At least 55 records · Page 3

Quantifiably secure power grid operation, management, and evolution :

This report summarizes findings and results of the Quantifiably Secure Power Grid Operation, Management, and Evolution LDRD. The focus of the LDRD was to develop decisionsupport technologies to enable rational and quantifiable risk management for two key grid operational timescales: scheduling (day-ahead) and planning (month-to-year-ahead). Risk or resiliency metrics are foundational in this effort. The 2003 Northeast Blackout investigative report stressed the criticality of enforceable metrics for system resiliency the grid s ability to satisfy demands subject to perturbation. However, we neither have well-defined risk metrics for addressing the pervasive uncertainties in a renewable energy era, nor decision-support tools for their enforcement, which severely impacts efforts to rationally improve grid security. For day-ahead unit commitment, decision-support tools must account for topological security constraints, loss-of-load (economic) costs, and supply and demand variability especially given high renewables penetration. For long-term planning, transmission and generation expansion must ensure realized demand is satisfied for various projected technological, climate, and growth scenarios. The decision-support tools investigated in this project paid particular attention to tailoriented risk metrics for explicitly addressing high-consequence events. Historically, decisionsupport tools for the grid consider expected cost minimization, largely ignoring risk and instead penalizing loss-of-load through artificial parameters. The technical focus of this work was the development of scalable solvers for enforcing risk metrics. Advanced stochastic programming solvers were developed to address generation and transmission expansion and unit commitment, minimizing cost subject to pre-specified risk thresholds. Particular attention was paid to renewables where security critically depends on production and demand prediction accuracy. To address this concern, powerful filtering techniques for spatio-temporal measurement assimilation were used to develop short-term predictive stochastic models. To achieve uncertaintytolerant solutions, very large numbers of scenarios must be simultaneously considered. One focus of this work was investigating ways of reasonably reducing this number.

Gray, Genetha Anne.↗

Master-Slave Control Scheme in Electric Vehicle Smart Charging Infrastructure

WINSmartEV is a software based plug-in electric vehicle (PEV) monitoring, control, and management system. It not only incorporates intelligence at every level so that charge scheduling can avoid grid bottlenecks, but it also multiplies the number of PEVs that can be plugged into a single circuit. This paper proposes, designs, and executes many upgrades to WINSmartEV. These upgrades include new hardware that makes the level 1 and level 2 chargers faster, more robust, and more scalable. It includes algorithms that provide a more optimal charge scheduling for the level 2 (EVSE) and an enhanced vehicle monitoring/identification module (VMM) system that can automatically identify PEVs and authorize charging.

42 ENGINEERING↗

Analysis of Residential Time-of-Use Utility Rate Structures and Economic Implications for Thermal Energy Storage

Thermal energy storage (TES) is an increasingly popular tool to level out the daily electrical demand and add stability to the electrical grid as more intermittent renewable energy sources are installed. TES systems can locally decouple high thermal loads from the operation of a heat pump or reduce the electrical energy demand of the heat pump by providing a more favorable temperature gradient. In addition, many policy makers and utility providers have introduced time-of-use (TOU) rate schedules for residential customers to better reflect the price of electricity generation and demand for specific times. TOU rate schedules price grid-provided electricity differently throughout the day depending on the region’s climate, time of year, and electrical production. Large differences between on-peak and off-peak electrical prices may create an economic advantage for a residential customer to install a TES system. In this work, the economic and energy savings are calculated for a modeled 2,400 square foot residential building with water/ice-based TES using a TOU rate structure. The weather data is from Fresno County, CA, ASHRAE climate zone 3B, and a representative residential TOU utility rate structure from Pacific Gas and Electric (PG&E) was used. The results showed that total energy consumption could be reduced by 14.5% with an 87.5% reduction in on-peak energy usage when the TES is installed. The cost of operating this system for space cooling was reduced by nearly 20% using the sample utility rate plan.

