Search NASA⌕ Search

SEARCH · Search NASA

Results for “geomechanical risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

50 records · Page 3

SMART Deliverable 6.1.2a: Application of the ORION tool to the IBDP Carbon Storage Site

Forecasting and managing potential induced seismic activity is one of the challenges facing commercialscale geologic carbon sequestration (GCS), as well as other geologic energy extraction and byproduct disposal technologies. Historically, the process to develop robust, science-based forecasts of induced seismicity has required an integrated effort from experts in seismology, geomechanics, and reservoir engineering to manage data, develop and evaluate models of subsurface processes, and to calibrate and interpret the results from a range of models to understand site behavior relative to prescribed standards and in the context of uncertainty in geologic characterization data, forecasting models, and operational scenario uncertainty. The Operational Forecasting of Induced Seismicity (ORION) toolkit is an open-source, observation-based forecasting toolkit that is being co-developed by two U.S. DOE-funded initiatives: the National Risk Assessment Partnership (NRAP) and the Scienceinformed Machine Learning for Accelerating Real Time Decisions in Subsurface Applications (SMART) Initiative. ORION is designed to provide functionality to support decision making about seismic hazard analysis and risk management for GCS stakeholders ranging from the public to site operators to expert seismologists. The tool, which is written as open-source code in the Python programming language, is composed of a desktop graphical user interface (GUI) and an underlying forecasting engine. The forecasting engine uses available reservoir properties, well and fluid injection scenario details, and observed seismic catalog data as inputs to produce a set of temporal and spatio-temporal seismic forecasts.

58 GEOSCIENCES↗

Geomechanical Characterization of the Mount Simon Sandstone and Eau Claire Formation of Northern Illinois Basin

The purpose of this paper is to analyze publicly available geomechanical data from two carbon storage sites in the Illinois Basin: the Illinois Basin-Decatur Project (IBDP) in Macon County, IL and the FutureGen2.0 project in Morgan County, IL, cancelled before injection began. This study estimates the magnitudes and directions of the least compressive principal stress gradient using hydraulic fracture-based stress measurement tests, borehole breakouts, and sonic logs in the Eau Claire Formation (primary confining zone) and the Mount Simon Sandstone (targeted reservoir). The range of stresses expected in the underlying Precambrian basement is also investigated. The evaluation of the state of stress is carried out in a probabilistic manner using the State of Stress Analysis Tool (SOSAT) developed under the National Risk Assessment Partnership (NRAP) program. Finally, the paper also provides a discussion on distinctions between fracture initiation pressure, propagation pressure, and fracture closure pressure, given that hydraulic fracture testing results show a significant difference between these three values. The discussion also addresses why the fracture closure pressure should be preferred in injection pressure determinations, a critical point in geological carbon storage projects.

de Toledo Camargo, Julia↗

Wellbore Stability and Mud Loss Management in Geothermal Drilling: Optimizing Mud Weight to Mitigate Tensile Wellbore Fracturing at The Geysers, California

