Search NASA⌕ Search

SEARCH · Search NASA

Results for “electricity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This presentation summarizes a recently published beginner's guide for understanding power system model results for long-term resource plans. This guide is designed to improve decision-making in the electricity planning process by strengthening dialogue between system planners and relevant stakeholders. It focuses on interpreting scenario results generated by power system planning models. These results are often used to inform integrated resource plans, which are long-term plans for a utility to meet future electricity requirements. Whether you are a state utility commissioner, commission staff, part of a state energy office, an intervenor in the planning process, or another stakeholder, this guide is designed to help you better weigh in on the modeling methods or interpret the model results to improve decision-making. This guide can enhance your understanding to ask the right questions, which can enable better understanding of results and key assumptions, data, and methods.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal electric-distribution-grid planning considering the demand-side flexibility of thermal building systems for a test case in Singapore

The planning of district-scale electric grids, i.e., distribution grids, has traditionally relied on finding the most cost-effective design such that they are able to supply the peak loads in a district. With the advent of electric demand side flexibility (DSF), there is the opportunity to reshape peak loads such that the investment cost of the electric grid decreases in exchange for a minor increase in the operation cost. This paper formulates an optimal planning approach for the electric grid at the district scale, which incorporates the DSF from thermal building systems, e.g., heating ventilation and air-conditioning (HVAC) systems. The problem is formulated as a mixed-integer linear program (MILP) and aims at minimizing the investment cost for the grid along with the operation cost of the flexible loads. This is subjected to the fixed electricity demand and thermal comfort constraints of building occupants. To this end, linear models for the thermal comfort in the buildings and the power flow in electric grid are considered. The approach is tested on a district planning test case based in Singapore, where the results show up to 30.9 % reductions in investment cost and up to 3.7 % reduction in total annualized cost. Urban planning authorities, developers and utility companies can all benefit from the presented approach to make optimized investment decisions. For building operators, the results point to the need of adopting their control systems for DSF.

Troitzsch, Sebastian↗

Activating Opportunity Zones for Rapid Solar+Storage Deployment in Low Income Communities (Final Report)

Millions of Texans choose their own power provider, giving them the option to have low-cost and even renewable energy delivered through their retail electric plan. However, Texans with less disposable income often pay more for electricity and have limited access to green energy and emergency backup power even though the costs of solar and wind power are at record lows and continue to decline. The Powered for Good initiative aimed to help deliver clean, affordable, 100% renewable electricity to low-income households in Texas’s Competitive Retail Areas, where households can choose their electricity provider. Objectives: The primary goal of this project was to develop and validate one or more affordable solar+storage products (i.e., priced less than of $0.14/kWh) that Retail Electricity Providers (REP) can offer to LI households. The team achieved three objectives: 1. Investigate how to best reduce electricity costs and increase availability of emergency power for LI customers; 2. Build momentum for, and facilitate an approach to, a Texas-based pilot deployment of such solar+storage products, with a goal of greatly expanding this approach to a large segment of the LI population in Texas; 3. Provide the structural framework, finance model, and roadmap to potentially increase investment of solar+storage projects in LI communities across U.S. states when modified to meet their state-specific laws and regulations. The team evaluated the market of viable solutions for low-income Texans through interviews and focus groups with professionals and residents with lived experience. The team then piloted a low-cost retail electric product. Following the pilot, the team developed educational materials, including fact sheets, a Go Green Save Green interactive guide, and an Electricity Bill Analysis Tool. The team is now working to increase power resilience and reduce energy insecurity with micro solar and storage in partnership with local entities in the Harris County area. Key Findings: Informed by Powered for Good research, including the experiences on Texas residents and electricity system experts, the Powered for Good team developed a pilot that was implemented by Energy Well Texas, a new company formed in late 2020. The pilot featured a combination of a 100% clean residential energy offering delivered through the electrical grid plus a selection of batteries, lights and a solar panel that provided participants with varying levels of backup power. For the 8 customers who submitted previous bills, the Energy Well Texas pilot reduced energy bills by about 30%. In Houston, residents earning less than 30% of Area median Income (AMI) spend an average 13% of their income on energy or about $1,555 per year. Repeating the pilot results for these residents could yield $466 in savings per customer or about 4% of their income. While this will not end energy poverty, it is a big step toward that goal. The Powered for Good and Energy Well Texas teams are currently planning their post-pilot phase of service offerings.

