Search NASA⌕ Search

SEARCH · Search NASA

Results for “gateway”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

The Gateway as a Building Block for Space Exploration and Development

The Gateway, which will be a small, human-tended space station in orbit around the Moon, is an example of the building block approach to space exploration and development. The National Aeronautics and Space Administration (NASA) leads the Gateway Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners. Gateway is a cornerstone of deep space human exploration, one critical element of the strategies and architectures that will enable human exploration of the solar system. This paper will outline: 1) The concept of operations and describe how Gateway is a multipurpose space station, supporting lunar surface missions, cis-lunar research, and as a proving ground for human missions to Mars; 2) Gateway’s international partnerships as an expansion of the partnerships of the “second generation of space programmes,” namely the International Space Station (ISS); and 3) Future commercial, scientific, and technology demonstration opportunities that this infrastructure building block provides. Lastly, the strategies and architectures for future space exploration and development must include thoughtful approaches to the management and business operations of government space programs. This includes planning for limited outyear growth in budgets, partnership and acquisition strategies, pursuing public-private partnerships and the use of firm-fixed price contracts, enabling vendor-to-vendor relationships, the use of multilateral interoperability standards, and incorporating key lessons learned from prior governmental Programs. This paper will discuss the strategies and approaches undertaken when establishing the Gateway Program at the NASA Johnson Space Center in 2019 and the current operational status of this new, lean, and efficient Program.

Gateway↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from previous PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

The Gateway as a Building Block for Space Exploration and Development

The Gateway, which will be a small, human-tended space station in orbit around the Moon, is an example of the building block approach to space exploration and development. The National Aeronautics and Space Administration (NASA) leads the Gateway Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners. Gateway is a cornerstone of deep space human exploration, one critical element of the strategies and architectures that will enable human exploration of the solar system. This paper will outline: 1) The concept of operations and describe how Gateway is a multi-purpose space station, supporting lunar surface missions, cis-lunar research, and as a proving ground for human missions to Mars; 2) Gateway’s international partnerships as an expansion of the partnerships of the “second generation of space programmes,” namely the International Space Station (ISS); and 3) Future commercial, scientific, and technology demonstration opportunities that this infrastructure building block provides. Lastly, the strategies and architectures for future space exploration and development must include thoughtful approaches to the management and business operations of government space programs. This includes planning for limited outyear growth in budgets, partnership and acquisition strategies, pursuing public-private partnerships and the use of firm-fixed price contracts, enabling vendor-to-vendor relationships, the use of multilateral interoperability standards, and incorporating key lessons learned from prior governmental Programs. This paper will discuss the strategies and approaches undertaken when establishing the Gateway Program at the NASA Johnson Space Center in 2019 and the current operational status of this new, lean, and efficient Program.

Gateway↗

Gateway Program Status and Overview

This paper provides an overview and status of Gateway, which will be an outpost orbiting the Moon that provides vital support for a sustainable, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis program. Gateway is a destination for deep space crew expeditions and science investigations, as well as a port for deep space transportation – for landers en route to the lunar surface or spacecraft embarking to destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and serves as the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of each component of Gateway: The Power and Propulsion Element, the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; an Airlock; and Exploration ExtraVehicular Activity (xEVA). Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on ISS, Gateway is an evolution of this extraordinary partnership that leverages the capabilities of each partner to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple international partners, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Nuclear Science User Facilities High Performance Computing: Provide a Science Gateway for HPC Users

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities (NSUF), provides direct access to the Barracuda Virtual Reactor and 18 Multiphysics Object-Oriented Simulation Environment (MOOSE) applications via a web-based science gateway developed using Open Ondemand on the INL high performance computing (HPC) systems. This gateway features the computational tools of the Nuclear Computational Resource Center (NCRC) and the computing resources of the INL high performance computing systems. These computational tools are a key foundation of collaboration and innovation in nuclear energy systems research. High performance computing resources and INL staff directly support the mission and objectives of DOE-NE. The Barracuda Virtual Reactor was the first science gateway deployed in Jan 2021 to support NSUF users. In July 2021, the science gateway was expanded to support access to NCRC codes for use across all supported INL HPC systems. The HPC science gateway currently supports 20 total applications. The gateway also includes access to training resources specific to NCRC tools.

