Search NASA⌕ Search

SEARCH · Search NASA

Results for “high efficiency wall”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Wall-plug efficiency and beam dynamics in free-electron lasers using energy recovery linacs

In a high average power free-electron laser (FEL) the wall-plug efficiency is of critical importance in determining the size, complexity, and cost of the overall system. The wall-plug efficiency for the FEL oscillator and amplifier (uniform and tapered wiggler) is strongly dependent on the energy recovery process. A theoretical model for electron beam dynamics in the energy recovery linac is derived and applied to the acceleration and deceleration of nano-Coulomb electron bunches for a tapered FEL amplifier. For the tapered amplifier, the spent electron beam exiting the wiggler consists of trapped and untrapped electrons. Decelerating these two populations using different phases of the radio-frequency wave in the recovery process enhances wall-plug efficiency. For the parameters considered here, the wall-plug efficiency for the tapered amplifier can be {approx}10% using this approach.

43 PARTICLE ACCELERATORS↗

An efficient finite element technique for sound propagation in axisymmetric hard wall ducts carrying high subsonic Mach number flows

The general non-linear three-dimensional equation for acoustic potential is derived by using a perturbation technique. The linearized axisymmetric equation is then solved by using a finite element algorithm based on the Galerkin formulation for a harmonic time dependence. The solution is carried out in complex number notation for the acoustic velocity potential. Linear, isoparametric, quadrilateral elements with non-uniform distribution across the duct section are implemented. The resultant global matrix is stored in banded form and solved by using a modified Gauss elimination technique. Sound pressure levels and acoustic velocities are calculated from post element solutions. Different duct geometries are analyzed and compared with experimental results.

Tag, I. A.↗

Evaluating the performance of portable air filter walls for the James Webb Space Telescope launch campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

Evaluating the Performance of Portable Air Filter Walls for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) launched from the Centre Spatial Guyanais (CSG) in December 2021. JWST’s requirements permitted processing in International Organization for Standardization (ISO) Class 7 or better facilities, but CSG was only equipped with ISO Class 8 facilities. To temporarily upgrade the air cleanliness in the Payload Processing Facility, Fueling Hall, and Final Assembly Building Encapsulation Hall, NASA provided two portable High Efficiency Particulate Air (HEPA) and carbon filter walls that were used in each location. The walls were comprised of stacks of two modules high and arranged in push-push configurations as shown to be most effective via Computational Fluid Dynamics simulations of expected floor layouts in each facility. After delivery to NASA’s Goddard Space Flight Center in 2020, the walls underwent initial verification measurements inside a cleanroom and validation testing in an uncontrolled area to quantify their improvement of air cleanliness and particle and molecular fallout. Validation testing showed improvements of 83-99% for airborne particle counts, 79-91% for particle fallout, and 50-90% for molecular fallout. The particle improvements were applied to the contamination budget analysis that tracked current and predicted future cleanliness against End-of-Life requirements for JWST’s critical surfaces. At CSG, the walls successfully maintained an ISO Class 7 environment or better within their envelope in each location, despite their presence in ISO Class 8 facilities with dense integration operations.

HEPA, Contamination Control, Filtration↗

West Village Student Housing Phase I: Apartment Monitoring and Evaluation

Building America team Alliance for Residential Building Innovation (ARBI) worked with the University of California, Davis and the developer partner West Village Community Partnership (WVCP) to evaluate performance on 192 student apartments completed in September, 2011 as part of Phase I of the multi-purpose West Village project. West Village is the largest planned zero net energy community in the United States. The campus neighborhood is designed to enable faculty, staff, and students to affordably live near campus, take advantage of environmentally friendly transportation options, and participate fully in campus life. The aggressive energy efficiency measures that are incorporated in the design contribute to source energy reductions of 37% over the B10 Benchmark. These measures include increased wall and attic insulation, high performance windows, high efficiency heat pumps for heating and cooling, central heat pump water heaters (HPWHs), 100% high efficacy lighting, and ENERGY STAR major appliances. The report discusses how measured energy use compares to modeling estimates over a 10-month monitoring period and includes a cost effective evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NASA Center for Climate Simulation (NCCS) Presentation

