Search NASA⌕ Search

SEARCH · Search NASA

Results for “improving steam system performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

Reed, Gary↗

CIRCULATING MOVING BED COMBUSTION PROOF OF CONCEPT

Circulating Moving Bed (CMB) combustion technology has its roots in traditional circulating fluidized bed technology and involves a novel method of solid fuel combustion and heat transfer. CMB technology represents a step change in improved performance and cost relative to conventional PC and FBC boilers. The CMB heat exchanger preheats the energy cycle working fluid, steam or air, to the high temperature levels required in systems for advanced power generation. Unique features of the CMB are the reduction of the heat transfer surfaces by about 60% as a result of the enhanced heat transfer rates, flexibility of operation, and about 30% lower cost over existing technology. The CMB Phase I project ran from July 2001 through March 2003. Its objective was to continue development of the CMB technology with a series of proof of concept tests. The tests were conducted at a scale that provided design data for scale up to a demonstration plant. These objectives were met by conducting a series of experiments in ALSTOM Power’s Multi-use Test Facility (MTF). The MTF was modified to operate under CMB conditions of commercial interest. The objective of the tests were to evaluate gas-to-solids heat transfer in the upper furnace, assess agglomeration in the high temperature CMB bubbling bed, and evaluate solids-to-tube heat transfer in the moving bed heat exchanger. The Phase I program results showed that there are still some significant technical uncertainties that needed to be resolved before the technology can be confidently scaled up for a successful demonstration plant design. Work remained in three primary areas: • scale up of gas to solid heat transfer • high temperature finned surface design • the overall requirements of mechanical and process design. The CMB Phase II workscope built upon the results of Phase I and specifically addressed the remaining technical uncertainties. It included a scaled MTF heat transfer test to provide the necessary data to scale up gas-to-solids heat transfer. A stress test rig was built and tested to provide validation data for a stress model needed to support high temperature finned surface design. Additional cold flow model tests and MTF tests were conducted to address mechanical and process design issues. This information was then used to design and cost a commercial CMB design concept. Finally, the MBHE was reconfigured into a slice arrangement and tested for an extended duration at a commercial CFB plant.

42 ENGINEERING↗

Coal Direct Chemical Looping Retrofit to Pulverized Coal Power Plants for In-Situ CO2 Capture

A novel Coal Direct Chemical Looping (CDCL) system is proposed to effectively capture CO2 from existing PC power plants. The work during the past three years has led to an oxygen carrier particle with satisfactory performance. Moreover, successful laboratory, bench scale, and integrated demonstrations have been performed. The proposed project further advanced the novel CDCL technology to sub-pilot scale (25 kWth). To be more specific, the following objectives attained in the proposed project are: 1. to further improve the oxygen carrying capacity as well as the sulfur/ash tolerance of the current (working) particle; 2. to demonstrate continuous CDCL operations in an integrated mode with > 99% coal (bituminous, subbituminous, and lignite) conversion as well as the production of high temperature exhaust gas stream that is suitable for steam generation in existing PC boilers; 3. to identify, via demonstrations, the fate of sulfur and NOx; 4. to conduct thorough techno-economic analysis that validates the technical and economical attractiveness of the CDCL system. The objectives outlined above were achieved through collaborative efforts among all the participants. CONSOL Energy Inc. performed the techno-economic analysis of the CDCL process. Shell/CRI was able to perform feasibility and economic studies on the large scale particle synthesis and provide composite particles for the sub-pilot scale testing. The experience of B&W (with boilers) and Air Products (with handling gases) assisted the retrofit system design as well as the demonstration unit operations. The experience gained from the sub-pilot scale demonstration of the Syngas Chemical Looping (SCL) process at OSU was able to ensure the successful handling of the solids. Phase 1 focused on studies to improve the current particle to better suit the CDCL operations. The optimum operating conditions for the reducer reactor such as the temperature, char gasification enhancer type, and flow rate were identified. The modifications of the existing bench scale reactor were completed in order to use it in the next phase of the project. In Phase II, the optimum looping medium was selected, and bench scale demonstrations were completed using them. Different types of coal char such as those obtained from bituminous, subbituminous, and lignite were tested. Modifications were made on the existing sub-pilot scale unit for coal injection. Phase III focused on integrated CDCL demonstration in the sub-pilot scale unit. A comprehensive ASPEN® simulations and economic analysis was completed by CONSOL t is expected that the CDCL process will be ready for further demonstrations in a scale up unit upon completion of the proposed project.