14 SOLAR ENERGY↗

Guest Editorial: Special Issue on recent advancements in electric power system planning with high-penetration of renewable energy resources and dynamic loads

The goal of this Special Issue is to present the state-of-the-art methodologies developed for expansion planning of all segments of the modern power systems, characterized by separated businesses, high penetration of renewable resources and new load types, as well as by application of technologically advanced solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide is for public utility commission staff, state energy office staff, and other stakeholders who review model results for utility integrated resource plans (IRPs). It builds on the "Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans," and delves into more advanced topics that were not included or not fully covered in the beginner's guide. The topics included here are evolving and may or may not be important to the resource plan you are evaluating. Due to limitations in resources, it's also not possible to give the highest level of detail or attention to every topic within a plan. An important part of planning for an uncertain future involves deciding which topics deserve the most focus and resources. It's all about prioritizing efforts where they will have the most impact or be most beneficial despite uncertainties ahead. As with the beginner's guide, we intend for this guide to help improve decision-making in the electricity planning process by strengthening understanding and dialogue between electricity system planners and relevant stakeholders. The following information is designed to allow you to better engage in the planning process by evaluating results, asking questions, and thinking through what is most important. We allocate significant discussion in the guide to electricity demand evolution, demand-side resources, and resource adequacy. These topics have garnered increasing attention, hence their prominence in this guide. Other topics are also presented, but their incorporation into the planning process might vary based on interest and relevance. The absence of certain topics doesn't diminish their importance; rather, it reflects the reality that in planning, trade-offs necessitate prioritizing certain aspects over others.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

State Requirements for Electric Distribution System Planning

Utilities have conducted distribution planning since they first began building and operating electricity systems. But filing these plans for regulatory and stakeholder review is a relatively recent phenomenon. This report summarizes legislative and regulatory requirements for regulated electric utilities to file some type of distribution system plan in 20 U.S. jurisdictions. Some plans focus on expedited cost recovery for certain types of distribution system improvements; other plans focus on investments for grid modernization or distributed energy resources. Increasingly, states are adopting requirements for Integrated Distribution Plans. Such plans provide holistic grid investment strategies that address state and local policies and increasing complexity at the grid edge. The report covers the following topics for distribution system plans, highlighting advanced practices: -State goals and objectives -Procedural requirements -Forecasting loads and distributed energy resources -Hosting capacity analysis -Baseline information requirements -Grid modernization strategy -Grid needs assessment -Non-wires solutions -Reliability and resilience analyses -Stakeholder engagement -Equity -Pilots -Coordination with other planning processes The report includes links to legislation; regulatory requirements, proceedings, and orders; and filed utility plans. The U.S. Department of Energy’s Office of Electricity provided funding support.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Distribution System Planning with DERs - High-level Assessment of Tools and Methods

This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts and emerging research opportunities in Vehicle-Grid Integration for transportation: A review

This review provides a comprehensive examination of Vehicle-Grid Integration (VGI) technologies and their impacts on transportation systems, with a particular emphasis on the transportation-energy nexus. It systematically explores how VGI affects key transportation applications such as charging infrastructure planning, electric vehicle (EV) routing, smart charging coordination, shared mobility, and dynamic pricing. By synthesizing recent literature from both transportation and energy systems perspectives, this study highlights how advanced methodologies, such as reinforcement learning, game theory, and optimization techniques, are used to model the complex interactions between EVs, mobility patterns, and distributed energy systems. Furthermore, the review also identifies critical challenges, including behavioral factors, data limitations, and system scalability. Drawing on these insights, the paper outlines emerging research opportunities to support the design of integrated, resilient, and user-centric VGI solutions that advance sustainable mobility and energy system efficiency.

Charging coordination↗

End-Use Load Profiles for the U.S. Building Stock: Practical Guidance on Accessing and Using the Data

This report describes example applications and considerations for using the National Renewable Energy Lab’s ResStock and ComStock end use load profiles (EULP). The report begins with an introduction to the three year project, and then provides instructions on accessing the EULP data and considerations for using the EULP and limitations of the data. The remainder of the report is on EULP use cases, including a variety of electricity planning use cases.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Block Island’s Energy Roadmap to 2040

This report documents an electricity planning study "Energy Roadmap to 240" for the community of New Shoreham, Rhode Island (aka Block Island), conducted under the U.S. Department of Energy (DOE) Energy Technology Innovation Partnership Project (ETIPP) by a national laboratory analysis team comprising staff from Lawrence Berkeley National Laboratory.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Greenhouse Gas Life Cycle Emissions Assessment Model (GLEAM) Model Documentation

The Greenhouse gas Life cycle Emissions Assessment Model (GLEAM) estimates life cycle greenhouse gas emissions from future scenarios of electricity generation considering a wide range of generation technologies. Building on the National Laboratory of the Rockies longstanding effort to quantify life cycle emissions by electricity generation technology under the LCA Harmonization Project, GLEAM streamlines the process of estimating cumulative greenhouse gas emissions on a life cycle basis. Given a set of inputs regarding annual installed and decommissioned generation capacity, as well as generation, GLEAM estimates the carbon dioxide equivalent emissions by year. The model also offers optional modules to decompose carbon dioxide equivalent emissions into constituent greenhouse gases (e.g., carbon dioxide, methane, and nitrous oxide) as well as estimate hydrogen leakage from relevant technologies. The results from GLEAM can be used to inform future electricity planning scenarios as well as investment or regulatory decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Models for Electrical Distribution Network Planning and District-Scale Building Energy Use