The NASA Center for Climate Simulation (NCCS) offers integrated supercomputing, visualization, and data interaction technologies to enhance NASA's weather and climate prediction capabilities. It serves hundreds of users at NASA Goddard Space Flight Center, as well as other NASA centers, laboratories, and universities across the US. Over the past year, NCCS has continued expanding its data-centric computing environment to meet the increasingly data-intensive challenges of climate science. We doubled our Discover supercomputer's peak performance to more than 800 teraflops by adding 7,680 Intel Xeon Sandy Bridge processor-cores and most recently 240 Intel Xeon Phi Many Integrated Core (MIG) co-processors. A supercomputing-class analysis system named Dali gives users rapid access to their data on Discover and high-performance software including the Ultra-scale Visualization Climate Data Analysis Tools (UV-CDAT), with interfaces from user desktops and a 17- by 6-foot visualization wall. NCCS also is exploring highly efficient climate data services and management with a new MapReduce/Hadoop cluster while augmenting its data distribution to the science community. Using NCCS resources, NASA completed its modeling contributions to the Intergovernmental Panel on Climate Change (IPCG) Fifth Assessment Report this summer as part of the ongoing Coupled Modellntercomparison Project Phase 5 (CMIP5). Ensembles of simulations run on Discover reached back to the year 1000 to test model accuracy and projected climate change through the year 2300 based on four different scenarios of greenhouse gases, aerosols, and land use. The data resulting from several thousand IPCC/CMIP5 simulations, as well as a variety of other simulation, reanalysis, and observationdatasets, are available to scientists and decision makers through an enhanced NCCS Earth System Grid Federation Gateway. Worldwide downloads have totaled over 110 terabytes of data.

Webster, William P.↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope, launch, contamination,↗

Development and Validation of Predictive Models for In-Cylinder Radiation and Wall Heat Transfer

The lack of accurate submodels for in-cylinder radiation and heat transfer has been identified as a key shortcoming in developing truly predictive, physics-based computational fluid dynamics (CFD) models that can be used to develop and design combustion systems for advanced high-efficiency, low-emissions engines. Measurements of wall boundary layers in engines show discrepancies of up to 100% with respect to standard CFD boundary layer models. And analysis of in-cylinder radiation based on the most recent spectral property databases and high-fidelity radiative transfer equation solvers has shown that at operating pressures and exhaust-gas recirculation levels typical of modern compression-ignition truck engines, molecular gas radiation (mainly carbon dioxide and water vapor) can be more important than soot particle radiation, and that a significant fraction of the emitted radiation (50% or more) can be reabsorbed before reaching the walls, thereby acting to redistribute energy in the combustion chamber. In this project, an integrated experimental and simulation approach has been used to generate new physical insight into in-cylinder heat-transfer processes in engines, and to develop computationally practicable CFD-based models that accurately represent the physics. New experimental data have been taken in an optically accessible single-cylinder research engine, and in a multi-cylinder production engine. Those data have provided new insight into the radiative environment in engines. New CFD models have been developed and validated for in-cylinder heat transfer, focusing mainly on radiative heat transfer and coupling between turbulent boundary layer wall heat transfer and radiative heat transfer. The CFD models have been developed and implemented in an open-source software framework that can be shared with other researchers. The models are compatible both with unsteady Reynolds-averaged Navier Stokes (URANS) formulations and with large-eddy simulations (LES) of in-cylinder processes in engines.

02 PETROLEUM↗

Exchange coupling torque in ferrimagnetic Co/Gd bilayer maximized near angular momentum compensation temperature

Highly efficient current-induced motion of chiral domain walls was recently demonstrated in synthetic antiferromagnetic (SAF) structures due to an exchange coupling torque (ECT). The ECT derives from the antiferromagnetic exchange coupling through a ruthenium spacer layer between the two perpendicularly magnetized layers that comprise the SAF. Here we report that the same ECT mechanism applies to ferrimagnetic bi-layers formed from adjacent Co and Gd layers. In particular, we show that the ECT is maximized at the temperature T A where the Co and Gd angular momenta balance each other, rather than at their magnetization compensation temperature T M . The current induced velocity of the domain walls is highly sensitive to longitudinal magnetic fields but we show that this not the case near T A . Our studies provide new insight into the ECT mechanism for ferrimagnetic systems. The high efficiency of the ECT makes it important for advanced domain wall based spintronic devices.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Wall plug efficiency analysis of a compact SRF industrial accelerator [Poster]

