Real-Time Edge AI for Distributed Systems (READS): Progress on Beam Loss De-Blending for the Fermilab Main Injector and Recycler

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Beam losses in the Main Injector enclosure are monitored for tuning the accelerators and machine protection. Losses are currently attributed to a specific machine based on timing. However, this method alone is insufficient and often inaccurate, resulting in more difficult machine tuning and unnecessary machine downtime. Machine experts can often distinguish the correct source of beam loss. This suggests a machine learning (ML) model may be producible to help de-blend losses between machines. Work is underway as part of the Fermilab Real-time Edge AI for Distributed Systems Project (READS) to develop a ML empowered system that collects streamed BLM data and additional machine readings to infer in real-time, which machine generated beam loss.

43 PARTICLE ACCELERATORS↗

CEBAF Injector Model for KL Beam Conditions

The Jefferson Lab KL experiment will run at the Continuous Electron Beam Accelerator Facility with a much lower bunch repetition rate (7.80 or 15.59 MHz) than nominally used (249.5 or 499 MHz). While the proposed average current of 2.5 - 5.0 muA is relatively low compared to the maximum CEBAF current of approximately 180 muA, the corresponding bunch charge is atypically high for CEBAF injector operation. In this work, we investigated the evolution and transmission of low-rep-rate, high-bunch-charge (0.32 to 0.64 pC) beams through the CEBAF injector. Using the commercial software General Particle Tracer, we have simulated and analyzed the beam characteristics for both values of bunch charge. We performed these simulations with the existing injector using a 130 kV gun voltage. We have calculated and measured the transmission as a function of the photocathode laser spot size and pulse length. We report on the findings of these simulations and optimum parameters for operating the experiment.

Pokharel, Sunil↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

The upcoming Jefferson Lab K-Long experiment at Hall D will require unique beam conditions with a much lower bunch repetition rate and atypically high bunch charge. To optimize the Continuous Electron Beam Accelerator Facility (CEBAF) injector for this experiment, we performed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) to determine the magnetic elements and RF settings necessary for the K-long bunch charge (0.64 pC) at 200 kV. We also investigated the transmission and beam characteristics of low to high charge per bunch electron beams through the injector for simultaneous operations of all four CEBAF Halls and characterized the transmission as a function of the photocathode laser spot size and pulse length. Our findings provide valuable insights into optimizing the CEBAF injector for the Jefferson Lab K-Long experiment, as well as for other experiments with similar beam conditions

Kazimi, R.↗

Modeling for the phased injector upgrade for 12 GeV CEBAF

As a follow on to the 12 GeV upgrade to the Continuous Electron Beam Accelerator Facility, the front end of the DC photo-gun-based injector has gone through a phased upgrade. The first phase focused on the beamline between the gun and the RF chopper system, and the second phase addresses the beamline after the RF chopper system including replacing the capture section and quarter cryomodule with a new booster module containing a 2-cell and 7-cell cavity string. Throughout the design process, we maintained and developed three models, one for the existing injector and one for each of the upgrade phases. With these models, we evaluated proposed hardware upgrades, evaluated and determined optimized beamline element positions, developed buncher voltage requirements, and settings for optimal injector running. In this paper, we will describe the models and results from these various studies and provide a brief summary of Phase 1 commissioning.

Kazimi, R.↗

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler

The Fermilab Main Injector system delivers 700 kW of 120 GeV Proton beam for neutrino experiments. Since 2013 this has been achieved using slip stacking accumulation in the Recycler with up to 12 batches from the Fermilab Booster per Main Injector Ramp Cycle. To control activation from beam loss, collimation systems in the Booster to Recycler transfer line, in the Recycler and in the Main Injector are employed. Residual radiation measurements around the ring with detailed studies at the collimators are required to maintain adequate loss control. We will review design considerations, operational parameters and activation results for more than ten years of operation. Simulations with MARS15 are used to explore the activation rates and the isotopic composition of the resulting activation.