The increase of greenhouse emissions caused by a rise in global energy consumption is pushing the scientific community to develop tools that address key environmental, techno-economic and social issues. One specific area of focus is to create tools that enable the design of high-performance energy districts, including grid-interactive efficient buildings and electrical distribution infrastructure. This paper outlines the approach of integrating a synthetic distribution network tool (RNM-US) with URBANopt™, a modular and customizable software development kit for thermal and electrical modelling of buildings and energy systems at a district scale. First, we describe the algorithms implemented to integrate RNM-US with URBANopt to automatically generate the distribution network for the district considered. Following, we present a case study for the potential uses of the RNM-US integrations with URBANopt, highlighting the capabilities for economic and technical analysis of the distribution network built in relation to the electricity needs of the modelled buildings.

30 DIRECT ENERGY CONVERSION↗

Michigan Hydrogen and Fuel Cell Electric Vehicle Deployment Plan: H2 FCEV Roadmap 2022

This report describes a roadmap for hydrogen fuel cell electric vehicles in the state of Michigan. This plan provides links to relevant information to assess, plan, and initiate hydrogen and FCEV deployment to help meet the energy, economic, and environmental goals for the State of Michigan. Policies and incentives that support hydrogen and fuel cell technology will increase deployment, thus increasing production and creating jobs throughout the supply chain. As deployment increases, an economy of scale will develop and manufacturing costs will decline, positioning hydrogen and fuel cell technology to compete more effectively in a global market without incentives. Policies and incentives to purchase and support the deployment of FCEVs, FCEBs, and hydrogen refueling can be coordinated regionally to maintain this advanced clean transportation sector as a global exporter for long-term growth and economic development. Overall, the execution of this plan will maintain Michigan's role as a global showcase for regionally manufactured transportation technology while reducing NOx and CO 2 emissions and as new jobs are created for businesses and industry.

08 HYDROGEN↗

A Vehicle-to-Grid planning framework incorporating electric vehicle user equilibrium and distribution network flexibility enhancement

The rapid surge in electric vehicle (EV) adoption, coupled with advancements in charging technologies, emphasizes the critical necessity for expanding EV recharging infrastructure. Simultaneously, the Distribution Network (DN) encounters escalating challenges in meeting charging demand during peak traffic periods. Consequently, there is a mounting demand for the deployment of innovative Vehicle-to-Grid (V2G) technologies to augment the DN’s flexibility in power dispatch and alleviate travel costs for EV users. Hence, this paper proposes an EV-user-equilibrium-(UE)-constrained V2G planning framework that enhances flexibility in the DN. The framework aims to ascertain the optimal placement and capacity of EV charging stations (EVCSs) and V2G charging piles within the Transportation Network (TN). It takes into account the equilibrium condition stemming from competitive EV charging and routing behaviors alongside the optimal expansion of DN energy resources to accommodate the electricity supplied by the V2G piles. This study commences by analyzing EV drivers’ travel decisions, considering the influence of charging and V2G pile locations and sizes. Subsequently, we tackle the Traffic Assignment Problem with User Equilibrium (TAP-UE) model to characterize the steady-state traffic flow distribution of EVs. Following this, we formulate the optimization model for the Coordinated Power and Transportation Network (CPTN), which encompasses the optimal expansion of DN facilities and traffic flow regulation under UE conditions. To mitigate the computational complexity associated with the V2G planning model, we introduce a series of linearization methods to obtain a manageable Mixed-Integer Linear Programming (MILP) solution. Finally, to validate the efficacy of our proposed planning framework, we apply it to two test systems, including a real-world case study. Through these case studies, we explore the necessity and potential benefits of V2G technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Five Year Wildfire Risk Reduction Action Plan for the Electric Power Industry

The U.S. DOE and the Electric Power Research Institute convened a wildfire advisory group to bring together knowledge of ignition risks, electric utility needs, the applicability of available technology, and existing technology gaps. The outcome is a five-year action plan, containing recommendations on RD&D projects, that if completed by the year 2030, may accelerate the power industry’s ability to substantially reduce wildfire ignition risks. When reviewing this document please consider it is a snapshot in time for the years 2023 and 2024, could be obsolete by the end of the decade. The following list comprises the titles and topics for the proposed follow-on demonstrations: 1. Hybrid Undergrounding RD&D, 2. Live Downed Conductor Detection RD&D, 3. Fault Energy Reduction RD&D, 4. Advanced Inspection and Response Drone, 5. Fault and PQ Event Signature Repository, 6. Advanced and Intelligent Sensor Nodes, 7. Fire Friendly Asset Coatings and Coverings, and 8. Environmental Monitoring Action Plan.

24 POWER TRANSMISSION AND DISTRIBUTION↗