Superconducting radiofrequency cavities offer extremely high (>90%) RF-to-beam energy conversion efficiency. Recent breakthroughs in the Nb 3 Sn SRF cavity technology, successful demonstration of the conduction cooling technique, and the availability of high cooling capacity cryocoolers has made possible the use of SRF for industrial particle accelerators. However, the overall wall plug-to-beam efficiency of such an SRF accelerator can be limited by the wall plug-to-RF power efficiency of the RF source powering this accelerator. The present study quantifies the wall plug-to-beam efficiency of a conduction-cooled SRF accelerator considering several different choices of the RF power source. The study concludes that the wall plug efficiency of the accelerator is indeed limited by that of the power source.

43 PARTICLE ACCELERATORS↗

Wall plug efficiency analysis of a compact SRF industrial accelerator [Poster]

Superconducting radiofrequency cavities offer extremely high (>90%) RF-to-beam energy conversion efficiency. Recent breakthroughs in the Nb 3 Sn SRF cavity technology, successful demonstration of the conduction cooling technique, and the availability of high cooling capacity cryocoolers has made possible the use of SRF for industrial particle accelerators. However, the overall wall plug-to-beam efficiency of such an SRF accelerator can be limited by the wall plug-to-RF power efficiency of the RF source powering this accelerator. The present study quantifies the wall plug-to-beam efficiency of a conduction-cooled SRF accelerator considering several different choices of the RF power source. The study concludes that the wall plug efficiency of the accelerator is indeed limited by that of the power source.

43 PARTICLE ACCELERATORS↗

Möbius domain-wall fermions on gradient-flowed dynamical HISQ ensembles

We report on salient features of a mixed lattice QCD action using valence Möbius domain-wall fermions solved on the dynamical 𝑁 𝑓 = 2 + 1 + 1 highly improved staggered quark sea-quark ensembles generated by the MILC Collaboration. The approximate chiral symmetry properties of the valence fermions are shown to be significantly improved by utilizing the gradient-flow scheme to first smear the highly improved staggered quark configurations. The greater numerical cost of the Möbius domain-wall inversions is mitigated by the highly efficient QUDA library optimized for NVIDIA GPU accelerated compute nodes. We have created an interface to this optimized QUDA solver in Chroma. We provide tuned parameters of the action and performance of QUDA using ensembles with the lattice spacings 𝑎 ≃ {0.15,0.12,0.09} fm and pion masses 𝑚 𝜋 ≃ {310,220,130} MeV. We have additionally generated two new ensembles with 𝑎 ∼ 0.12 fm and 𝑚 𝜋 ∼ {400,350} MeV. Furthermore, with a fixed flow time of 𝑡 𝑔⁡𝑓 =1 in lattice units, the residual chiral symmetry breaking of the valence fermions is kept below 10% of the light quark mass on all ensembles, 𝑚 res ≲ 0.1 × 𝑚 𝑙 , with moderate values of the fifth dimension 𝐿 5 and a domain-wall height 𝑀 5 ≤ 1.3. As a benchmark calculation, we perform a continuum, infinite volume, physical pion and kaon mass extrapolation of 𝐹 𝐾 ±⁡ /𝐹 𝜋 ± and demonstrate our results are independent of flow time and consistent with the FLAG determination of this quantity at the level of less than one standard deviation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Experimental investigation of a swept-strut fuel-injector concept for scramjet application

Results are presented of an experiment to investigate the behavior at Mach 4 flight conditions of the swept-strut fuel-injector concept employed in the Langley integrated modular scramjet engine design. Autoignition of the hydrogen fuel was not achieved at stagnation temperatures corresponding to a flight Mach number of 4; however, once ignition was achieved, stable combustion was maintained. Pressure disturbances upstream of the injector location, which were caused by fuel injection and combustion, were generally not observed; this indicates the absence of serious adverse combustor-inlet interactions. Mixing performance and reaction performance determined from probe surveys and wall pressure data indicate that high combustion efficiency should be obtained with the combustor length provided in the scramjet engine design. No adverse interaction between the perpendicular and parallel fuel-injection modes was observed.

