.

airports↗

An AI-driven framework for evaluating local and state authorities’ permitting processes

The demand for new energy infrastructure is increasing across the United States, but heterogenous permitting processes and embedded requirements across different local jurisdictions can cause project delays, increase “soft costs,” and hinder developer expansion. This study analyzes the variability in local permitting requirements across the U.S. and develops a quantitative approach to describe their clarity and effectiveness in enabling infrastructure project development. By using an Energy Language Model (ELM), a large language model (LLM) for energy technologies, we systematically gathered permitting information from nearly 300 state-, county-, and city-level documents, creating a structured dataset of requirements and procedures on an unprecedented scale and speed. Our analysis revealed that local (city and county) permitting requirement documents are underrepresented compared to state-level guidance documents, which can impede timely and cost-effective installation of new electric infrastructure. Our validation process showed that the final database has an accuracy of approximately 95%. We, further, created a new quantitative method to score permitting requirements for clarity and efficiency, with electric vehicle supply equipment as an initial use case. The average local permitting document scored a 1.8 out of 5, which we interpret as meaning that half of the requirements developers face when installing electric infrastructure are ambiguous, increasing both cost and time. We also created a “Generalized Permit Process”, highlighting common procedural steps and identifying specific opportunities for municipalities to improve their documentation. This research establishes a systematic and scalable framework for evaluating the complexities of local infrastructure permitting processes by combining LLM-powered data collection and quantitative scoring. The framework enables policymakers and developers to identify and mitigate procedural bottlenecks, with the expectation that these improvements can accelerate application review and approval, reduce project costs, and expedite connection to utility distribution grids. As a foundational approach for streamlining local project development processes, this study’s methods are intended to be extended to a wide range of energy applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Strengthening Resilience: Florida Resident Voices on Resource Needs During Power Outages

Extreme weather events related to climate change, and an aging electricity infrastructure are disrupting reliable electricity services to a greater degree. Further, previous research has found that more socially vulnerable populations are more likely to live in areas with a higher probability of power outages. Here, this study examines the issues that people face during power outages and the resources that help individuals maintain resilience during power outages caused by extreme weather events in socially vulnerable communities. Using qualitative data from focus groups with 56 individuals in Central and North Florida, the research highlights lived experiences during outages and difficulties using and accessing resources during these conditions. Based on a qualitative review of the focus group discussions, this paper explores the solutions and support systems residents believe would improve their ability to cope. The findings offer insights to guide policy and strategic planning, with the goal of strengthening personal preparedness and response by focusing on the resources people consider most helpful for enduring frequent and severe outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Role of Innovation in the Electric Utility Sector

Innovation is essential for future power systems to be safe and secure, clean and sustainable, affordable and equitable, and reliable and resilient, according to a recent National Academies report. But state regulatory reforms are needed to encourage adoption of new technologies to support evolution of the nation’s power systems.1 Berkeley Lab's report, The Role of Innovation in the Electric Utility Sector, provides consumer, labor, utility, third-party provider, and clean technology consultant perspectives on this theme. To achieve state targets for clean energy and greenhouse gas emissions, some state regulatory utility commissions are exploring new approaches to spur innovation: -For utilities, regulatory and marketing flexibility, increased funding for demonstration projects, and performance-based ratemaking including multi-year rate plans -For third parties, ways to provide utility customers with innovative products and services directly Among the questions the report addresses: 1. How are consumer advocate views evolving with respect to innovative regulatory and ratemaking approaches? 2. How can utility decarbonization and grid modernization initiatives provide opportunities for local communities and workers to receive tangible benefits and facilitate community support for siting electricity infrastructure? 3. How are electric utilities partnering with technology companies to provide innovative energy management services and sustainable energy solutions for utility customers? 4. What regulatory innovations are public utility commissions exploring to enable third-party providers to participate in the transition to a modern electric system? 5. What regulatory changes are needed to enable innovative solutions from utilities and third parties at the necessary speed and scale to meet state decarbonization goals? The report is the 13th in the Future Electric Utility Regulation series, which taps leading thinkers to tackle complex regulatory issues for electricity. 1 National Academies of Sciences, Engineering, and Medicine. 2021. The Future of Electric Power in the United States. The National Academies Press.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Apparatus for Monitoring the Health of Electrical Cables

As with most elements of infrastructure, electrical wiring is innocuous; usually hidden away and unnoticed until it fails. Failure of infrastructure, however, sometimes leads to serious health and safety hazards. Electrical wiring fails when the polymeric (usually rubber) insulation material that sheathes the conductor gets embrittled with age from exposure to pressure, temperature or radiation cycling or when the insulation gets removed by the chafing of wires against each other. Miles of such wiring can be found in typical aircraft, with significant lengths of the wiring immersed in aviation fuel - a recipe for an explosion if a spark were to occur. Diagnosing the health of wiring is thus an important aspect of monitoring the health of aging aircraft. Stress wave propagation through wiring affords a quick and non-invasive method for health monitoring. The extent to which a stress wave propagating through the cable core gets attenuated depends on the condition of the surrounding insulation. When the insulation is in good condition - supple and pliable, there is more damping or attenuation of the waveform. As the insulation gets embrittled and cracked, the attenuation is likely to reduce and the waveform of the propagating stress wave is likely to change. The monitoring of these changes provides a potential tool to evaluate wiring or cabling in service that is not accessible for visual inspection. This experiment has been designed for use in an introductory mechanical or materials engineering instrumentation lab. Initial setup (after procuring all the materials) should take the lab instructor about 4 hours. A single measurement can be initiated and saved to disk in less than 3 minutes, allowing for all the students in a typical lab section to take their own data rather than share a single set of data for the entire class.