43 PARTICLE ACCELERATORS↗

Improvements to the Recycler/Main Injector to Deliver 850 kW+

The Main Injector is used to deliver a 120 GeV high power proton beam for Neutrino experiments. The design power of 700 kW was reached in early 2017 but further improvements have seen a new sustained peak power of 893 kW. Two of the main improvements include the shortening of the Main Injector ramp length as well optimizing the slip-stacking procedure performed in the Recycler to reduce the amount of uncaptured beam making its way into the Main Injector. These improvements will be discussed in this paper as well future upgrades to reach higher beam powers.

43 PARTICLE ACCELERATORS↗

An expanded kinetics model describing injector region desorption

During the initial stages of electron beam injection, absorbed or entrained material can be released into the nascent beam pulse by thermal desorption or electron beam impact. These processes, and subsequent ionization and dissociation, are examined assuming a prototypical temporal beam pulse. An expanded set of kinetic equations that includes thermal desorption, electron-stimulated ion emission, electron impact dissociation, electron impact ionization, and thermal decomposition of adsorbed water molecules is developed. Estimates of the three most important ionized species H 2 O + , H + and OH + are provided for typical injector conditions. Electron impact dissociative ionization of neutral H 2 O is the dominant source of H + under these conditions. Since the abundance of thermally desorbed neutral H 2 O has an exponential rate, the production of H+ is likewise controlled by this exponential desorption rate. Thus thermal management of the confining walls could suppress proton production in the injector region. Thermal decomposition of H 2 O will not be a contributing physical process in the injector region on time scales less than a μs. The formalism is sufficiently flexible to include entrained hydrogen.

42 ENGINEERING↗

Beam Spill in Downstream Transport due to Injector Faults [PowerPoint]

We have investigated injector faults with numerical experiments. For this investigation we used the nominal tune that is also being used to assess beam stability. Beam spill in the DST due to a serious injector fault was evaluated using the LSP slice algorithm. Only the most serious fault investigated (-350 keV) caused beam spill in the DST. DST transport focusing solenoids limit the beam spill. Beam spill in the DST is the result of large halo caused by betatron oscillations of the mismatched beam. Bremsstrahlung radiation from the DST beam spill was estimated from Tom Martin scaling normalized to DARHT-I. In conclusion, Scorpius is reasonably safe from beam spill radiation in the DST due to injector faults.

43 PARTICLE ACCELERATORS↗

Fermilab Main Injector and Recycler Operations in the Megawatt Era

Significant upgrades to Fermilab’s accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the NuMI (Neutrinos at the Main Injector) beam for the first time this year through changes to the Recycler slip-stacking procedure and shortening of the Main Injector ramp time. The modifications to the Recycler slip-stacking and efforts to reduce the duration of the Main Injector ramp will be discussed. Additionally, details regarding further shortening of the ramp time and the subsequent impacts on future accelerator operations are presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The 2024 Run in the Injectors

The injectors provided polarized protons to RHIC for most of Run 24. That was followed by 3 weeks of Gold at 9.8 GeV/n using Tandem. Physics with PP was first declared on May 1 st and the PP portion of the run ended on Sept. 30 th . The standard BU4/AU4 setup was used for most of it. Although, from Sept. 7 th to 30 th the AGS skew quad setup (BU4/AU6) was used instead. More work was done on the Split/Merge setup (BU3/AU3) initially developed in Run 22. A two Linac pulse setup was also developed this run (BU4/AU2). As far as PP work in the injectors goes this note will focus on the standard, Split/Merge, and Two Linac pulse setups. The 9.8 GeV/n Tandem Au setup was essentially the same as in Run 23. The injector setup for Helium-3 from EBIS (BU7/AU7), which was used for an APEX study in RHIC on August 7 th , will be covered as well.