Anderson, G. Y.↗

DOE Zero Energy Ready Home Case Study: John Hubert Associates — EXIT-0 House, North Cape May, NJ

This house is the first DOE Zero Energy Ready Home for this builder and won a Custom Builder award in the 2014 Housing Innovation Awards. The 1,871-ft2 home features advanced-framed above-grade walls with R-21 fiberglass batt plus an R-3.6-insulated coated OSB sheathing, R-18 rigid-foam-insulated crawlspace walls, solar water heating, a high-efficiency heat pump, an HRV, and mostly LED lighting.

2014 housing innovation awards↗

ILC Reference Design Report: Accelerator Executive Summary

The International Linear Collider (ILC) is a 200-500 GeV center-of-mass high-luminosity linear electron-positron collider, based on 1.3 GHz superconducting radiofrequency (SCRF) accelerating cavities. The use of the SCRF technology was recommended by the International Technology Recommendation Panel (ITRP) in August 2004 [1], and shortly thereafter endorsed by the International Committee for Future Accelerators (ICFA). In an unprecedented milestone in high-energy physics, the many institutes around the world involved in linear collider R&D united in a common effort to produce a global design for the ILC. In November 2004, the 1st International Linear Collider Workshop was held at KEK, Tsukuba, Japan. The workshop was attended by some 200 accelerator physicists from around the world, and paved the way for the 2nd ILC Workshop in August 2005, held at Snowmass, Colorado, USA, where the ILC Global Design Effort (GDE) was officially formed. The GDE membership reflects the global nature of the collaboration, with accelerator experts from all three regions (Americas, Asia and Europe). The first major goal of the GDE was to define the basic parameters and layout of the machine--the Baseline Configuration. This was achieved at the first GDE meeting held at INFN, Frascati, Italy in December 2005 with the creation of the Baseline Configuration Document (BCD). During the next 14 months, the BCD was used as the basis for the detailed design work and value estimate (as described in section 1.6) culminating in the completion of the second major milestone, the publication of the draft ILC Reference Design Report (RDR). The technical design and cost estimate for the ILC is based on two decades of world-wide Linear Collider R&D, beginning with the construction and operation of the SLAC Linear Collider (SLC). The SLC is acknowledged as a proof-of-principle machine for the linear collider concept. The ILC SCRF linac technology was pioneered by the TESLA collaboration*, culminating in a proposal for a 500 GeV center-of-mass linear collider in 2001 [2]. The concurrent (competing) design work on a normal conducting collider (NLC with X-band [3] and GLC with X- or C-Band [4]), has advanced the design concepts for the ILC injectors, Damping Rings (DR) and Beam Delivery System (BDS), as well as addressing overall operations, machine protection and availability issues. The X- and C-band R&D has led to concepts for the RF power source that may eventually produce either cost and/or performance benefits. Finally, the European XFEL [5] to be constructed at DESY, Hamburg, Germany, will make use of the TESLA linac technology, and represents a significant on-going R&D effort which remains of great benefit for the ILC. The current ILC baseline assumes an accelerating gradient of 31.5 MV/m to achieve a centre-of-mass energy of 500 GeV. The high luminosity requires the use of high power and small emittance beams. The choice of 1.3 GHz SCRF is well suited to the requirements, primarily because the very low power loss in the SCRF cavity walls allows the use of long RF pulses, relaxing the requirements on the peak-power generation, and ultimately leading to high wall-plug to beam transfer efficiency. The primary cost drivers are the SCRF Main Linac technology and the Conventional Facilities (including civil engineering). The choice of gradient is a key cost and performance parameter, since it dictates the length of the linacs, while the cavity quality factor (Q{sub 0}) relates to the required cryogenic cooling power. The achievement of 31.5 MV/m as the baseline average operational accelerating gradient--requiring a minimum performance of 35 MV/m during cavity mass-production acceptance testing--represents the primary challenge to the global ILC R&D With the completion of the RDR, the GDE will shortly begin an engineering design study, closely coupled with a prioritized R&D program. The goal is to produce an Engineering Design Report (EDR) demonstrating readiness for construction by 2010, followed by start of construction in 2012. A seven-year construction phase is currently assumed, allowing operations to begin in 2019. This is consistent with a technically driven schedule for this international project.

43 PARTICLE ACCELERATORS↗