Search NASA⌕ Search

SEARCH · Search NASA

Results for “hose lines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

41 records · Page 3

Development of an In-Flight Refill Unit for Replenishing Research Animal Drinking Water

The Spacelab Life Sciences 2 (SLS-2) mission became NASA's longest duration Shuttle mission, lasting fourteen days, when Columbia landed on 1 Nov. 1993. Located within the Spacelab were a total of 48 laboratory rats which were housed in two Research Animal Holding Facilities (RAHF's) developed by the Space Life Sciences Payloads Office (SLSPO) at Ames Research Center. In order to properly maintain the health and well-being of these important research animals, sufficient quantities of food and water had to be available for the duration of the mission. An inflight Refill Unit was developed by the SLSPO to replenish the animals' drinking water inflight using the Shuttle potable water system in the middeck galley as the source of additional water. The Inflight Refill Unit consists of two major subsystems, a Fluid Pumping Unit (FPU) and a Collapsible Water Reservoir (CWR). The FPU provides the system measurement and controls, pump, water lines, and plumbing necessary to collect water coming into the unit from the potable water system and pump it out and into the RAHF drinking water tanks. The CWR is a Kevlar(trademark) reinforced storage bladder, connected to the FPU, which has a capacity of 6 liters in its expanded volume and functions to store the water collected from the potable water system and allows for the transport of the water back to the Spacelab where it is pumped into each of two RAHFs. Additional components of the FPU system include the inlet and outlet fluid hoses, a power cable for providing 28 volt direct current spacecraft electrical power to the pump within the FPU, a tether system for the unit when in use in Spacelab, and an adapter for mating the unit to the orbiter waste collection system in order to dump excess water after use in Spacelab. This paper will present the design process and development approach for the lnflight Refill Unit, define some of the key design issues which had to be addressed, and summarize the inflight operational performance of the unit during the SLS-2 mission.

Savage, P. D.↗

CryoCart Restoration and Vacuum Pipe Construction

Propulsion systems that utilize hypergolic propellants have been used to power space vehicles since the beginning of the space program. Liquid methane and oxygen propulsion systems have emerged as an alternative and have proven to be more environmentally friendly. The incorporation of liquid methane/liquid oxygen (LOX) into the propulsion system has demonstrated an increase in engine performance, as well as a reduction in the volume, size and complexity of the system. Consequently, reducing the total mass of the vehicle which is a crucial aspect that is considered when planning space missions to both the Moon and Mars [1]. Project Morpheus has made significant advancements in liquid oxygen/liquid methane propulsion system technologies by incorporating a LOX/methane propulsion system to a vertical test bed. The vehicle consisted of a 5,000 lb main engine and four 20 lb remote control system (RCS) engines that utilize liquid methane/LOX as its propellant [1]. The vehicle completed successful flight testing at Kennedy Space Center in 2014 which marked the completion of the Morpheus project. Subsequent projects utilizing Morpheus' vertical test bed have been developed to make further advancements. One of the subsequent projects consisted of the addition of a smaller 2,000 lb main engine and a cold helium heat exchanger which would make it possible for a pressurant tank systems to be send to Mars or the Moon by significantly decreasing the overall mass and volume of the pressurant tank. The hot fire tests of the integrated system with the smaller main engine and cold helium heat exchanger were successful at sea level, but further studies are being conducted to better understand how the vertical test bed will behave under thermal-vacuum conditions. For this reason, the integrated vehicle will be taken to Plum Brook to be tested in a chamber capable of simulating these conditions. To ensure that the vehicle will function properly under vacuum conditions, testing will be first completed at the component level. During this process, the igniter of the main engine and the RCS thrusters will be tested under a vacuum. To complete the testing of the components, the test setup first needed to be finalized. The CryoCart is being used to feed the propellants to the test article. The CryoCart is a movable test set-up that was developed in 2009 to provide a mobile platform for testing oxygen/methane systems with hot-fire capability up to 100 lbf. The CryoCart consists of three different systems: Oxygen, Methane, and liquid Nitrogen. The Oxygen and Methane systems are placed into two different carts while the liquid nitrogen system is mainly located in the methane cart. Over the years, the CryoCart has been utilized for different projects and has undergone deterioration. For this reason, a new phase has been developed to rebuild it to working conditions once again. During my internship, I was aiding in the construction and restoration of the CryoCart. In the initial stages of the process, I updated the fluid and electrical schematics for the oxygen, methane, and test article systems. The original CryoCart consisted of an electrical panel that utilized electromechanical relays and a terminal to drive the igniter power and signal, as well as the main fuel and oxygen valves. This electrical panel connected to the CryoCart through various wire harnesses that could be found exiting from the CryoCart. First, it was determined how these harnesses connected to the electromechanical relays so that they worked correctly. Once the electrical system was understood, an alternative for the electromechanical relays and the Molex connectors used throughout the system was sought since these components can often prove to be unreliable. Solid State relays and MIL connectors were purchased to serve as replacements. Upon arrival of the parts, crimping and wiring was completed to install the new solid state relays and MIL connectors. During the replacement of the relays and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the CryoCart and the vacuum tube, hot fire testing for the RCS thrusters and the main engine igniter are going to begin. During this time any issues encountered with the engines or igniter will be addressed to ensure that the components function under vacuum conditions. After successful completion of testing, the vertical test bed, Morpheus, will be rebuilt and prepared to be sent to Plum Brook. In Plum Brook, the vehicle will be tested in the thermal-vacuum chamber to demonstrate that integrated lox-methane propulsion system operation in space-like conditions. This internship has allowed me the opportunity to gain valuable hands on experience and to develop skills that will aid in my education as well as in the workforce, while at the same time helping me determine that I would like to further pursue a career in propulsion engineering.