As part of a U.S. Department of Energy (DOE) Geothermal Technologies Office-funded initiative, Geysers Power Company, LLC, a subsidiary of Calpine Corporation, has been working to enhance drilling performance at the world’s largest geothermal field, The Geysers, in northern California. In a recent drilling operation of the GDC-36 well, excessive mud losses were encountered, initially addressed through repeated but largely ineffective cement plugging. Ultimately, the most effective strategy was to drill blind through the loss zones, made feasible by the high rate of penetration (ROP) achieved with PDC bits, allowing significant progress before the mud tanks were depleted and water-sensitive argillic formation layers could collapse. In response to these challenges, the project team explored alternative methods to minimize downtime and risks associated with cement plugging and continuous mud loss and to contemplate the driving mechanisms for the losses. Wellbore imaging using Formation MicroImager (FMI) and Ultrasonic Borehole Imager (UBI) tools revealed longitudinal tensile fractures, which were attributed to mud weights exceeding the minimum circumferential stress resulting from the native stress field and formation pressure. This study examines the mud losses encountered and leverages wellbore imaging data to understand the mechanisms behind mud induced tensile fracturing in specific rock facies. Understanding fracture behavior across different lithologies is crucial, as fractures within the reservoir can enhance steam migration throughout the system. The reservoir at The Geysers lies within the Mesozoic Franciscan Assemblage, a tectonic mélange formed by subduction. It consists of metamorphosed turbidite sandstone (greywacke) and mudstone (argillite), oceanic upper crust (including greenstone and chert), and serpentinized ultramafic rocks - each exhibiting distinct geomechanical fracturing properties. The structural fabric of the Franciscan Assemblage was shaped by low-angle Mesozoic thrust faulting and later overprinted by sub-vertical strike-slip structures related to the Pacific-North American plate boundary. A wellbore stability model was developed using core measurements and logs to simulate fracturing scenarios during drilling under varying stress conditions. These simulations guided the development of an optimized mud weight management strategy that should enable adaptive adjustments during drilling, reducing the likelihood of tensile fracturing and mud losses, ultimately improving operational efficiency.

15 GEOTHERMAL ENERGY↗

Advanced Geomechanical Model to Predict the Impact of CO2-Induced Microstructural Alterations on the Cohesive-Frictional Behavior of Mt. Simon Sandstone

We investigated the influence of CO2-induced geochemical reactions on the cohesive-frictional properties of host rock within the context of CO2 storage in a saline aquifer and focused on the Mt. Simon sandstone. The research objective was to model geo-mechanical changes due to host rock exposure to CO2-saturated brine while accounting for heterogeneity, double-scale porosity, and granular structure. We formulated a three-level multi-scale model for host rocks. We conducted scanning electron microscopy analyses to probe the microstructure and grid nanoindentation to measure the mechanical response. We derived new nonlinear strength upscaling solutions to correlate the effective strength characteristics and the macroscopic yield surface to the micro-structure at the nano-, micro-, and meso-scales. Specifically, our theoretical model links CO2-induced microstructural alterations to a reduction in the size of the yield surface, and a drop in the value of the friction coefficient. In turn, regarding the Illinois Basin Decatur Project, the CO2-induced drop in friction coefficient is linked to an increase in the risk of fault slip and a higher probability of induced microseismicity during and after the end of CO2 underground injection operations. The theoretical model presented is essential for the geo-mechanical modeling of CO2 underground injection operations at multiple length-scales.

58 GEOSCIENCES↗

2020 Annual Report of Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns. The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report includes an update to the baseline drawdowns for each cavern, and provides an initial assessment of the evolution of drawdown expenditure for several caverns

02 PETROLEUM↗

Williston Basin Resource Study for Commercial-Scale Subsurface Hydrogen Storage

This closeout presentation summarizes a Department of Energy–funded study that evaluated whether large amounts of hydrogen can be safely stored underground in the North Dakota portion of the Williston Basin. The project combined lab testing, computer simulations, and basin‑wide analysis to assess saline formations, depleted oil and gas reservoirs, and salt formations for hydrogen storage capacity, recovery, and risks. Results show that underground hydrogen storage is technically feasible across multiple formation types, with depleted oil and gas reservoirs offering higher recovery and saline formations providing large long‑term storage potential. The study also identifies key challenges—such as wellbore material durability and gas purity management—and recommends pilot projects and further site‑specific studies to support future commercialization.