Sultan, Sara↗

Pricing Strategy of Electric Vehicle Aggregators Based on Locational Marginal Price to Minimize Photovoltaic (PV) Curtailment

The global climate crisis demands urgent action to mitigate global warming. Using renewable energy sources, such as solar and wind power, for electricity generation is crucial. This shift from centralized to distributed power systems, however, brings challenges, including voltage fluctuations and renewable energy curtailment. The rapid growth of the electric vehicle (EV) industry adds complexity, increasing overall electricity demand and straining the power supply during peak charging times. This paper proposes a scheduling strategy for EV aggregators to reduce renewable energy curtailment and stabilize grid operation by strategically scheduling EV charging. Using Multi -Agent Transport Simulation (MATSim), a traffic simulation tool, EV driving data in Denver, Colorado, USA, were modeled. The EV aggregator adjusts charging fees based on locational marginal prices, encouraging EVs to charge at different stations according to pricing. Simulations on an IEEE 33-bus system with distributed energy resources and EV charging stations validate the proposed algorithm, demonstrating its effectiveness in reducing curtailment by 12.55% and stabilizing grid operation.

33 ADVANCED PROPULSION SYSTEMS↗

SMAC: A soft MAC to reduce control overhead and latency in CDMA-based AMI networks

The utilization of state-of-the-art 3G cellular CDMA technologies in a utility owned AMI network results in a large amount of control traffic relative to data traffic, increases the average packet delay and hence are not an appropriate choice for smart grid distribution applications. Like the CDG, we consider a utility owned cellular like CDMA network for smart grid distribution applications and classify the distribution smart grid data as scheduled data and random data. Also, we propose SMAC protocol, which changes its mode of operation based on the type of the data being collected to reduce the data collection latency and control overhead when compared to 3G cellular CDMA2000 MAC. The reduction in the data collection latency and control overhead aids in increasing the number of smart meters served by a base station within the periodic data collection interval, which further reduces the number of base stations needed by a utility or reduces the bandwidth needed to collect data from all the smart meters. The reduction in the number of base stations and/or the reduction in the data transmission bandwidth reduces the CAPital EXpenditure (CAPEX) and OPerational EXpenditure (OPEX) of the AMI network. Finally, the proposed SMAC protocol is analyzed using markov chain, analytical expressions for average throughput and average packet delay are derived, and simulation results are also provided to verify the analysis.

97 MATHEMATICS AND COMPUTING↗

Distribution System State Estimation With High Penetration of Demand Response Enabled Loads

Demand-side operations incentivize utility customers to take part in various grid services. A demand response enabled load (DREL) is a flexible grid asset that schedules electricity consumption in response to a time-of-use (TOU) energy price. Consequently, its energy profile differs from that of a conventional load that is insensitive to price. This difference may cause new challenges for distribution system state estimation (DSSE). It is well known that DSSE often needs to use pseudo-measurements based on historic load profiles to increase system observability. However, historic profiles of conventional loads are not representative of DREL behaviors. Additionally, the inaccuracy impacts DSSE results and other DSSE-dependent operations. In this paper, we propose an online pseudo-measurement generation approach for DSSE with DRELs. We formulate an optimization model to represent DRELs self-adjusting actions. Sampling-based stochastic optimization techniques are proposed to account for uncertainties in DRELs. A set of representative DREL behavior data corresponding to the samples are used to characterize DREL pseudo-measurements. Case studies with modified IEEE 123-bus test system verify the validity of the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Transmission and Distribution Systems Restoration with Distributed Generation Scheduling

The self-healing smart grids enable system operators to quickly and efficiently recover transmission and distribution systems from outages and blackouts. The current restoration procedure solves the transmission and distribution system restoration problems separately without considering their impacts on each other, which may prolong the restoration process. However, with the emerging active distribution networks, distributed generators can contribute into the bottom-up restoration strategy. The interaction between the restoration of two interconnected systems should be taken into account. In this paper, a hybrid model of transmission and distribution systems restoration (HTDSR) is proposed by exchanging data of power and voltage between two separate optimization problems. The effectiveness of the HTDSR algorithm is demonstrated through case studies of the integrated IEEE 13-bus distribution network and IEEE 39-bus transmission grid. Simulation results demonstrate that the integrated restoration strategy with optimal scheduling of distributed generation sources can expedite the restoration process.