Chaidez, Mariana↗

The International Space Station (ISS) Port 1 (P1) External Active Thermal Control System (EATCS) Ammonia Leak

Ammonia is used in the Starboard 1 (S1) and Port 1 (P1) External Active Thermal Control System (EATCS) to cool the pressurized modules, and some of the external electrical power distribution hardware. Leaks that develop in these critical cooling systems that deplete in-line tanks can ultimately result in loss of cooling, which can have devastating impacts to the mission, science and crew onboard the ISS. A slow ammonia leak was initially observed from the P1 EATCS in 2011, but later in 2013 the leak rate began to accelerate. The ammonia inventory eventually began to decay exponentially, raising concerns that the inventory could drop to levels where the system would not be operational.The Robotic External Leak Locator (RELL) was built and launched to the ISS to detect and help locate ammonia leaks using the ISS Robotic Arm and remote ground operator control without constant crew involvement. RELL pinpointed the ammonia leak to the two flexible jumper hose assemblies connecting one of two fluid loops in one of the three deployable radiators to the P1 EATCS. The ammonia inside the two hose assemblies and that radiator fluid loop was isolated and vented to space in 2017. This stopped the leak and an Extravehicular Activity was conducted to remove the two hose assemblies so they could be returned to ground for further Test, Teardown and Evaluation (TT&E). The purpose of this presentation is to discuss this leakage scenario and the TT&E efforts.

Cowan, Darnell T.↗

Issues and Design Drivers for Deep Space Habitats

A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble a 5-module vehicle for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues include: a) Launch loads: Potentially drives layout of equipment mounted to module floors or walls, and whether temporary internal structure is required to distribute launch loads to minimize shell mass; b) Unmanned loiter time: When added to an already lengthy mission, loiter time further drives risk and reliability, and poses issues for equipment shelf life such as material degradation or cryogenic fluids boil-off; c) Pointing and Visibility: A habitat embedded in a 5-module stack may drive Communications, Tracking, Guidance, and Navigation equipment out onto long booms to maintain line-of-sight visibility with targets. However, long booms will be more susceptible to disruption from exercise-induced vibration, potential damage during docking/undocking operations, and increased power distribution mass; d) Water: although it is assumed that a water processor will collect and recycle water, several interesting question were posed, such as: How much water to start with? Should potable water serve double-duty as radiation protection? And if so, should it be stowed in a single large tank, or smaller, portable containers? e) Design for repairability: one of the worst-case scenarios identified was a cabin depressurization that required suited repair from inside the module, potentially driving the need for long umbilical hoses or special equipment to allow smaller, mated modules to be used as safe havens for up to 180 days;