43 PARTICLE ACCELERATORS↗

Low-energy H- beam injectors for particle accelerators: upgrade requirements, challenges and future plans [Slides]

High brightness, negative hydrogen ion sources are used extensively in large, accelerator-based, user facilities operating worldwide. Negative hydrogen beams have become the preferred means of filling circular accelerators and storage rings as well as enabling efficient extraction from cyclotrons. Much larger beams of H- ions are also utilized for neutral beams injection into fusion machines and will be discussed in a separate companion presentation. Some of the accelerator facilities include the US Spallation Neutron Source (SNS), Japan Proton Accelerator Research Complex (J-PARC), Rutherford Appleton Laboratory (RAL-ISIS), Los Alamos Neutron Science Center (LANSCE), Fermi National Accelerator Laboratory (FNAL), Brookhaven National Laboratory (BNL), the CERN LHC injector, the Chinese Spallation Neutron Source (CSNS) as well as numerous installations of D-Pace (licenced by TRIUMF) ion sources used mainly with cyclotrons. Many facilities are currently working on various improvement / upgrade projects, both in the near and long term, which are driving further development of their ion source and LEBT (Low Energy Beam Transport) and, in some cases, their overall front end injector system. This report will first provide a simple description of each facilities existing ion source and LEBT and summarize the operational parameters which are currently being routinely injected into their accelerators. Next, the parametric goals of each of the facilities upgrade projects are specified as well as development efforts currently underway to meet these requirement and improvement goals. It is hoped that that this work will not only capture the current state-of-the-art of worldwide H- beam injectors and clarify the research goals and efforts of the community in general but will also encourage further inter laboratory collaborations.

43 PARTICLE ACCELERATORS↗

Selection of Target Thickness and Size of Drive Electron Beam for Ce+BAF Injector

A baseline concept for a continuous wave (CW) polarized positron injector was developed for the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab. This concept is based on the generation of CW longitudinally polarized positrons by a high-current, polarized electron beam (1 mA, 130-370 MeV, and 90% longitudinal polarization) that passes through a rotating, water-cooled, tungsten target. The positron yield and longitudinal polarization are calculated for the 123 MeV Ce+BAF injector at the Low Energy Recirculator Facility (LERF). The longitudinal and transverse CEBAF acceptances, defined as an energy spread of less than 1% and a normalized emittance of less than 100 mm·mrad, have been used in these calculations. The impact of target thickness, transverse electron beam size, and electron beam energy on the yield and polarization of a positron injector is evaluated. The total energy deposited by the beams in the tungsten target and the peak energy density are calculated for different target thicknesses, electron beam sizes, and energies.

Ushakov, Andriy [Thomas Jefferson National Acceler↗

Comparison of Microbial Profiling and Tracer Testing for the Characterization of Injector-Producer Interwell Connectivities

Insufficient understanding of the microbial communities and associated microbial processes in geological reservoirs hinders the utilization of this rich data source for improved resource management. In this study, along with four interwell tracer tests at a 1478-m deep fractured crystalline-rock aquifer, we analyzed the microbial communities in the injected and produced water by high-throughput sequencing. The microbial community similarities across boreholes during an interwell flow scenario frequently encountered in reservoir development was explored. Despite the significant tracer recoveries (~30%) in all tracer tests and the cumulatively >100,000 L of exogenous water (carrying exogenous microbes) injected into the 10-m-scale reservoir, the overall structure of produced-fluid microbiome did not increasingly resemble that of the injectate. However, producers with better connectivity with the injector (based on tracer test results) did have more amplicon sequence variants (ASVs) that overlapped with those in the injectate. We identified possible drivers behind our observations and verified the practicality of repeated microbial sampling in the context of reservoir characterization and long-term monitoring. We highlight that injector-producer microbial profiling could provide insights on the relative connectivities across different producers with a given injector, and that the associated logistical needs may be comparable or even less than that of classic tracer tests.