08 HYDROGEN↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

Autonomous Inversion of In Situ Deformation Measurement Data for Injection-Induced Stress Change

Geologic carbon storage (GCS) is likely to play a key part of the global effort to dramatically reduce CO2 emissions and perhaps even reduce atmospheric CO2 concentrations through carbon negative operations. A critical part of effort to commercialize and widely deploy this technology is developing the capability to rapidly assimilate real-time monitoring data into a form that will enable site operators to make decisions to manage the safe and efficient operations. Two of the risks associate with GCS are the risk of inducing fractures in the sealing formations that can create leakage pathways and the risk of inducing earthquakes of sufficient magnitude to cause public concern, property damage, or safety risks. To properly manage these risks the site operator needs to know the initial state of stress, the change in stress induced by injection, and the relationship between operational parameters such as injection rate and pressure and the change in stress. Current methods of estimating the change in stress require choosing the type of constitutive model and the model parameters based on core, log, and geophysical data during the characterization phase, with little feedback from operational observations to validate or refine these choices. These characterization methods interrogate the geologic formations using length scales, loading rates or magnitudes that are quite different from those encountered by the actual storage system. It is shown that errors in the assumed constitutive response, even when informed by laboratory tests on core samples, are likely to be common, large, and underestimate the magnitude of stress change caused by injection. Recent advances in borehole-based strain instruments and borehole and surface-based tilt and displacement instruments have now enabled monitoring of the deformation of the storage system throughout its operational lifespan. This data can enable validation and refinement of the knowledge of the geomechanical properties and state of the system, but brings with it a challenge to transform the raw data into actionable knowledge. We demonstrate a method that uses automatic differentiation and a finite-element based geomechanical model perform a gradient-based deterministic inversion of geomechanical monitoring data. This approach allows autonomous integration of the instrument data without the need for time consuming manual interpretation and selection of updated model parameters. Furthermore, only isotropic linear elasticity is considered in this paper, the approach presented is very flexible as to what type of geomechanical constitutive response can be used. The approach is easily adaptable to nonlinear physics-based constitutive models to account for common rock behaviors such as creep and plasticity. The approach also enables training of machine learning-based constitutive models by allowing back propagation of errors through the finite element calculations. This enables strongly enforcing known physics, such as conservation of momentum and continuity, while allowing data-driven models to learn the truly unknown physics such as the constitutive or petrophysical responses.

Burghardt, Jeffrey A.↗

Improving Subsurface Stress Characterization for Carbon Dioxide Storage Projects by Incorporating Machine Learning Techniques

The overall objective of this project is to develop a framework for reliable characterization and prediction of the state of stress in the overburden and underburden (including the basement) in CO 2 storage reservoirs using machine learning and integrated geomechanics and geophysical methods. Specifically, we propose to develop workflow encompassing of technologies and/or methods to predict stress and pressure changes due to CO 2 injection in an active tertiary recovery site and their impacts on subtle fault activation, fractures and occurrence of microseismic events and compare responses to field observations. In this project, we anticipate using dataset from the Farnsworth field Unit (FWU) which is operated by Purdure Petroleum. A novel elastic-waveform VSP inversion technique will be used to estimate high-resolution spatial and temporal changes of elastic moduli in CO 2 storage reservoirs, which will be combined with velocity-stress relationship derived from laboratory tests to obtain subsurface pressure and stress. Clustered microseismic data will be jointly inverted for improved focal mechanisms. Least-squares reverse-time migration of microseismic waveform data will be performed to directly image fracture/fault zones. Additionally, a deep neural network machine learning technique with convolutional and recurrent layers will be used for learning the spectro-temporal structures in microseismic waveforms. The results of this geotechnical data analysis will be integrated to develop a high-resolution 3D mechanical earth model extending from the overburden sealing formations to the underburden including the basement. Mechanical properties will be derived through integration of mechanical logs, tests, available results from chemo-mechanical laboratory tests, and elastic inversion of seismic data using a combination of Bayesian and stochastic methods as well as machine learning technique. Failure features (faults/fractures) will be represented and/or modeled based on seismic and core data analysis. A transient hydrodynamic-geomechanical model will be developed through coupling with the calibrated FWU reservoir simulation model. The full physics coupled model will be used to train a reduced order proxy model using machine learning algorithm for estimating stress which will then be used with appropriate constitutive relationships and forward seismological models to simulate pressure changes and induced microseismicity. An advanced optimization framework will be developed to perform a history match to minimize error between field observations and simulated. The history matched proxy model will be verified against the full-physics equivalent. The field observations that will be used in the coupled model calibration process include pressure/stress inverted from VSP, moment magnitude from microseismic analysis, real time downhole pressure measurements, production and injection data. Parameter sensitivity and uncertainty analysis will be performed to characterize the impact of model parameter uncertainty on stress estimates. The proposed project will have significant impact on future field implementation of the proposed technology. Because the project field site is an ongoing CO 2 EOR development, the value of the new technology will be demonstrated in an operational context and evaluated as a viable risk mitigation strategy. Cost/benefit will be evaluated together with the various commercial incentives for CO 2 sequestration available to oil and gas operators. The extensive available dataset and ongoing data acquisition under the SWP Phase III work plan provides flexibility for investigation of multiple approaches and reduces technical risk.

