Search NASA⌕ Search

SEARCH · Search NASA

Results for “ground delay program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Assessment of the State of Communication Delay Research in Preparation for Missions Beyond Low Earth Orbit

NASA’s mission-operations paradigm, established during Project Mercury and minimally evolving through the Apollo Program, Space Shuttle Program, and ISS missions, has primarily depended on real-time support from a ground team of experts. This ground team has served as the safety net for crewed spaceflight missions over the past 60 years, managing the combined state of the mission, vehicle, and crew. However, this operational paradigm, which has seen little change in its Human-Systems Integration Architecture (HSIA), will face challenges during long-duration exploration missions beyond low Earth orbit. Lunar missions may experience one-way communication latencies ranging from 3 to 14 seconds, while Mars missions will encounter up to a 44-minute round-trip latency at a maximum distance from Earth. Communication delays negatively impact the behavioral health and performance of individuals and crews operating across the multi-team space-to-ground system. Previous research indicates that increased isolation and the challenges posed by delayed communication lead to heightened stress, frustration, adverse behavioral symptoms, and reduced individual performance. NASA has investigated the nature and effectiveness of managing this shift in complex operations since early 2000, but additional research is necessary to assess the issues associated with communication latencies and identify effective countermeasures. This work aimed to examine the evidence from 20 years of research on comm delays. We systematically reviewed the past 20 years of communication delay literature, focusing on how this research aligns with relevant, high-priority needs in the HSIA, Team, and BMed Risks. This type of panoramic review has not been done since 2013; a current, aggregated picture of what has been studied and how is needed to inform additional studies and mitigation development. Additional perspectives were gained from interviews with the research participants, operations experts, and communication delay researchers. Results from this effort will help characterize the risk posed by communication latency for upcoming Artemis missions and point toward potential mitigations. The final results will be presented. For the literature review, we formed a search term seed set drawing from languages used in two papers representative of the previous state of knowledge and supplemented it with additional search terms. We conducted literature searches on Google Scholar, PubMed, and Web of Science and searched NASA project archives for output from NASA-sponsored research. This search yielded 150 papers, of which 48 were relevant. SME interviews provided perspective on key communication delay issues and concerns and what is being worked on to mitigate those issues. Preliminary results of the literature review have been presented. Final results to be presented include the results of the literature review and findings from the interviews.

literature review↗

The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

Fatig, Curtis↗

Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

Earth Science↗

Type Ia Supernova Rate Measurements to Redshift 2.5 from Candles: Searching for Prompt Explosions in the Early Universe

The Cosmic Assembly Near-infrared Deep Extragalactic Legacy Survey (CANDELS) was a multi-cycle treasury program on the Hubble Space Telescope(HST) that surveyed a total area of approx. 0.25 deg(sup 2) with approx.900 HST orbits spread across five fields over three years. Within these survey images we discovered 65 supernovae (SNe) of all types, out to z approx. 2.5. We classify approx. 24 of these as Type Ia SNe (SNe Ia) based on host galaxy redshifts and SN photometry (supplemented by grism spectroscopy of six SNe). Here we present a measurement of the volumetric SN Ia rate as a function of redshift, reaching for the first time beyond z = 2 and putting new constraints on SN Ia progenitor models. Our highest redshift bin includes detections of SNe that exploded when the universe was only approx. 3 Gyr old and near the peak of the cosmic star formation history. This gives the CANDELS high redshift sample unique leverage for evaluating the fraction of SNe Ia that explode promptly after formation (500 Myr). Combining the CANDELS rates with all available SN Ia rate measurements in the literature we find that this prompt SN Ia fraction isfP0.530.09stat0.100.10sys0.26, consistent with a delay time distribution that follows a simplet1power law for all timest40 Myr. However, mild tension is apparent between ground-based low-z surveys and space-based high-z surveys. In both CANDELS and the sister HST program CLASH (Cluster Lensing And Supernova Survey with Hubble), we find a low rate of SNe Ia at z > 1. This could be a hint that prompt progenitors are in fact relatively rare, accounting for only 20 of all SN Ia explosions though further analysis and larger samples will be needed to examine that suggestion.

Ia↗

Enhanced Software for Scheduling Space-Shuttle Processing

The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

Barretta, Joseph A.↗

NASA Spacecraft Fault Management Workshop Results

Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, as well as opportunities identified for future investment in tools, processes, and products to facilitate the development of space flight fault management capabilities.