Zeng, Liang↗

Olkiluoto 1 and 2 - Plant efficiency improvement and lifetime extension-project (PELE) implemented during outages 2010 and 2011

Teollisuuden Voima Oyj (TVO) is a non-listed public company founded in 1969 to produce electricity for its stakeholders. TVO is the operator of the Olkiluoto nuclear power plant. TVO follows the principle of continuous improvement in the operation and maintenance of the Olkiluoto plant units. The PELE project (Plant Efficiency Improvement and Lifetime Extension), mainly completed during the annual outages in 2010 and 2011, and forms one part of the systematic development of Olkiluoto units. TVO maintains a long-term development program that aims at systematically modernizing the plant unit systems and equipment based on the latest technology. According to the program, the Olkiluoto 1 and Olkiluoto 2 plant units are constantly renovated with the intention of keeping them safe and reliable, The aim of the modernization projects is to improve the safety, reliability, and performance of the plant units. PELE project at Olkiluoto 1 was done in 2010 and at Olkiluoto 2 in 2011. The outage length of Olkiluoto 1 was 26 d 12 h 4 min and Olkiluoto 2 outage length was 28 d 23 h 46 min. (Normal service-outage is about 14 days including refueling and refueling-outage length is about seven days. See figure 1) The PELE project consisted of several single projects collected into one for coordinated project management. Some of the main projects were as follows: - Low pressure turbines: rotor, stator vane, casing and turbine instrumentation replacement. - Replacement of Condenser Cooling Water (later called seawater pumps) pumps - Replacement of inner isolation valves on the main steam lines. - Generator and the generator cooling system replacement. - Low voltage switchgear replacement. This project will continue during future outages. PELE was a success. 100 TVO employees and 1500 subcontractor employees participated in the project. The execution of the PELE projects went extremely well during the outages. The replacement of the low pressure turbines and seawater pumps improved the efficiency of the plant units, and a power increase of nearly 20 MW was achieved at both plant units. PELE wonderfully manifests one of the strategic goals of our company; developing the competence of our in-house personnel by working in projects. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electrochemically Engineered, Highly Energy-Efficient Conversion of Ethane to Ethylene and Hydrogen below 550 °C in a Protonic Ceramic Electrochemical Cell

Ethylene is one of the largest building blocks in the petrochemical industry, mainly produced by steam cracking of ethane derived from naphtha or shale gas at high temperatures (>800 °C). Despite its technical maturity and economic competitiveness, the thermal steam cracking of ethane is highly energy-intensive. In this work, an electrochemically engineered direct conversion process of ethane to produce hydrogen and ethylene using a planar protonic ceramic membrane reactor with a bi-functional three-dimensional catalytic electrode is reported, with a single-pass ethane conversion of 40% and ethylene yield of 26.7% at 550 °C. Compared with the industrial ethane steam cracking, this method saves process energy input by 45.1% and improves process energy efficiency by 50.6%, based on comprehensive process simulation using Aspen Plus software. Further, steam electrolysis treatment under the solid oxide electrolysis cell mode can regenerate the system’s catalytic performance and significantly alleviate catalytic degradation by 74%, demonstrating high techno-economic viability.