58 GEOSCIENCES↗

Predicting Cement-Sheath Integrity with Consideration of Initial State of Stress and Thermoporoelastic Effects

In conventional wellbore-integrity analysis, the cement sheath’s initial state of stress and transient thermoporoelastic effects are often neglected. However, the initial state of stress is prerequisite information for accurately predicting the safe operating conditions that prevent a cemented well from being damaged. In addition, transient thermoporoelastic effects can have a profound effect on when damage will occur. Here in this paper, we propose a model that includes these effects to predict the safe operating pressures and temperatures that will prevent cement-sheath failure. For the initial state of stress, we proposed an empirical model using measurements. Subsequent stress changes are evaluated by a fully coupled transient thermoporoelastic model to analyze the mechanical behavior of the cement sheath. We predict the safe operating envelope (SOE) for shear, tensile, and debonding cement-sheath failures caused by pressure and temperature perturbations after the cement sets. Our model predicts that pore pressure is a key factor for cement failure, especially for rapid temperature changes. If the formation is low permeability, the transient pore pressures are amplified, causing the risk of damage to increase. Compared with conventional thermoelastic models, the thermoporoelastic model predicts a smaller SOE when heating the internal casing fluid and a larger envelope when cooling the internal casing fluid. Finally, the heating rate was considered with respect to field applications. The heating rate was also considered, and slower heating/cooling rates can prevent damage to the cement sheath. Finally, the thermoporoelastic model was applied to explain several laboratory and field experiments and achieved good matches.

02 PETROLEUM↗

Arctic Coastal Erosion: Modeling and Experimentation

Increasing Arctic coastal erosion rates have put critical infrastructure and native communities at risk while also mobilizing ancient organic carbon into modern carbon cycles. Although the Arctic comprises one-third of the global coastline and has some of the fastest eroding coasts, current tools for quantifying permafrost erosion are unable to explain the episodic, storm-driven erosion events. Our approach, mechanistically coupling oceanographic predictions with a terrestrial model to capture the thermo-mechanical dynamics of erosion, enables this much needed treatment of transient erosion events. The Arctic Coastal Erosion Model consists of oceanographic and atmospheric boundary conditions that force a coastal terrestrial permafrost environment in Albany (a multi-physics based finite element model). An oceanographic modeling suite (consisting of WAVEWATCH III, Delft3D-FLOW, and Delft3D-WAVE) produced time-dependent surge and run-up boundary conditions for the terrestrial model. In the terrestrial model, a coupling framework unites the mechanical and thermal aspects of erosion. 3D stress/strain fields develop in response to a plasticity model of the permafrost that is controlled by the frozen water content determined by modeling 3D heat conduction and solid-liquid phase change. This modeling approach enables failure from any allowable deformation (block failure, slumping, etc.). Extensive experimental work has underpinned the ACE Model development including field campaigns to measure in situ ocean and erosion processes, strength properties derived from thermally driven geomechanical experiments, as well as extensive physical composition and geochemical analyses. Combined, this work offers the most comprehensive and physically grounded treatment of Arctic coastal erosion available in the literature. The ACE model and experimental results can be used to inform scientific understanding of coastal erosion processes, contribute to estimates of geochemical and sediment land-to-ocean fluxes, and facilitate infrastructure susceptibility assessments.