Anderson, Molly S.↗

Robonaut 2 - IVA Experiments On-Board ISS and Development Towards EVA Capability

Robonaut 2 (R2) has completed its fixed base activities on-board the ISS and is scheduled to receive its climbing legs in early 2014. In its continuing line of firsts, the R2 torso finished up its on-orbit activities on its stanchion with the manipulation of space blanket materials and performed multiple tasks under teleoperation control by IVA astronauts. The successful completion of these two IVA experiments is a key step in Robonaut's progression towards an EVA capability. Integration with the legs and climbing inside the ISS will provide another important part of the experience that R2 will need prior to performing tasks on the outside of ISS. In support of these on-orbit activities, R2 has been traversing across handrails in simulated zero-g environments and working with EVA tools and equipment on the ground to determine manipulation strategies for an EVA Robonaut. R2 made significant advances in robotic manipulation of deformable materials in space while working with its softgoods task panel. This panel features quarter turn latches that secure a space blanket to the task panel structure. The space blanket covers two cloth cubes that are attached with Velcro to the structure. R2 was able to open and close the latches, pull back the blanket, and remove the cube underneath. R2 simulated cleaning up an EVA worksite as well, by replacing the cube and reattaching the blanket. In order to interact with the softgoods panel, R2 has both autonomously and with a human in the loop identified and localized these deformable objects. Using stereo color cameras, R2 identified characteristic elements on the softgoods panel then extracted the location and orientation of the object in its field of view using stereo disparity and kinematic transforms. R2 used both vision processing and supervisory control to successfully accomplish this important task. Teleoperation is a key capability for Robonaut's effectiveness as an EVA system. To build proficiency, crewmembers have attempted increasingly difficult tasks using R2 inside the Station. After donning motion capture equipment and a virtual reality visor, Expedition 34/35 flight engineer Tom Marshburn began operations with simple hand movements. Having gained confidence, Marshburn guided R2's arms in a leader-follower exercise with crewmate Chris Cassidy. He was also able to use the hand to grab a tumbling roll of tape, a task only demonstrable in microgravity. Later efforts saw Cassidy handle softgoods through shared control with ground operators, mimicking an activity previously achieved using only autonomy. Robotic climbing through the ISS on handrails requires both precision motion and compliant grasps in order to both position grippers on handrails/seat track and prevent large internal forces. R2 climbs using actively controlled compliance and torque limiting to meet both the precision and softness requirements. During a step, the attached leg is controlled to be strong and stiff in order to maintain precision trajectory tracking. The swing leg is controlled to be stiff but weak to minimize unintentional impact forces while maintaining precision. During a simulated dual limb grasp (as shown in Figure 1), the R2 controller maintains one limb rigid and one limb soft to prevent large internal forces from building up. R2's grippers also use a form of force control to limit grip force while not fully closed on either a handrail or seat track thus limiting unintentional forces on cables/objects that may be present in R2's translational path. The on-board torso R2 safety system relies on a single end-effector velocity limit to prevent potential impact forces from exceeding Station maximum load requirements. R2's mobile configuration required modifications to the velocity limiting safety function due to its large, dynamic inertia. R2's legs maneuver the robot's mass creating configuration dependent, joint-relative inertias. A single all-encompassing velocity limit to cover worst case inertia is prohibitively low. The upgraded R2 control and safety systems solve this problem using momentum limiting, momentum control, and kinetic energy minimization. Momentum and kinetic energy take the robot mass into account relieving low velocity restrictions on low inertia end-effectors while ensuring that the overall mass of R2 is limited from hazardous velocities. The momentum of R2's five safety nodes (each of the four end-effectors and the body) is monitored and compared to a single momentum limit. If any of the five nodes exceeds the safety limit, the motor power is removed and the robot comes to a stop. Momentum control/limiting also provides a simple, reliable method to integrate hand held tools into the safety system by providing the tool mass to the control system thus automatically reducing the allowable velocity of the end-effector with the tool. Work on the ground continues to build the skill set for an EVA Robonaut. Recent experiments (Figure 2) demonstrate how a teleoperator can use R2 to manipulate a tether hook, an important safety precaution on spacewalks. Another task displayed Robonaut's ability to pull back a protective jacket over a hose and search for damage, as well as inspect a quick-disconnect fitting for debris. Demonstrations such as these are indicative of EVA work done on ISS, specifically seen during a series of spacewalks over 2012 and 2013 where astronauts searched for an ammonia leak in one of the external cooling loops. Through experiments both on ISS and on the ground, R2 is evolving and providing the information needed to plan out the upgrades that will make an EVA Robonaut an effective tool. With the addition of legs, R2 will start climbing inside the space station and supply invaluable information on how the climbing strategies and task stabilization techniques must be refined. Ground R2 systems will continue to work with additional EVA tools and equipment in preparation for onboard IVA testing and future EVA applications.

Diftler, Myron↗