Distributed generation↗

Net Interchange Schedule Forecasting of Electric Power Exchange for RTO/ISOs

Neighboring independent system operators (ISOs) exchange electric power to enable efficient and reliable operation of the grid. Net interchange (NI) schedule is the sum of the transactions (in MW) between an ISO and its neighbors. Effective forecasting of the amount of actual NI can improve grid operation efficiency. This paper presents results of a preliminary investigation into various methods of prediction that may result in improved prediction accuracy. The methods studied are linear regression, forward regression, stepwise regression, and support vector machine (SVM) regression. The work to date is not yet conclusive. The hope is to explore the effectiveness of other prediction methods and apply all methods to at least one new data set. This should enable more confidence in the conclusions.

Electrical Power Exchange↗

Improving Resource Selection and Scheduling Using Predictions

The introduction of computational grids has resulted in several new problems in the area of scheduling that can be addressed using predictions. The first problem is selecting where to run an application on the many resources available in a grid. Our approach to help address this problem is to provide predictions of when an application would start to execute if submitted to specific scheduled computer systems. The second problem is gaining simultaneous access to multiple computer systems so that distributed applications can be executed. We help address this problem by investigating how to support advance reservations in local scheduling systems. Our approaches to both of these problems are based on predictions for the execution time of applications on space- shared parallel computers. As a side effect of this work, we also discuss how predictions of application run times can be used to improve scheduling performance.

Smith, Warren↗

Navigation in Grid Space with the NAS Grid Benchmarks

We present a navigational tool for computational grids. The navigational process is based on measuring the grid characteristics with the NAS Grid Benchmarks (NGB) and using the measurements to assign tasks of a grid application to the grid machines. The tool allows the user to explore the grid space and to navigate the execution at a grid application to minimize its turnaround time. We introduce the notion of gridscape as a user view of the grid and show how it can be me assured by NGB, Then we demonstrate how the gridscape can be used with two different schedulers to navigate a grid application through a rudimentary grid.

Frumkin, Michael↗

CMS multicore scheduling strategy

In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

Perez-Calero Yzquierdo, Antonio↗

Flexible allocation of energy storage in power grids

Methods and apparatus provide flexible allocation and regulation of scheduled energy transfers between energy storage devices (“batteries”) and a power grid. Piecewise mappings having at least one sloping segment enable gradual variations in scheduled energy transfers as cleared values of a medium of energy exchange deviate from predicted values of the medium of energy exchange. Thereby deviations from a battery's predicted energy transfer schedule can be reduced, and overall smoother operation of a power grid can be achieved. Two sloping linear segments can be separated by a dead band, a portion of the mapping in which the scheduled energy transfer amount is invariant. A dead zone can increase the likelihood of a battery meeting its predicted schedule.

Bhattarai, Bishnu P.↗

Identifying and Exploiting Diurnal Motifs in Wind Generation Time Series Data

Wind energy is scheduled on the power grid using 0–6 h ahead forecasts generated from computer simulations or historical data. When the forecasts are inaccurate, control room operators use their expertise, as well as the actual generation from previous days, to estimate the amount of energy to schedule. However, this is a challenge, and it would be useful for the operators to have additional information they can exploit to make better informed decisions. In this paper, we use techniques from time series analysis to determine if there are motifs, or frequently occurring diurnal patterns in wind generation data. Here we compare two different representations of the data and four different ways of identifying the number of motifs. Using data from wind farms in Tehachapi Pass and mid-Columbia Basin, we describe our findings and discuss how these motifs can be used to guide scheduling decisions.

97 MATHEMATICS AND COMPUTING↗

Method and system for providing flexible reserve power for power grid

An optimization-based method and system is disclosed to enable heterogeneous loads and distributed energy resources (DERs) to participate in grid ancillary services, such as spinning and non-spinning reserves, and ramping reserves. The method includes receiving inputs for decision parameters for optimizing an objective for obtaining flexible reserve power, solving the objective for obtaining flexible reserve power, determining a reserve power schedule for a prediction horizon for providing flexible reserve power based on the objective, generating a service bid based on the reserve power schedule for the power grid; and when the service bid is accepted, providing flexible reserve power to the power grid based on the service bid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Uncertainty Management Framework for Integrated Gas-Electric Energy Systems