54 ENVIRONMENTAL SCIENCES↗

Modeling supercritical CO2 injection induced rupture of a minor fault embedded in a poroelastic layered reservoir-caprock system

CO2 injection for geologic carbon sequestration involves hydromechanical processes that lead to changes in fluid pressure and stresses that can activate existing faults. This paper presents a new method and workflow of modeling fault activation considering more complex three-dimensional geometry of natural faults using the TOUGH-FLAC multiphase fluid flow and geomechanical simulator. In this method and workflow, FLAC3D mechanical interfaces and TOUGH3 finite volume elements are discretized using computer aided design and gridding software along with a tailored mesh translation routine. The method and workflow are demonstrated with a model of a curved minor fault embedded in a poro-elastic layered reservoir-caprock system. The model is used for a comprehensive sensitivity analysis of fault responses to fault length, injection mass rate, injection schedule, well-fault distance, and well locations versus fault location. Four metrics (CO2 plume, shear state of fault, pressure and stress path at fault monitoring points) are selected to assess CO2 migration, pressure change, and the reactivation of faults. The results reveal that CO2 can bypass around the tip of the minor impermeable fault, building up pressure and poro-elastic stress on both sides that tends to impede fault rupture. Our study shows the benefit of carefully designing the injection to achieve the targeted final storage volume, starting at a relatively low rate for considerable time, and then ramping up the injection rate to the full rate of injection. The initial low injection has two distinct benefits: (1) it allows for the formation of an extensive CO2 plume with a much higher mobility through a low viscosity that will result in a lower pressure for a given injection rate, and (2) it allows for gradual build-up of horizontal poro-elastic stress within the reservoir that will tend to impede activation of steeply dipping faults. The injection scenario starting at a low injection rate, denoted here as conservative injection, can significantly reduce the risk of fault activation as high fluid mobility and reservoir strengthening poro-elastic stress has been established long before reaching the peak injection rates. Moreover, simultaneous injection in two injection wells on both sides of fault can provide further reservoir strengthening through poro-elastic stress buildup acting on a fault under normal faulting stress regime. The findings presented in the paper can provide practical and effective guidance on long-term, safe, and reliable geological CO2 storage.