bi-functional electrode↗

MEASUR - Manufacturing Energy Assessment Software for Utility Reduction

MEASUR your energy savings with the free DOE MEASUR software The Department of Energy (DOE), with Oak Ridge National Laboratory (ORNL), released version 1.0 of their energy efficiency software tool MEASUR (Manufacturing Energy Assessment Software for Utility Reduction). MEASUR has been available for several years as a beta version, being tested by industry experts and real users, and will continue to be updated and improved in the coming years. It is an integrated suite of tools to aid manufacturers in improving the efficiency of energy systems and equipment within a plant, including motors, pumps, fans, process heating, steam, and compressed air. Additionally, there are modules for wastewater energy analysis and to help perform energy treasure hunts. Several calculators are also included, allowing users to independently perform smaller calculations and analyses (such as estimating pump head, performing a fan traverse analysis, estimating waste heat recovery potential, and cataloging compressed air leaks). The MEASUR modules are based on previous DOE software tools that have been used by industry since the early 2000s (such as MotorMaster, AirMaster+, PSAT, PHAST, and FSAT). The original tools only ran on Windows operating systems, and by Windows 10, most of them were inoperable. DOE started their energy efficiency software tool revitalization effort in 2016, first with PSAT (for pumps), then began to integrate the other tools and expand their functionality and utility. The new MEASUR suite provides an extensively more user-friendly, modern, and versatile set of tools. All the assessment modules and most of the calculators have several visual components and graphs and detailed help text for every user input. To help reach international users, the tool utilizes Google translate and users can easily change unit systems, even converting existing user inputs if desired. The assessment files can be organized within the internal file system and easily shared to other users, regardless of their operating system. The entire suite is free, open-source, and can be downloaded on Windows, Mac, or Linux operating systems.

Accawi, Gina [Oak Ridge National Lab. (ORNL), Oak ↗

Overview of the U.S. DOE Accident Tolerant Fuel Development Program

The United States Fuel Cycle Research and Development Advanced Fuels Campaign has been given the responsibility to conduct research and development on enhanced accident tolerant fuels with the goal of performing a lead test assembly or lead test rod irradiation in a commercial reactor by 2022. The Advanced Fuels Campaign has defined fuels with enhanced accident tolerance as those that, in comparison with the standard UO2-Zircaloy system currently used by the nuclear industry, can tolerate loss of active cooling in the reactor core for a considerably longer time period (depending on the LWR system and accident scenario) while maintaining or improving the fuel performance during normal operations and operational transients, as well as design-basis and beyond design-basis events. This paper provides an overview of the FCRD Accident Tolerant Fuel program. The ATF attributes will be presented and discussed. Attributes identified as potentially important to enhance accident tolerance include reduced hydrogen generation (resulting from cladding oxidation), enhanced fission product retention under severe accident conditions, reduced cladding reaction with high-temperature steam, and improved fuel-cladding interaction for enhanced performance under extreme conditions. To demonstrate the enhanced accident tolerance of candidate fuel designs, metrics must be developed and evaluated using a combination of design features for a given LWR design, potential improvements to that design, and the design of an advanced fuel/cladding system. The aforementioned attributes provide qualitative guidance for parameters that will be considered for fuels with enhanced accident tolerance. It may be unnecessary to improve in all attributes and it is likely that some attributes or combination of attributes provide meaningful gains in accident tolerance, while others may provide only marginal benefits. Thus, an initial step in program implementation will be the development of quantitative metrics. A companion paper in these proceedings provides an update on the status of establishing these quantitative metrics for accident tolerant LWR fuel.1 The United States FCRD Advanced Fuels Campaign has embarked on an aggressive schedule for development of enhanced accident tolerant LWR fuels. The goal of developing such a fuel system that can be deployed in the U.S. LWR fleet in the next 10 to 20 years supports the sustainability of clean nuclear power generation in the United States.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Effect of moderate temperatures on compressive strength of ultra-high-performance concrete: A microstructural analysis