Newhouse, Marilyn↗

Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions

Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the findings and recommendations from that workshop, particularly as fault management development issues affect operations and the development of operations capabilities.

Newhouse, Marilyn E.↗

Modeling Relative Trajectory Costs for Airborne Trajectory Reroutes using Trajectory Option Sets

As part of the Increasing Diverse Operations Project (IDO), the Trajectory Options Program (TOS), which was introduced with the Collaborative Trajectory Options Program, is used in a novel way to help reroute airborne aircraft. Different trajectories in this TOS are ranked by a Relative Trajectory Cost (RTC) which had to be adapted from its original use expressing ground delay, into expressing costs in a dollar value to adapt to aircraft being airborne. For this, a set of models consisting of the parameters Fuel, Crew, Airspace and Downstream Congestion cost, has been developed in an attempt to represent linear and non-linear behavior of airline delay costs. While Fuel and Airspace Cost in this model increase linearly, the Parameter Crew consists of three subset factors which leverage an underlying Crew-Placement algorithm using the IDO scenario to model non-linearity. The parameter Downstream Congestion attempts to predict delay in minutes by looking at sector overload for each sector a selected trajectory passes through.

automation↗

Data Acquisition and Control Systems Laboratory

The Data Acquisition and Control Systems (DACS) Laboratory is a facility at Stennis Space Center that provides an off test-stand capability to develop data-acquisition and control systems for rocket-engine test stands. It is also used to train new employees in state-of-the-art systems, and provides a controlled environment for troubleshooting existing systems, as well as the ability to evaluate the application of new technologies and process improvements. With the SSC propulsion testing schedules, without the DACS Laboratory, it would have been necessary to perform most of the development work on actual test systems, thereby subjecting both the rocket-engine testing and development programs to substantial interference in the form of delays, restrictions on modifications of equipment, and potentially compromising software configuration control. The DACS Laboratory contains a versatile assortment of computer hardware and software, digital and analog electronic control and data-acquisition equipment, and standard electronic bench test equipment and tools. Recently completed Control System development and software verification projects include support to the joint NASA/Air Force Integrated Powerhead Demonstration (IPD) LOX & LH2 PreBurner and Turbopump ground testing programs. In other recent activities, the DACS Laboratory equipment and expertise have supported the off-stand operation of high-pressure control valves to correct valve leak problems prior to installation on the test stand. Future plans include expanding the Laboratory's capabilities to provide cryogenic control valve characterization prior to installation, thereby reducing test stand activation time.

Holland, Randy↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

Autonomous Mission Manager for Rendezvous, Inspection and Mating

To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.

Zimpfer, Douglas J.↗

The Value of a Spaceflight Clinical Decision Support System for Earth-Independent Medical Operations

As NASA prepares for crewed lunar missions over the next several years, plans are also underway to journey farther into deep space. Deep space exploration will require a paradigm shift in astronaut medical support toward progressively earth-independent medical operations (EIMO). The Exploration Medical Capability (ExMC) element of NASA’s Human Research Program (HRP) is investigating the feasibility and value of advanced capabilities to promote and enhance EIMO. Currently, astronauts rely on real-time communication with ground-based medical providers. However, as the distance from Earth increases, so do communication delays and disruptions. Moreover, resupply and evacuation will become increasingly complex, if not impossible, on deep space missions. In contrast to today’s missions in low earth orbit (LEO), where most medical expertise and decision-making are ground-based, an exploration crew will need to autonomously detect, diagnose, treat, and prevent medical events. Due to the sheer amount of pre-mission training required to execute a human spaceflight mission, there is often little time to devote exclusively to medical training. One potential solution is to augment the long duration exploration crew’s knowledge, skills, and abilities with a clinical decision support system (CDSS). An analysis of preliminary data indicates the potential benefits of a CDSS to mission outcomes when augmenting cognitive and procedural performance of an autonomous crew performing medical operations, and we provide an illustrative scenario of how such a CDSS might function.