Pai, Devdas M.↗

Evolving Competitive Markets in SAPP: Leveraging Competitive Wholesale Electricity Markets to Drive Renewable Generation Capacity in the Southern African Power Pool (SAPP)

The SADC region has significant natural resource potential to increase renewable energy generation, improve electricity reliability, and support economic development. This research finds an apparent lack of confidence from electricity infrastructure investors in SAPP wholesale electricity markets, which increases risk perception and lowers the likelihood of capital deployment. With respect to free market fundamentals, competitive market obstacles and renewable energy development obstacles are characterized. Stakeholders identified the top obstacles to well-functioning competitive markets as insufficient transmission infrastructure for interconnection and regional movement of electricity, dominance of national single-buyer markets, and lack of or weak nation-state regulatory frameworks. Stakeholders prioritized the top three obstacles for renewable energy development as a lack of viable commercial arrangements for variable renewable energy (VRE) balancing, lack of functional and consistent nation-level regulations, and higher project costs related to reliance on imported equipment. With respect to potential solution options, stakeholders prioritized the development of new cost allocation and finance methods to facilitate new transmission expansion, training to educate new or potential new market entrants on SAPP processes, as well as modeling and analysis of regional SAPP participation benefits disaggregated to the nation-state level. From these perspectives, this research identified strategy options for consideration including transitioning SAPP to a regional transmission operator (RTO) for operation and planning of cross-border transmission facilities and market administration, shifting operations of SAPP member transmission systems to Independent System Operators (ISOs), establishing a regional regulatory authority and enhancing market data transparency. Implementing these reforms is expected to be challenging, but not insurmountable, given the domestic political, legal, and jurisdictional complexities of the SADC region.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Controlled workplace charging of electric vehicles: The impact of rate schedules on transformer aging

To accelerate adoption of non-residential charging for electric vehicles, sites must maximize utilization of existing electrical infrastructure. In this study we model electric vehicle charging at a workplace using real charging data and evaluate the lifetime of the site’s transformer as the number of charging stations is incrementally increased. We implement and compare a range of control schemes for workplace charging including minimizing the peak load, capping the total load, minimizing bills under different rate structures with time-of-use energy costs and demand charges, and directly minimizing the transformer’s aging. These are compared by the number of vehicles they allow the transformer to support, the transformer’s health, and the operator’s electricity bill. We draw a connection between minimizing the peak load and improving the transformer’s health. We observe that minimizing the electricity bill is the best scheme by both criteria when the bill includes a demand charge; in our experiment it allowed the infrastructure to support over 67% more cars than under uncontrolled charging. To protect the transformer we recommend that demand charges or capacity management be applied to parking lots of charging electric vehicles with high infrastructure utilization, and operators schedule charging to minimize their electricity bills.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connecting Electric Vehicle Charging Infrastructure to Commercial Buildings

Electric vehicles (EVs) are growing in popularity and gaining meaningful market share with record sales year over year in the last decade. EV charging equipment, also known as EV chargers (EVC) or EV supply equipment (EVSE), must proportionally match the growing number of new EVs on the road for a comparable experience to gas-powered vehicles. The majority of EV charging currently happens at residential buildings. However, demand for EV charging at commercial buildings will significantly increase with wider mainstream EV adoption and as businesses return to more normal operation following COVID-19 pandemic disruptions. Charging equipment can include various sub-systems like power conditioning module, control software, safety devices, metering, communication, cooling, connectors, and its wiring. EV charging at commercial buildings could be used for public, workplace, and commercial fleet charging. This document aims to describe how EVC can be connected to commercial buildings, including considerations for facility managers, and the effects that charging will have on the buildings electrical distribution system. More specifically, this resource provides an overview of: understanding EV charging basics: how charging equipment connects to the building and to EVs; required infrastructure updates needed at the building site to connect EVC to existing distribution systems; network strategies for cost-effective operation; metering and utility considerations for billing and incentives; charging equipment ownership options; future trends in EVC connection to buildings.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Joint optimization of electric bus charging infrastructure, vehicle scheduling, and charging management

High upfront costs of vehicles and charging infrastructure as well as the lack of knowledge related to infrastructure planning and electric bus system operation are major obstacles to the implementation of battery electric buses (BEBs). To tackle the obstacles and promote BEB adoption, a comprehensive optimization framework was developed to address the combined charging infrastructure planning, vehicle scheduling, and charging management problem for BEB systems, with the goal to minimize the total cost of ownership. The problem was formulated as a mixed-integer non-linear problem. A genetic algorithm-based approach was then proposed to solve the problem. Last, three alternative scenarios based on a sub-transit network in Salt Lake City, Utah, were analyzed and compared with the optimal scenario results in the numerical experiments. Our comparison results demonstrate the effectiveness of the proposed model and solution algorithm in determining a cost-efficient planning strategy for BEB systems.

33 ADVANCED PROPULSION SYSTEMS↗