Highlights: • All coarse aggregates and steel fibres were surrounded by the binder. • X-ray diffraction is useful for explaining the increase in compressive strength with increasing temperature. • Rosenhahnite and/or quartz Dauphiné-twinned phases improved the compressive strength. • Polypropylene fibres prevented spalling and preserved the compressive strength. • Concrete with steel and polypropylene fibres did not exhibit spalling at 300 °C. Concrete with two types of steel fibres and a polypropylene fibre prevented spalling and preserved the compressive strength at 300 °C, which makes these concretes suitable for long-term applications up to 300 °C, such as for steam collectors or thermal energy storage systems. The compressive strength behaviour of three types of ultra-high-performance fibre-reinforced concrete manufactured with the same matrix was investigated. For this purpose, a complete characterisation of all the raw materials and the three types of fibres used was performed. The morphology of all concrete mixtures at room temperature was analysed using scanning electron microscopy–energy-dispersive X-ray spectroscopy. From the results, it was ascertained that the steel fibres and coarse siliceous aggregates were not in contact (being separated by ≥3.41 μm) and were surrounded by the binder (of ≥1 μm in thickness) for all the mixtures studied. Rosenhahnite and/or quartz Dauphiné-twinned phases improved the compressive strength (as determined by X-ray diffraction).

36 MATERIALS SCIENCE↗

Analysis of AC-DC Converters for Grid-tied High Temperature Steam Electrolysis Systems

Grid-tied HTSE systems have the prospects to produce clean hydrogen enabling power and broad energy systems decarbonization. Most commercially available power electronic converter systems (PECS) are designed for batteries, solar PVs, wind, and other well-established renewable energy resources. Standards (such as IEEE 1547, UL 1741, CA Rule-21, HI Rule-14) exist for PECS used for renewable energy systems such as battery storage and solar PVs. However, those that consider the dynamic behavior of HTSEs and that can be used for large-scale H2 systems are yet to be developed. This paper investigates the performance of these PECS for the HTSE application that are set up at the Idaho National Laboratory for hydrogen production testing, research and development. In particular, the performance analysis of two grid-tied PECS (A and B) is conducted for a 100 kW solid oxide HTSE system. System A consists of 6 units of 30kW MOSFET-switched bidirectional AC-DC rectifier while system B has a single unit of 150kW thyristor-switched ACDC rectifier. Both systems are connected to the HTSE stacks via a DC-DC converter. Different operational conditions of the HTSE system are tested to analyze the dynamic response of the HTSE’s PECS. The experimental results show the need to develop advanced control strategies for PECS that incorporates the dynamics of HTSE systems for improved performance.