Brian K. Russell↗

Progressive TDI Measurements with the PACE OCI ETU

The Plankton Aerosol Cloud ocean Ecosystem (PACE) Ocean Color Instrument (OCI) has completed the ground test program for its engineering unit (ETU) and testing of the flight unit will begin in the near future. OCIis a grating spectrometer with hyperspectral coverage from about 340 nm to 885 nm with 9 additional filtered channels in the SWIR. Two CCDs are used as detectors for the hyperspectral channels. One important operating mode of the CCDs on OCI is progressive time delay integration (or PTDI). In this mode, the charge in the CCD can be held for multiples of the nominal integration times. A series of these measurements can be made with progressively increasing multiples of the nominal integration time as the instrument scans across a uniform source. Ground testing with this operating mode on OCI ETU has shown promising results. This work will present measurements taken with the PTDI mode and the analysis of OCI ETU linearity and dynamic range

PACE↗

Geocam Space: Enhancing Handheld Digital Camera Imagery from the International Space Station for Research and Applications

Handheld astronaut photography of the Earth has been collected from the International Space Station (ISS) since 2000, making it the most temporally extensive remotely sensed dataset from this unique Low Earth orbital platform. Exclusive use of digital handheld cameras to perform Earth observations from the ISS began in 2004. Nadir viewing imagery is constrained by the inclined equatorial orbit of the ISS to between 51.6 degrees North and South latitude, however numerous oblique images of land surfaces above these latitudes are included in the dataset. While unmodified commercial off-the-shelf digital cameras provide only visible wavelength, three-band spectral information of limited quality current cameras used with long (400+ mm) lenses can obtain high quality spatial information approaching 2 meters/ground pixel resolution. The dataset is freely available online at the Gateway to Astronaut Photography of Earth site (http://eol.jsc.nasa.gov), and now comprises over 2 million images. Despite this extensive image catalog, use of the data for scientific research, disaster response, commercial applications and visualizations is minimal in comparison to other data collected from free-flying satellite platforms such as Landsat, Worldview, etc. This is due primarily to the lack of fully-georeferenced data products - while current digital cameras typically have integrated GPS, this does not function in the Low Earth Orbit environment. The Earth Science and Remote Sensing (ESRS) Unit at NASA Johnson Space Center provides training in Earth Science topics to ISS crews, performs daily operations and Earth observation target delivery to crews through the Crew Earth Observations (CEO) Facility on board ISS, and also catalogs digital handheld imagery acquired from orbit by manually adding descriptive metadata and determining an image geographic centerpoint using visual feature matching with other georeferenced data, e.g. Landsat, Google Earth, etc. The lack of full geolocation information native to the data makes it difficult to integrate astronaut photographs with other georeferenced data to facilitate quantitative analysis such as urban land cover/land use classification, change detection, or geologic mapping. The manual determination of image centerpoints is both time and labor-intensive, leading to delays in releasing geolocated and cataloged data to the public, such as the timely use of data for disaster response. The GeoCam Space project was funded by the ISS Program in 2015 to develop an on-orbit hardware and ground-based software system for increasing the efficiency of geolocating astronaut photographs from the ISS (Fig. 1). The Intelligent Robotics Group at NASA Ames Research Center leads the development of both the ground and on-orbit systems in collaboration with the ESRS Unit. The hardware component consists of modified smartphone elements including cameras, central processing unit, wireless Ethernet, and an inertial measurement unit (gyroscopes/accelerometers/magnetometers) reconfigured into a compact unit that attaches to the base of the current Nikon D4 camera - and its replacement, the Nikon D5 - and connects using the standard Nikon peripheral connector or USB port. This provides secondary, side and downward facing cameras perpendicular to the primary camera pointing direction. The secondary cameras observe calibration targets with known internal X, Y, and Z position affixed to the interior of the ISS to determine the camera pose corresponding to each image frame. This information is recorded by the GeoCam Space unit and indexed for correlation to the camera time recorded for each image frame. Data - image, EXIF header, and camera pose information - is transmitted to the ground software system (GeoRef) using the established Ku-band USOS downlink system. Following integration on the ground, the camera pose information provides an initial geolocation estimate for the individual film frame. This new capability represents a significant advance in geolocation from the manual feature-matching approach for both nadir and off-nadir viewing imagery. With the initial geolocation estimate, full georeferencing of an image is completed using the rapid tie-pointing interface in GeoRef, and the resulting data is added to the Gateway to Astronaut Photography of Earth online database in both Geotiff and Keyhole Markup Language (kml) formats. The integration of the GeoRef software component of Geocam Space into the CEO image cataloging workflow is complete, and disaster response imagery acquired by the ISS crew is now fully georeferenced as a standard data product. The on-orbit hardware component (GeoSens) is in final prototyping phase, and is on-schedule for launch to the ISS in late 2016. Installation and routine use of the Geocam Space system for handheld digital camera photography from the ISS is expected to significantly improve the usefulness of this unique dataset for a variety of public- and private-sector applications.

