Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

MMS Extended Mission Design: Evaluation of a Lunar Gravity Assist Option

This paper will describe a study that was carried out on the design of a set of maneuvers that were considered for the later stages of an extended mission of the Magnetospheric Multiscale (MMS) mission. The goal of these maneuvers was to put MMS into a significantly different orbit from those flown heretofore, so allowing science collection in a different region of the magnetosphere. This study was made feasible by the fact that the rate at which fuel is being consumed to maintain small formations on the MMS high-apogee orbit is less than expected pre-flight: the current consumption rate is only about 2 kg/yr/spacecraft. In addition, the spacecraft finished the prime mission with a significant amount of fuel remaining: this was about 1-sigma above the mean when compared with pre-launch Monte Carlo simulations. The resulting situation is similar to that of a libration orbit mission, where station-keeping requires so little fuel that any margin at all will lead to an extensive mission lifetime. In the case of MMS, the spacecraft could, if desired, perform formation flying in the current orbit for several decades. Alternatively, the spacecraft could use a significant fraction of the remaining fuel to perform major orbit modifications, while still leaving enough to conduct formation flying for on the order of a decade. The extended mission maneuvers studied here are further apogee-raises, with the goal of setting up one or more lunar gravity assists. Geometry dictates that a lunar encounter is only achievable when the MMS apogee vector lies approximately in the lunar orbit plane: this limits the possible dates to mid-2021 or early 2027.

Design↗

Aqua Spacecraft Status Extended Mission

This will be presented at the Earth Science constellation Mission Operations Working Group meeting June 13-15, 2017 to discuss Aqua spacecraft status extended mission.

Aqua↗

GRGM900C: A Degree 900 Lunar Gravity Model from GRAIL Primary and Extended Mission Data

We have derived a gravity field solution in spherical harmonics to degree and order 900, GRGM900C, from the tracking data of the Gravity Recovery and Interior Laboratory (GRAIL) Primary (1 March to 29 May 2012) and Extended Missions (30 August to 14 December 2012). A power law constraint of 3.6 × 10(exp −4)/l(exp 2) was applied only for degree l greater than 600. The model produces global correlations of gravity, and gravity predicted from lunar topography of greater than or equal to 0.98 through degree 638. The model's degree strength varies from a minimum of 575-675 over the central nearside and farside to 900 over the polar regions. The model fits the Extended Mission Ka-Band Range Rate data through 17 November 2012 at 0.13 micrometers/s RMS, whereas the last month of Ka-Band Range-Rate data obtained from altitudes of 2-10 km fit at 0.98 micrometers/s RMS, indicating that there is still signal inherent in the tracking data beyond degree 900.

Gravity↗

Deep Space Network to Viking Orbiter telecommunications performance during the Viking extended mission, November 1976 - February 1978

The telecommunications performance during the Viking extended mission, starting with the completion of the first superior conjunction in November 1976 and ending with the jettison of the VO-2 aft bioshield early in March 1978 is discussed. Viking Orbiter activities and problems, the ground system activities and problems, radio science activities, and communication link performance are included. The substantial involvement of the Deep Space Network and the coordination of their telecommunication planners with Viking Project telecommunications analysts in the planning and execution of complex Viking Orbiter sequences are discussed.

Taylor, F. H. J.↗

A history of Mars atmospheric opacity in the southern hemisphere during the Viking extended mission

A history of developing opacity in the Mars southern hemisphere during the Viking extended mission has been compiled using orbiter images obtained at high altitude. Observations of changing contrasts under similar viewing conditions have been modeled by multiple-scattering intensity transfer equations that have produced a temporal description of changes in optical depth and particle-scattering properties within a network of control points. The results are presented in the form of Mercator and perspective plots for various dates.

Thorpe, T. E.↗

Trajectories for the Sakigake extended-mission phase

The trajectory profile that will be used by Japan's Sakigake spacecraft to accomplish its extended-mission objectives is described. Currently, Sakigake is following a heliocentric trajectory that will return to the earth's vicinity in January 1992. Four earth gravity-assist maneuvers are planned to redirect Sakigake to an encounter with Comet Honda-Mrkos-Pajdusakova (HMP) in February 1996. While carrying out the earth-swingby maneuvers, the spacecraft will make several passes through previously unexplored regions of the distant geomagnetic tail.

Farquhar, R.↗

Aura Extended Mission Plans

This will be presented at the Earth Science Constellation Mission Operations Working Group meeting June 13-15, 2017 to discuss the Aura extended mission plans.

summary of efforts↗

Operational Techniques for Dealing with Long Eclipses During the MMS Extended Mission

Launch window design for the Magnetospheric Multiscale (MMS) mission ensured that no excessive eclipses would be encountered during the prime mission. However, no orbit solutions exist that satisfy the eclipse constraints indefinitely: most extended mission years contain 1-3 eclipses long enough to potentially damage either the spacecraft or its scientific instruments. Two steps were taken to improve the situation. Firstly, raising apogee radius from 25 to 29.34 Earth radii altered the Sun-Earth-MMS phasing, so efficiently achieving reductions in the long eclipse durations. These maneuvers were performed early this year, in preparation for the first pair of long eclipses in August 2019. Secondly, a set of operational steps were taken around the time of the eclipses to help maintain spacecraft and instrument temperatures while preventing power load shedding. These operational steps included raising key onboard temperatures through adjusting the spacecraft attitude to tilt the instrument deck towards the Sun, and engaging select heaters prior to going into eclipses. In addition, all scientific instruments were turned off, as well as high-power, non-critical spacecraft systems, to conserve energy.These steps each came with trade-offs which will be discussed in the paper. Finally, the results that were obtained when the spacecraft experienced the first extremely long eclipses will be discussed, as will lessons learned for future long eclipses.

Williams, Trevor↗

Centaur zero gravity coast and engine restart demonstration on the Titan/Centaur (TC-2) extended mission

The Centaur propellant management and thermal control techniques required for zero gravity coasting were successfully demonstrated during an extended mission following spacecraft separation on the TC-2 flight. As part of the demonstration, two successful engine starts were accomplished. The first engine start followed a one-hour zero gravity coast, and the second engine start followed a three-hour zero gravity coast. All of the Centaur systems performed satisfactorily, the design parameters for zero gravity coasting were verified, and no significant problems were encountered. The flight results showed that the propellant location and behavior, propellant heating, and tank pressure rise rates observed during the zero-gravity coasts were less severe than expected. Consequently, the majority of the propellants remained at the tank bottom, the propellant collection times were very short, and more than 7 hours of coast could have been achieved before a tank venting was required. The tank pressurization prior to the engine starts provided boost pump Net Positive Suction Head values well in excess of the values required. The LO2 tank pressurization was accomplished by a new bubbler method that greatly reduced the helium usage.

Lacovic, R. F.↗

Gravity Recovery and Interior Laboratory (GRAIL): Extended Mission and End-Game Status

The Gravity Recovery and Interior Laboratory (GRAIL) [1], NASA s eleventh Discovery mission, successfully executed its Primary Mission (PM) in lunar orbit between March 1, 2012 and May 29, 2012. GRAIL s Extended Mission (XM) initiated on August 30, 2012 and was successfully completed on December 14, 2012. The XM provided an additional three months of gravity mapping at half the altitude (23 km) of the PM (55 km), and is providing higherresolution gravity models that are being used to map the upper crust of the Moon in unprecedented detail.

Zuber, Maria T.↗