08 - HYDROGEN↗

Model-based Extracted Water Desalination System for Carbon Sequestration

The focus of this research effort centered around water recovery from high Total Dissolved Solids (TDS) extracted waters (180,000 mg/L) using a combination of water recovery (partial desalination) technologies. The research goals of this project were as follows: 1. Define the scope and test location for pilot-scale implementation of the desalination system, 2.Define a scalable, multi-stage extracted water desalination system that yields clean water, concentrated brine, and, salt from saline brines, and 3. Validate overall system performance with field-sourced water using GE pre-pilot lab facilities. Conventional falling film-mechanical vapor recompression (FF-MVR) technology was established as a baseline desalination process. A quality function deployment (QFD) method was used to compare alternate high TDS desalination technologies to the base case FF-MVR technology, including but not limited to: membrane distillation (MD), forward osmosis (FO), and high pressure reverse osmosis (HPRO). Technoeconomic analysis of high pressure reverse osmosis (HPRO) was performed comparing the following two cases: 1. a hybrid seawater RO (SWRO) plus HPRO system and 2. 2x standard seawater RO system, to achieve the same total pure water recovery rate. Pre-pilot-scale tests were conducted using field production water to validate key process steps for extracted water pretreatment. Approximately 5,000 gallons of field produced water was processed through, microfiltration, ultrafiltration, and steam regenerable sorbent operations. Improvements in membrane materials of construction were considered as necessary next steps to achieving further improvement in element performance at high pressure. Several modifications showed promising results in their ability to withstand close to 5,000 PSI without gross failure.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot-Scale Silicone Process for Low-Cost Carbon Dioxide Capture. Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO 2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in a previous funded DOE project (DE-FE0007502), the GAP-1m solvent has increased CO 2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. The current report describes the cooperative program between GE Global Research (GE GRC), and the National Carbon Capture Center (NCCC) to design, construct, and operate a pilot-scale process using GAP-1m solvent to demonstrate its performance at 0.5 MWe. (i) Performance of the GAP-1m solvent was demonstrated in a 0.5 MWe pilot with real flue gas for over 900 hrs. of operation using two alternative desorption designs: a Continuous Stirred Tank Reactor (CSTR), and a Steam Stripper Column (SSC). The CSTR is a one-stage separation unit with reduced space requirements, and capital cost. The alternative is a multi-stage separation column, with improved desorption efficiency. Testing the two desorber options allowed us to identify the most cost effective, and space efficient desorber solution. (ii) CSTR Campaign: The CSTR desorber unit was designed, fabricated and integrated with the pilot solvent test unit (PSTU), replacing the PSTU Steam Stripper Column at NCCC. Solvent management and waste water special procedures were implemented to accommodate operation of the non-aqueous solvent in the PSTU. Performance of the GAP-1m solvent with the CSTR was demonstrated for over 500 hrs. while varying temperature of the desorption (230 – 265 oF), solvent circulation rate (GAP-1m : CO 2 (molar) = 1.5 – 4), and flue gas flow rates (0.2 – 0.5 MWe). Solvent carry-over in the CO 2 product was minimized by maintaining water content below 5 wt.%, and desorption pressure at 7 psig. CO 2 capture efficiency achieved was 95% at 0.25 MWe (GAP-1m : CO 2 = 4 (molar), 230 oF desorption), and 65% at 0.5 MWe (GAP-1m : CO 2 (molar) = 1.5, 248 oF). Solvent loss was dominated by thermal degradation of the rich solvent. (iii) Steam Stripper Column Campaign: Higher expected cost of the solvent vs. aqueous amines makes solvent management a top priority to maintain the low cost for the process. During the testing of the GAP-1m solvent with the CSTR, thermal degradation of the rich solvent was found to be the main mechanism in solvent loss. Small amounts of water in the working solution were found to be an effective way to enable steam stripping, thereby lowering desorption temperature, and hence reducing thermal degradation. Steam stripping also increased working capacity by 30% due to a more efficient desorption. The concept was first tested in a glass stripping column (lab scale, GE GRC), optimized in a continuous bench scale system (2 kWe, GE GRC), and demonstrated in a 0.5 MWe PSTU at NCCC. No special system modifications were required to the PSTU to accommodate the testing of the non-aqueous GAP-1 solvent with the regenerator column. SSC was found to be more robust towards solvent entrainment (H 2 O < 35 wt.%). 90 – 95% CO 2 capture efficiency was achieved under stoichiometric conditions at 0.5 MWe (235 oF desorption, 2 psig and 19 wt. % H 2 O). Both CO 2 capture efficiency and specific duty reached optimum conditions at 18 wt.% H 2 O. Low amine degradation (< 0.05 wt.%/day) was recorded over 350 hrs. of operation. Controlled water addition to GAP-1m solvent decreased the desorption temperature, thermal degradation, and improved the CO 2 working capacity due to more efficient absorption and desorption processes. Under these conditions, the GAP-1m solvent exhibited a 25% increased working capacity, and 10% reduction in specific steam duty vs. MEA, at 10 oF lower desorption temperature. (iv) Techno-economic Analysis: The pilot-scale PSTU engineering data were used to update the capture system process models, and the techno-economic analysis was performed for a 550 MW coal fired power plant. The 1st year CO 2 removal cost for the aminosilicone-based carbon-capture process was evaluated at $48/ton CO 2 using the steam stripper column. This is a 20% reduction compared to MEA, primarily due to lower overall capital cost. CO 2 cost using the CSTR desorber is dominated by the economics of the solvent make-up. The steam stripper desorber is the preferred unit operation due to a more efficient desorption, and reduced solvent make-up rate. Further reduction in CO 2 capture cost is expected by lowering the manufacturing cost of the solvent, implementing flowsheet optimization and/or implementing the next generation aminosilicone solvent with improved stability and increased CO 2 working capacity.