Stefanov, William L.↗

A comparison of nuclear thermal rocket development cost and schedule for piloted missions to Mars

In Fiscal Year 1992, NASA led a team, including DOE, universities, and industry, that evaluated various schedule and cost scenarios for development of nuclear thermal rocket propulsion systems for piloted Mars exploration. This paper summarizes the results of two of these studies: (1) a so-called 'Fast Track' approach, that would result in technology readiness level 6 (TRL-6-system ground testing complete) by the year 2000, and (2) a slower program that results in TRL-6 by 2006. Both scenarios included a concurrent engineering approach. Costs and schedules for the two scenarios are compared. In addition to the six-year schedule delay, the TRL-6 in 2006 scenario is estimated to increase the cost of the program from $4.7 billion to $5.8 billion (in real-year dollars). On the positive side, the technical program should be better, since nuclear testing of fuel elements may be possible prior to concept down-select, resulting in a more informed decision.

Clark, John S.↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy Onboard the International Space Station

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions.NASAs Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control experiment on-board the International Space Station that demonstrated single action intelligent procedures for crew command and control. The target problem was to enable crew initialization of a facility class rack with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as initialization of a medical facility to respond to a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS).

Autonomous Mission Operations↗

Space Link Extension Protocol Emulation for High-Throughput, High-Latency Network Connections

New space missions require higher data rates and new protocols to meet these requirements. These high data rate space communication links push the limitations of not only the space communication links, but of the ground communication networks and protocols which forward user data to remote ground stations (GS) for transmission. The Consultative Committee for Space Data Systems, (CCSDS) Space Link Extension (SLE) standard protocol is one protocol that has been proposed for use by the NASA Space Network (SN) Ground Segment Sustainment (SGSS) program. New protocol implementations must be carefully tested to ensure that they provide the required functionality, especially because of the remote nature of spacecraft. The SLE protocol standard has been tested in the NASA Glenn Research Center's SCENIC Emulation Lab in order to observe its operation under realistic network delay conditions. More specifically, the delay between then NASA Integrated Services Network (NISN) and spacecraft has been emulated. The round trip time (RTT) delay for the continental NISN network has been shown to be up to 120ms; as such the SLE protocol was tested with network delays ranging from 0ms to 200ms. Both a base network condition and an SLE connection were tested with these RTT delays, and the reaction of both network tests to the delay conditions were recorded. Throughput for both of these links was set at 1.2Gbps. The results will show that, in the presence of realistic network delay, the SLE link throughput is significantly reduced while the base network throughput however remained at the 1.2Gbps specification. The decrease in SLE throughput has been attributed to the implementation's use of blocking calls. The decrease in throughput is not acceptable for high data rate links, as the link requires constant data a flow in order for spacecraft and ground radios to stay synchronized, unless significant data is queued a the ground station. In cases where queuing the data is not an option, such as during real time transmissions, the SLE implementation cannot support high data rate communication.

Computer Networking↗

Exploration Medical Capability Clinical Decision Support System Architecture Recommendation

A new era in space exploration has arrived with the goal of establishing a long-term presence on the Moon and using those learning to take the next giant leap: sending the first astronauts to Mars. These ambitious goals will require significant changes in in-flight medical care due to constraints on mass, volume, power, crew time, and medical evacuation capabilities. Furthermore, while crews currently rely on real-time communications with ground-based medical providers, as distance from Earth increases, so do communication delays and disruptions. The crew will need to autonomously detect, diagnose, treat, and prevent medical events. These constraints require development of transformative solutions and new technologies. Through participation in the Human Research Program’s (HRP) Exploration Medical Capability (ExMC) research, NASA has developed and demonstrated a Medical Data Architecture (MDA), a platform upon which a robust capability of Clinical Decision Support (CDS) can be built. As a result, NASA is now positioned to build an advanced autonomous CDS System (CDSS) which will aid in crew health decision-making. The CDSS combines data management aspects of a system that would lead to the autonomy required by NASA-STD-3001, Section 3, Health and Medical Care Standards. The project addresses the ExMC gap Medical-701: We need to increase inflight medical capabilities and identify new capabilities that (a) maximize benefit and/or (b) reduce “costs” on human system/mission/vehicle resources. This architecture recommendation document introduces an integrated data architecture that provides self-sufficient medical care for crews on long-duration spaceflight missions.

ExMC↗