59 BASIC BIOLOGICAL SCIENCES↗

Turbine nozzle cooling with panel fuel injector

The present disclosure is directed to a combustion system including a panel fuel injector. The panel fuel injector includes a first side wall, a second side wall, and an aft wall. The first side wall and the second side wall are interconnected by the aft wall. The panel fuel injector further includes a cooling air plenum that is defined between the first side wall and the second side wall. The aft wall defines a plurality of cooling holes in fluid communication with the cooling air plenum. One or more of the cooling holes of the plurality of cooling holes is oriented towards at least one of a leading edge, a pressure side wall, or a suction side wall of a stationary nozzle disposed proximate to the aft end wall.

33 ADVANCED PROPULSION SYSTEMS↗

Combustion system with panel fuel injector

The present disclosure is directed to an annular combustion system. The annular combustion system includes an inner liner and an outer liner that define therebetween an annulus that circumscribes a centerline of the combustion system. The annulus includes a plurality of primary combustion zones defined at an upstream end thereof and further defines a plurality of secondary combustion zones downstream of the primary combustion zones. The annular combustion system further includes a plurality of fuel nozzles where at least one fuel nozzle discharges a combustible mixture into a respective primary combustion zone of the plurality of primary combustion zones. A plurality of panel fuel injectors is disposed between adjacent fuel nozzles. The plurality of panel fuel injectors extends in an axially downstream direction so as to separate adjacent primary combustion zones. Each panel fuel injector discharges a combustible mixture into at least one secondary combustion zone.

42 ENGINEERING↗

Fuel injector with duct assembly

Methods and systems are provided for a fuel injector of an internal combustion engine. In one example, a fuel injector includes a body having a flange shaped to seat within a shoulder of a passage of a cylinder head. The shoulder is positioned at an inner side of the cylinder head such that the fuel injector is coupled to the cylinder head at the inner side by the flange.

Kurtz, Eric↗

Fermilab Main Injector and Recycler Operations in the Megawatt Era

Significant upgrades to Fermilab's accelerator complex have accompanied the development of LBNF (the Long Baseline Neutrino Facility) and DUNE (Deep Underground Neutrino Experiment). These improvements will facilitate 1-MW operation of the NuMI (Neutrinos at the Main Injector) beam for the first time this year through changes to the Recycler slip-stacking procedure and shortening of the Main Injector ramp time. The modifications to the Recycler slip-stacking and efforts to reduce the duration of the Main Injector ramp will be discussed. Additionally, details regarding further shortening of the ramp time and the subsequent impacts on future accelerator operations are presented.

43 PARTICLE ACCELERATORS↗

Modeling the CEBAF Injector at 200 kV: Investigating K-Long Beam Conditions with and without Wien Filter

The upcoming K-Long experiment [1] ain Hall D at Jefferson Lab presents unique beam requirements, featuring a significantly low bunch repetition rate and an unusually high bunch charge. This experiment, which utilizes the CEBAF accelerator in conjunction with the GlueX experimental setup, aims to study strange hadron spectroscopy by measuring the differential cross section and polarizations of produced hyperons such as Λ, Σ, Ξ, and Ω. By directing an intense K-Long beam towards the LD2/LH2 target, new and valuable data can be obtained. To optimize the CEBAF injector specifically for this experiment, we employed Multi-Objective Genetic Optimization (MGO) using General Particle Tracer (GPT) simulations. Through this approach, we determined the optimal magnetic elements and radiofrequency (RF) settings required to achieve a K-Long bunch charge of 0.64 pC at an energy of 200 kV. We conducted simulations with both the Wien Filter turned on and off to examine its impact on the beam. Furthermore, we investigated the transmission efficiency and beam characteristics of electron beams with varying charge per bunch through the injector, considering the simultaneous operation of all four CEBAF Halls. The results of our study offer valuable insights and guidance for optimizing the CEBAF injector not only for the Jefferson Lab K-Long experiment but also for other experiments that entail similar beam conditions.

Pokharel, Sunil↗