99 GENERAL AND MISCELLANEOUS↗

Gateway Modeling and Simulation Plan

This plan institutes direction across the Gateway Program and the Element Projects to ensure that Cross Program M&S are produced in a manner that (1) generate the artifacts required for NASA-STD-7009 compliance, (2) ensures interoperability of M&S exchanged and integrated across the program and, (3) drives integrated development efforts to provide cross-domain integrated simulation of the Gateway elements, space environment, and operational scenarios. This direction is flowed down via contractual enforcement to prime contractors and includes both the GMS requirements specified in this plan and the NASASTD- 7009 derived requirements necessary for compliance. Grounding principles for management of Gateway Models and Simulations (M&S) are derived from the Columbia Accident Investigation Board (CAIB) report and the Diaz team report, “A Renewed Commitment to Excellence.” As an outcome of these reports, and in response to Action 4 of the Diaz team report, the NASA Standard for Models and Simulations, NASA-STD-7009 was developed. The standard establishes M&S requirements for development and use activities to ensure proper capture and communication of M&S pedigree and credibility information to Gateway program decision makers. Through the course of the Gateway program life cycle M&S will be heavily relied upon to conduct analysis, test products, support operations activities, enable informed decision making and ultimately to certify the Gateway with an acceptable level of risk to crew and mission. To reduce risk associated with M&S influenced decisions, this plan applies the NASA-STD-7009 requirements to produce the artifacts that support credibility assessments and ensure the information is communicated to program management.

NASA-STD-7009↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

The Gateway Program as Part of NASA’s Plans for Human Exploration Beyond Low Earth Orbit

This paper provides an overview and status of Gateway, humanity’s first space station in lunar orbit as a vital component of the NASA-led Artemis missions to return humans to the Moon as preparation for the first human missions to Mars. Gateway is an aggregation point in deep space for a variety of spacecraft, including the crewed Orion vehicle, the Human Landing System that will ferry astronauts to and from the lunar surface, logistics supply craft, and vehicles transiting further into deep space beyond the Earth-Moon system, such as to Mars. NASA is building on decades of partnership with space agencies on three continents and multiple commercial partners to design, build, and launch Gateway’s core elements to near-rectilinear halo orbit (NRHO) around the Moon, where it will operate for a minimum of 15 years. Gateway is humanity’s next in-space science utilization platform, and its first in deep space, with three science payloads already selected to study solar and cosmic radiation. This paper will provide an overview of the Gateway space station’s major components in various stages of development, including the Power and Propulsion Element (PPE), Habitation and Logistics Outpost (HALO), the International Habitation (I-Hab) module, ESPRIT Refueling Module (ERM), the planned airlock, advanced external robotics systems, Deep Space Logistics supply craft, and next-generation autonomous Vehicle System Manager software. It will also provide an overview of how Gateway will be utilized for science, and highlight the space station’s multilateral governance structure and international agreements.

Emma Lehnhardt↗

The Artemis Gateway as a Cislunar Science Platform

The Artemis Gateway is a lunar orbiting platform that will enable a sustainable human presence on and around the Moon beginning in this decade. Along with serving as a habitat for astronauts in support of lunar landing missions, Gateway provides a unique opportunity for science and research within cislunar space, from human health to space weather, with an eye toward deep space human space flight. Payloads are planned to be manifested on a rotating basis both internally and externally on the Gateway as well as on visiting Logistics Modules. Similar to the International Space Station, the Gateway benefits from significant international cooperation, and partnering agencies are collaborating to facilitate multilateral research across disciplines. We will present an overview of the Gateway mission and its unique capabilities and rich exploration space.

Gateway↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion↗

Gateway Integrated Environmental Control and Life Support System Overview and Status

The Gateway will be a lunar orbiting platform that is a critical element in establishing a sustainable, long-term human presence on the lunar surface and beyond to deep space exploration. As part of this mission, the Gateway Environmental Control and Life Support Subsystem (ECLSS), employs its capabilities to: - Support two to four-person crew expeditions for at least 30 days, approximately once every one to three years with extended periods of dormancy, - Provide life support functionality during nominal and contingency scenarios, - Support crew expeditions to the Lunar surface by providing a Habitable volume, from which staging, or preparation can take place for missions to the Lunar surface or to deep space destinations, and - Facilitate a platform to demonstrate the necessary capabilities to expand a sustainable human presence into Deep Space, including the surface of the Moon and Mars. The Gateway consists of an assembly of modules provided by commercial and international partnerships with varied capability that, together, achieve these objectives. The Habitation and Logistics Outpost (HALO) and International Habitat (I-Hab) modules provide the air revitalization and conditioning capabilities for the Gateway with some ECLSS functionality provided in the other modules to support crew operations. This paper explains the architecture of the Gateway ECLSS and provides the status of its development.

