Search NASA⌕ Search

SEARCH · Search NASA

Results for “employee training”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Medical examinations for radiation workers

The NASA radiological protection policy allows an employee to be assigned work in a radiologically controlled area only if all of the following conditions are met: (1) The area must be radiologically safe for the intended operations; (2) the employee must be medically fit; (3) the employee must be properly trained; (4) appropriate radiation protection procedures must be prepared; (5) appropriate dosimetric, survey, surveillance and reporting procedures must be implemented; and (6) adequate controls and records must be established.

Alexander, R. E.↗

The Process of the Development of an Operator

On the job training is where new employees called operators can start gaining knowledge on what they will be working on during their time in JSC. In these lessons I learned different things that are important ranging from thermal systems to electrical systems. While doing OJT classes the student will learn how to use a portable computer system which has displays that I also helped edit and clean up. The way you can also learn is by reading system briefs which describes the different systems. Due to the fact of a possible change in the ISS I updated a systems brief so that it can be relevant to what is actually on the space station. I was given a task that will help develop my skills and make myself better prepared for my future in the work field. The project that I worked on had me pulling real time data from the International Space Station. The Data I obtained from the space station will be correlated to battery performance. The group I will be working which is called REBA and we will take the telemetry and evaluate the data. I will be working with my mentor Ben Chislom and co-op Tyler along with the Pro team. They then will put this data into a graph so that they can get the discrepancies and find a way to improve the battery performance. The first weeks I read familiarization books that informed me how the ISS works, how it was built, and the systems that are used to keep the station working. This project is going to benefit NASA by finding out how electricity is being used on the ISS and enabling us to see how it can be used more efficiently. This way we can operate the ISS without wasting power. While conducting research that goes on inside the space station knowing all electricity is being used efficiently.

Banks, Terrence↗

Pathways Intern Report

The National Aeronautics and Space Administration (NASA) provides a formal training program for prospective employees titled, Pathways Intern Employment. The Pathways program targets graduate and undergraduate students who strive to become an active contributor to NASA's goal of space exploration. The report herein provides an account of Daniel Huggett's Pathways experience for the Spring and Summer 2017 semesters.

Pathways Program↗

Evolution of area access safety training required for gaining access to Space Shuttle launch and landing facilities

Assuring personnel and equipment are fully protected during the Space Shuttle launch and landing operations has been a primary concern of NASA and its associated contractors since the inception of the program. A key factor in support of this policy has been the area access safety training requirements for badging of employees assigned to work on Space Shuttle Launch and Facilities. This requirement was targeted for possible cost savings and the transition of physical on-site walkdowns to the use of television tapes has realized program cost savings while continuing to fully satisfy the area access safety training requirements.

Willams, M. C.↗

The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (≥ 5) and mass (≥ 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

Graham, L.↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

A Comprehensive Approach to Management of Workplace and Environmental Noise at NASA Lewis Research Center

NASA Lewis Research Center is home to more than 100 experimental research testing facilities and laboratories, including large wind tunnels and engine test cells, which in combination create a varied and complex noise environment. Much of the equipment was manufactured prior to the enactment of legislation limiting product noise emissions or occupational noise exposure. Routine facility maintenance and associated construction also contributes to a noise exposure management responsibility which is equal in magnitude and scope to that of several small industrial companies. The Noise Program, centrally managed within the Office of Environmental Programs at LRC, maintains overall responsibility for hearing conservation, community noise control, and acoustical and noise control engineering. Centralized management of the LRC Noise Program facilitates the timely development and implementation of engineered noise control solutions for problems identified via either the Hearing Conservation of Community Noise Program. The key element of the Lewis Research Center Noise Program, Acoustical and Noise Control Engineering Services, is focused on developing solutions that permanently reduce employee and community noise exposure and maximize research productivity by reducing or eliminating administrative and operational controls and by improving the safety and comfort of the work environment. The Hearing Conservation Program provides noise exposure assessment, medical monitoring, and training for civil servant and contractor employees. The Community Noise Program aims to maintain the support of LRC's neighboring communities while enabling necessary research operations to accomplish their programmatic goals. Noise control engineering capability resides within the Noise Program. The noise control engineering, based on specific exposure limits, is a fundamental consideration throughout the design phase of new test facilities, labs, and office buildings. In summary, the Noise Program addresses hearing conservation, community noise control, and acoustical and noise control engineering.