In many parts of the world, electric power systems have seen a significant shift toward generation from renewable energy and natural gas. Because of their ability to flexibly adjust power generation in real time, gas-fired power plants are frequently seen as the perfect partner for variable renewable generation. However, this reliance on gas generation increases interdependence and propagates uncertainty between power grids and gas pipelines and brings coordination and uncertainty management challenges. To address these issues, we propose an uncertainty management framework for uncertain, but bounded gas consumption by gas-fired power plants. The admissible ranges are computed based on a joint optimization problem for the combined gas and electricity networks, which involves chance-constrained scheduling for the electric grid and a novel robust optimization formulation for the natural-gas network. This formulation ensures feasibility of the integrated system with a high probability, while providing a tractable numerical formulation. A key advance with respect to existing methods is that our method is based on a physically accurate, validated model for transient gas pipeline flows. Our case study benchmarks our proposed formulation against methods that ignore how reserve activation impacts the fuel use of gas power plants and only consider predetermined gas consumption. Here, the results demonstrate the importance of considering uncertainty to avoid operating constraint violations and curtailment of gas to the generators.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NPSS on NASA's IPG: Using CORBA and Globus to Coordinate Multidisciplinary Aeroscience Applications

Within NASA's High Performance Computing and Communication (HPCC) program, the NASA Glenn Research Center is developing an environment for the analysis/design of aircraft engines called the Numerical Propulsion System Simulation (NPSS). The vision for NPSS is to create a "numerical test cell" enabling full engine simulations overnight on cost-effective computing platforms. To this end, NPSS integrates multiple disciplines such as aerodynamics, structures, and heat transfer and supports "numerical zooming" between O-dimensional to 1-, 2-, and 3-dimensional component engine codes. In order to facilitate the timely and cost-effective capture of complex physical processes, NPSS uses object-oriented technologies such as C++ objects to encapsulate individual engine components and CORBA ORBs for object communication and deployment across heterogeneous computing platforms. Recently, the HPCC program has initiated a concept called the Information Power Grid (IPG), a virtual computing environment that integrates computers and other resources at different sites. IPG implements a range of Grid services such as resource discovery, scheduling, security, instrumentation, and data access, many of which are provided by the Globus toolkit. IPG facilities have the potential to benefit NPSS considerably. For example, NPSS should in principle be able to use Grid services to discover dynamically and then co-schedule the resources required for a particular engine simulation, rather than relying on manual placement of ORBs as at present. Grid services can also be used to initiate simulation components on parallel computers (MPPs) and to address inter-site security issues that currently hinder the coupling of components across multiple sites. These considerations led NASA Glenn and Globus project personnel to formulate a collaborative project designed to evaluate whether and how benefits such as those just listed can be achieved in practice. This project involves firstly development of the basic techniques required to achieve co-existence of commodity object technologies and Grid technologies; and secondly the evaluation of these techniques in the context of NPSS-oriented challenge problems. The work on basic techniques seeks to understand how "commodity" technologies (CORBA, DCOM, Excel, etc.) can be used in concert with specialized "Grid" technologies (for security, MPP scheduling, etc.). In principle, this coordinated use should be straightforward because of the Globus and IPG philosophy of providing low-level Grid mechanisms that can be used to implement a wide variety of application-level programming models. (Globus technologies have previously been used to implement Grid-enabled message-passing libraries, collaborative environments, and parameter study tools, among others.) Results obtained to date are encouraging: we have successfully demonstrated a CORBA to Globus resource manager gateway that allows the use of CORBA RPCs to control submission and execution of programs on workstations and MPPs; a gateway from the CORBA Trader service to the Grid information service; and a preliminary integration of CORBA and Grid security mechanisms. The two challenge problems that we consider are the following: 1) Desktop-controlled parameter study. Here, an Excel spreadsheet is used to define and control a CFD parameter study, via a CORBA interface to a high throughput broker that runs individual cases on different IPG resources. 2) Aviation safety. Here, about 100 near real time jobs running NPSS need to be submitted, run and data returned in near real time. Evaluation will address such issues as time to port, execution time, potential scalability of simulation, and reliability of resources. The full paper will present the following information: 1. A detailed analysis of the requirements that NPSS applications place on IPG. 2. A description of the techniques used to meet these requirements via the coordinated use of CORBA and Globus. 3. A description of results obtained to date in the first two challenge problems.

Lopez, Isaac↗