Gateway↗

Gateway Induced Environments Overview

Gateway will be a long duration space station orbiting the Moon in support of NASA’s Artemis campaign. Over its lifetime, Gateway will be exposed to a variety of induced environments, including materials outgassing, chemical and electric thruster plumes, vacuum vents, and lunar dust transport (from the Human Lander System, HLS). Induced Environments can impact vehicle performance and mission success. The multidisciplinary Gateway Induced Environments Team has developed requirements and methodologies to address the complex challenge of integrating multiple elements and visiting vehicles while maintaining the Gateway induced environments within prescribed limits. The Gateway Induced Environments requirements are summarized along with the integration / verification process and preliminary system analysis results.

Gateway↗

Gateway Induced Environments Overview

Gateway will be a long duration space station orbiting the Moon in support of NASA’s Artemis campaign. Over its lifetime, Gateway will be exposed to a variety of induced environments, including materials outgassing, chemical and electric thruster plumes, vacuum vents, and lunar dust transport (from the Human Lander System, HLS). Induced Environments can impact vehicle performance and mission success. The multidisciplinary Gateway Induced Environments Team has developed requirements and methodologies to address the complex challenge of integrating multiple elements and visiting vehicles while maintaining the Gateway induced environments within prescribed limits. The Gateway Induced Environments requirements are summarized along with the integration / verification process and preliminary system analysis results.

Gateway↗

Gateway Integrated Environmental Control and Life Support System (ECLSS) Overview and Status

The Gateway comprised of modules provided by commercial and international partners will be a lunar orbiting platform that is a critical element in the Moon to Mars architecture. Of the 4 modules that comprise the Gateway, the core Environmental Control and Life Support System (ECLSS) is provided by the Habitation and Logistics Outpost (HALO) module provided by NASA, and the International Habitat (I-Hab) provided by the European Space Agency (ESA) with the ECLSS provided by the Japanese Space Agency (JAXA). These modules work together to provide pressure control, air revitalization, and air conditioning capabilities for the Gateway integrated habitable volumes and attached visiting vehicles during open hatch crewed operations. Individually, they maintain the internal atmosphere during the long periods of dormancy between crewed operations to support payload operations and ensure a safe environment when the crew returns. Additionally, NASA bolsters crew survivability by providing government furnished equipment (GFE) to support crew survival in the face of catastrophic hazards (such as fire or a cabin air leak) until the Gateway stack reaches a point in the orbit where crew can safely abort on Orion. This paper explains the key driving requirements, architecture, and development status of the Gateway ECLSS.

Gateway↗

Gateway Utilization Town Hall

Includes multiple presentations to be given at the Gateway Utilization Town Hall on January 31, 2024. - Artemis and Gateway Overview - Gateway Science Utilization Strategy - JAXA Gateway Utilization - Participation Opportunities (ESA) - Gateway Capabilities for Science Utilization

Artemis and Gateway Science Utilization↗

Synchronizing the Cosmos: The Critical Role of Timekeeping Systems in Gateway's Operational Success

This paper explores the critical role of Universal Spacecraft Time (UST) in the operation of National Aeronautics and Space Administration’s (NASA) Lunar Gateway, a central component of the Artemis program aimed at establishing a sustained human presence on the Moon and facilitating future manned missions to Mars. With the Gateway's design incorporating advanced technologies such as Time-Triggered Ethernet (TTE) for network synchronization, the distinction between network time and UST becomes paramount. UST, defined via the Network Time Protocol (NTP), is essential for coordinating the myriad of operations within the Gateway, from life support systems to scientific experiments. Additionally, the paper will define Mission Elapse Time (MET) and network time, delving into their use and applications within the Gateway framework. This examination provides an in-depth analysis of the challenges in space timekeeping, the implementation and management of UST, MET, and network time, and their pivotal roles in ensuring mission success. Through the precise synchronization of the Gateway's operations, these timekeeping systems not only address the unique temporal dynamics of space travel but also enhance operational efficiency and safety. The paper underscores the indispensable nature of precise timekeeping in the broader context of space exploration, highlighting its implications for future missions and the continued advancement of human capabilities beyond Earth.

Gateway↗

Gateway design specification for fiber optic local area networks

This is a Design Specification for a gateway to interconnect fiber optic local area networks (LAN's). The internetworking protocols for a gateway device that will interconnect multiple local area networks are defined. This specification serves as input for preparation of detailed design specifications for the hardware and software of a gateway device. General characteristics to be incorporated in the gateway such as node address mapping, packet fragmentation, and gateway routing features are described.

Source record↗