Cooper, Beth A.↗

Onboarding in a Virtual Environment

A need for a standardized Division 10000 onboarding program for virtual hires was identified by management to formalize the way employees and interns are onboarded and trained into Division 10000. This white paper provides effective short and long-term suggestions in the efforts of improving virtual onboarding. Data suggests that remote work is going to become the forefront of many industry practices, which indicates the need of a standardized virtual onboarding practices. With our research, gap assessments, benchmarking, and conducting interviews both internally and externally, we found that clarity, culture, and connection proved to be the strongest solutions in order to maintain Sandia’s competitive edge and sustain workers both remote and in-person.

99 GENERAL AND MISCELLANEOUS↗

Support of the Massachusetts — NREL Wind Technology Testing Center (Cooperative Research and Development Final Report)

Under the shared-resources CRADA agreement, NREL will collaborate with the Massachusetts Technology Park Corporation, d/b/a Massachusetts Technology Collaborative (MTC), in its efforts to design, construct, and operate the Massachusetts-NREL Wind Technology Testing Center (WTTC), which is an advanced blade testing facility capable of testing blades up to at least 70 meters in length. The WTTC building will be owned and the facility operated by the MTC. In the CRADA, NREL agrees to provide certain capital equipment and certain NREL employees at the WTTC facility for training, commissioning, and continued technical assistance. In addition, NREL will provide one or more Laboratory staff to serve on any WTTC advisory committee, a no-cost license of the NREL blade-resonance fatigue testing technology (NREL Testing IP) and training to MA staff at the NREL blade test facilities in Colorado. MTC will provide all other resources necessary to design, construct, and operate the WTTC.

17 WIND ENERGY↗

An Investigation of Factors Affecting How Engineers and Scientists Seek Information

This study investigated how 872 US aerospace scientists and engineers select information carriers. When considering oral and written information carriers, the principle of least effort was supported with a strong preference for oral communication over written communication. In examining how the respondents select written carriers, the decision to use or not to use a written carrier was found to be primarily a function of the perceived importance of the carrier's information to a person's work. Task uncertainty and task complexity were found to be significant, but not the primary nor a totally consistent criteria. The perceived quality and accessibility of written carriers were not found significant. The findings reinforce the need for firms to hire knowledgeable employees, to provide them with comprehensive training programs, and to develop formal and informal communication networks.

Anderson, Claire J↗

Using the CYBER-Champ Model to Determine Cyber Competencies and Role Alignment

Cybersecurity roles, tasks, and skills are seen by many organizations as nonessential, abstract, or complicated. Although standards are in place, such as the National Institute of Standards and Technology (NIST) 800-181 document titled “Workforce Framework for Cybersecurity (NICE Framework)” available since September 2012, companies are still showing security vulnerabilities in their cyber networks (Hatzes, 2020). Barriers towards creating a cyber-ready workforce are not always due to a lack of resources, but often caused by organizational structure. The need for cyber-cognizant job postings, improved communication between Operational Technology (OT) and Information Technology (IT) employees, increases in staffing and funding for cyber teams, and better communication of standards and training can all contribute to increasing an organization’s cyber resilience. Cybersecurity Competency Health and Maturity Progression model (CYBER-CHAMP) is a model aimed at evaluating an organization’s structure and individual employee’s cyber knowledge and helps develop a plan to reach competency. This model was used to engage with organizations to promote proper cyber protocols and policies. The aim of this paper is to answer if it is possible for an organization to build a cyber-ready workforce by providing education and training options for current employees and prepare the future workforce to be ready on day one of employment. Both open source and firsthand interviews with organizations were used to conduct the research contained in this document. Further research may include additional development to the CYBER-CHAMP model and its delivery platform.

99 GENERAL AND MISCELLANEOUS↗

Flight Operations

Outline the process that takes new hires with zero knowledge all the way to the point of completing missions in Flight Operations. Audience members should be able to outline the attributes of a flight controller and instructor, outline the training flow for flight controllers and instructors, and identify how the flight controller and instructor attributes are necessary to ensure operational excellence in mission prep and execution. Identify how the simulation environment is used to develop crisis management, communication, teamwork, and leadership skills for SGT employees beyond what can be provided by classroom training.