Cao, Meng↗

Nuclear Criticality Safety Assessment of Criticality Control Containers without Moderation Control at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) provides for safe, permanent disposal of government-owned transuranic (TRU) and TRU mixed wastes. Receipt and disposal of waste at the WIPP site began in March 1999. The Sandia report, Consideration of Nuclear Criticality When Disposing of Transuranic Waste at the Waste Isolation Pilot Plant, addressed potential nuclear criticality safety issues based on the projected inventory characteristics known at the time [1]. As designs for inventory, waste forms, and disposal packages have changed, new analyses have been performed, and updates have been made to address any potential effects to the WIPP safety basis. New analyses performed include Saylor 2017 [2] and Brickner 2019 [3], which address certain waste containers with specified loadings under post-closure conditions. Both examined several hypothetical scenarios and included analyses to bound (from a criticality potential standpoint) credible configurations that could occur at WIPP during the repository regulatory post-closure disposal time period for feature, event, and process (FEP) considerations—10,000 years. During this post-closure period at WIPP, the screening of FEPs is governed by the risk-based standards and implementing regulations of the US Environmental Protection Agency (EPA) (i.e., 40 CFR 191 and 40 CFR 194, respectively) [4,5]. An FEP screening can be based on either a low-consequence or low-probability rationale. A low-probability rationale includes either (a) a qualitative rationale that the FEP is not credible or (b) a quantitative demonstration that the probability is less than 10-4 in 104 years. In this evaluation, a qualitative lowprobability rationale of not credible is used by demonstrating that bounding configurations of the waste are not critical. The demonstration of subcriticality is through quantitative calculations, but a probability of criticality is not evaluated. Rather, the rationale for this evaluation is that bounding configurations with an effective neutron multiplication factor (keff) well below the upper subcriticality limit (USL) make criticality incredible. Reference [2] documented a nuclear criticality assessment of the WIPP repository for disposal of dilute surplus plutonium materials using the Dilute and Dispose Approach and packaging in criticality control overpacks (CCOs). The CCO is the waste disposal container recently designed to allow for up to 380 fissile gram equivalent (FGE) 239 Pu per drum, which is a higher fissile loading than typical waste containers. The CCO consists of a criticality control container (CCC) positioned by upper and lower plywood spacers within a standard 55 gal drum. The CCC is used to establish a geometry control for fissile materials during transportation and WIPP emplacement operations. The current WIPP waste acceptance criteria for CCO payloads limit beryllium to less than or equal to 1% by weight of the waste contents and require the waste form to be non-machine compacted. Reference [2] considered two scenario progressions—room closure from salt creep, hereafter referred to as the reconfigured dry scenario, and flooding with brine, hereafter referred to as the reconfigured wet scenario. The subsequent drying out of the reconfigured wet scenarios was also considered. For all scenarios, subcriticality was maintained when 50 g of B 4 C (acting as a neutron absorber) per CCC was intermixed within the plutonium disposition waste form. The analysis used a waste form description that limits the amount of moderation that could be present within the waste form (i.e., it limits the amount of water and polyethylene that could be present based on planned processing conditions). This analysis to evaluate increased limits on the amount of moderation that could be present was performed as a companion to Reference [2] to address concerns associated with verifying moisture and/or plastic contents of waste materials following packaging of dilute surplus plutonium in the CCO. To that end, this analysis used the models and methods from Reference [2] to evaluate a more generic base waste form consisting of water and polyethylene that is more similar (and nearly identical) to the generic waste forms utilized in other models/analyses supporting the TRU Package Transporter Model II (TRUPACTII) safety analysis [6] (all are without moderation controls). The waste form in this analysis uses a base mixture of 75% water and 25% polyethylene, the total amount of which is varied to determine the optimum moderation to fissile material (H/Pu) ratio. The fissile loading is maintained at up to 380 FGE 239 Pu (modeled as PuO 2 ) per CCO with an additional 545 g of beryllium (to bound the 1% by weight contents restriction) and 50 g of B 4 C intermixed per CCO. The beryllium content (1% by weight) is based on the total allowed waste weight (this does not include packaging and container weights). Figures ES-1 and ES-2 display summary results, showing that with this model including 50 g of B 4 C per CCO, the system keff remains under 0.85 for all moderator amounts and provides a significant margin against post-closure criticality under postulated bounding conditions for compaction. Figure ES-1 compares an infinite model with a room model at the initial emplacement spacing and under full radial compaction. Full radial compaction places each CCC in direct contact and does not credit any anticipated spacing associated with current post-closure geomechanical modeling of the repository [7]. The effects of variations in the H/Pu ratio were evaluated by varying the amount of the water/polyethylene component of the waste model, with fissile loading maintained at 380 239 Pu FGE. Similarly, Figure ES-2 illustrates how various amounts of B 4 C per CCO influence k eff at different radial compactions, all at the H/Pu ratio of 200 (in the room array model). Therefore, while the results from Saylor 2017 [2] modeled more realistic process limits associated with packaging of dilute surplus plutonium, this analysis demonstrates that limits on moderation (plastic and water content) are not necessary to ensure subcriticality in the WIPP repository, provided the requisite B 4 C absorber is present.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