0.5 MW Pilot↗

Material technology

Advanced high pressure O2/H2 propulsion systems as exemplified by the Space Shuttle Main Engine (SSME) create challenging operating environments for materials. Many components operate in either hydrogen or hydrogen-steam environments which may significantly degrade the performance of common alloys. The objective of the materials technology projects is to develop and evaluate candidate materials for application in advanced high pressure O2/H2 propulsion systems. These new and improved materials are to improve the durability or performance of the SSME or derivative engine. The program includes projects on the following topics: (1) Hydrogen Resistant Alloys; (2) High Pressure O2 Ignition and Burning; (3) Improved Turbine Blades; (4) Improved Turbine Disk Material; (5) Impact Reactivity in High Pressure O2; and Fiber Reinforced Superalloys.

Dreshfield, R. L.↗

System Modeling of ORNL s 20 MW(t) Wood-fired Gasifying Boiler

We present an overview of the new 20 MW(t) wood-fired steam plant currently under construction by Johnson Controls, Inc. at the Oak Ridge National Laboratory in Tennessee. The new plant will utilize a low-temperature air-blown gasifier system developed by the Nexterra Systems Corporation to generate low-heating value syngas (producer gas), which will then be burned in a staged combustion chamber to produce heat for the boiler. This is considered a showcase project for demonstrating the benefits of clean, bio-based energy, and thus there is considerable interest in monitoring and modeling the energy efficiency and environmental footprint of this technology relative to conventional steam generation with petroleum-based fuels. In preparation for system startup in 2012, we are developing steady-state and dynamic models of the major process components, including the gasifiers and combustor. These tools are intended to assist in tracking and optimizing system performance and for carrying out future conceptual studies of process changes that might improve the overall energy efficiency and sustainability. In this paper we describe the status of our steady-state gasifier and combustor models and illustrate preliminary results from limited parametric studies.

09 BIOMASS FUELS↗

Catalytic and electrocatalytic performance of Sr(Ti 0.3 Fe 0.7 Ru 0.07 )O 3-δ for applications in solid oxide fuel cells supplied with ethanol steam reforming mixtures

We discuss how direct utilization of alcohols in Solid Oxide Fuel Cells (SOFCs) can improve the conversion efficiency by using excess heat for internal reforming and simplify the system balance of plant. Thanks to their scarce carbon- formation tendency, perovskite oxide anodes are promising alternatives to Ni-based cermets. Here we show that Sr(Ti 0.3 Fe 0.7 Ru 0.07 )O 3-δ (STF-Ru) exsolution anodes provide both catalytic reforming activity and electro- chemical activity with steam/ethanol (S/E) mixtures at 3:1 and 2:1 M ratio between 700 and 800 °C. Electrolyte- supported scandia stabilized zirconia SOFCs with STF-Ru anodes and Sr 0.95 Ti 0.3 Fe 0.7 O 3-δ (STF) cathodes are reasonably stable in the 3:1 S/E mixture over 20 h at 800 °C, with maximum power density of 195 mW/cm 2 and 140 mW/cm 2 at 0.7 V. Deactivation instead occurs with the 2:1 S/E mixture. Comparatively, cells with Ni-YSZ anodes rapidly coke and fail under the same conditions. Ethanol steam reforming experiments in a fixed bed powder reactor reveal that, above 650 °C, gas phase reactions convert ethanol to CO, hydrogen, acetaldehyde and ethylene, while STF-Ru catalyzes steam reforming. Thermogravimetric and Raman characterizations show that a moderate amount of carbon is deposited on the STF-Ru surface, which is more amorphous than the disruptive carbon which degrades Ni-YSZ.

09 BIOMASS FUELS↗