Forest, Greg↗

NASA Procurement Career Development Program

The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

Source record↗

Crew Management Processes Revitalize Patient Care

In 2005, two physicians, former NASA astronauts, created LifeWings Partners LLC in Memphis, Tennessee and began using Crew Resource Management (CRM) techniques developed at Ames Research Center in the 1970s to help improve safety and efficiency at hospitals. According to the company, when hospitals follow LifeWings? training, they can see major improvements in a number of areas, including efficiency, employee satisfaction, operating room turnaround, patient advocacy, and overall patient outcomes. LifeWings has brought its CRM training to over 90 health care organizations and annual sales have remained close to $3 million since 2007.

Source record↗

A systematic approach to training: A training needs assessment

In an effort to determine the gap between the actual performance and the necessary performance of employees for the effective and efficient accomplishment of an organization's mission and goals, an organization-wide Training Needs Assessment must be conducted. The purpose of this work was to conduct a training needs analysis and prepare a NASA Langley Catalog of On-Site Training programs. The work included developing a Training Needs Assessment Survey, implementing the survey, analyzing and researching the training needs, identifying the courses to meet the needs, and preparing and designing an On-Site Training Catalog. This needs analysis attempted to identify performance weaknesses and deficits; seek out and provide opportunities for improved performance; anticipate and avoid future problems; enhance and create new strengths. The end product is a user-friendly catalog of on-site training available. The results include: top-down approach to needs assessment; improved communication with training coordinators; 98 percent return rate of the Training Needs Assessment survey; complete, newly designed, user-friendly catalog; 167 catalog descriptions advertised; 82 new courses advertised; training logo; and request for the training application form.

Manning, Margaret H.↗

Codename: Audacious Aardvark

In mid-August, nine members of the Federal Bureau of Investigation (FBI) joined nine LANL employees for a three-day cross-training drill in which FBI forensics experts would train fissile material handlers in the work of traditional forensics on nuclear components. The drill was called Audacious Aardvark, reflecting an aardvark’s diligence and fearlessness.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

White-collar productivity and quality issues; Proceedings of the Symposium on Productivity and Quality: Strategies for Improving Operations in Government and Industry, Washington, DC, September 25, 26, 1984

Techniques for improving the productivity of white-collar workers while maintaining high product quality are examined in reviews and reports. The emphasis is on the application of strategies developed in the private sector to government-agency and aerospace-industry operations. Topics discussed include international competition, organizational attitudes and orientation, management practices, education and training, renewing large organizations, encouraging innovation, national initiatives, employee involvement, management involvement, and applications of new technology.

Gerard, M.↗

Thermal Control of the Balloon-Borne HEROES Telescope

The High Energy Replicated Optics to Explore the Sun (HEROES) telescope is scheduled to fly on a high altitude balloon from Fort Sumner, New Mexico in the Fall of 2013. Once it reaches an altitude of 40km it will observe the Sun, Crab Nebula, and other astrophysical objects in the hard X-Ray spectrum (20-75keV) for around 28 hours. The HEROES project is a joint effort between Marshall and Goddard Space Flight Centers (MSFC and GSFC), and will utilize the High Energy Replicated Optics (HERO) telescope, which last flew in 2011 in Australia. The addition of new systems will allow the telescope to view the Sun, and monitor the mechanical alignment of the structure during flight. This paper will give an overview of the telescope, and then provide a description of the thermal control method used on HEROES. The thermal control is done through a passive cold-bias design. Detailed thermal analyses were performed in order to prove the design. This will be discussed along with the results of the analyses. HEROES is funded by the NASA Hands-On Project Experience (HOPE) Training Opportunity. The HOPE opportunity provides early career employees within NASA hands on experience with a yearlong flight project. HOPE was awarded by the NASA Academy of Program/Project and Engineering Leadership, in partnership with NASA's Science Mission Directorate, Office of the Chief Engineer, and Office of the Chief Technologist.

O'Connor, Brian↗