Search NASA⌕ Search

SEARCH · Search NASA

Results for “installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Trends in Installer Strategy and Customer Choice on a Solar PV Financing Platform

In this study, we explore how solar photovoltaic (PV) installer strategies have changed over time with respect to PV financing products and how these strategies affect PV customer choice. We use a novel data set from obtained from a software platform that connects installers to institutional investors and helps installers generate financed quotes. This data set enables us to explore the behaviors of small and mid-scale installers, whose market strategies have largely been unknown owing to lack of data. We find that the financing platform extends access to financing to small- and mid-scale installers, that installers have shifted toward power purchase agreements over time, that installers appear to modify strategies in reaction to various policy and market drivers, and that installers tend to 'lock in' to a specific strategy.

14 SOLAR ENERGY↗

Update on Geothermal Direct-Use Installations in the United States

Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

15 GEOTHERMAL ENERGY↗

GHEP WIBT (Guidelines for Home Energy Professionals Weatherization Installer Badges Toolkit) [SWR-20-69]

The National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy's (DOE) Weatherization Assistance Program (WAP) are collaborating with the home energy retrofit industry to support the development of skilled workers. The Installer Badges Toolkit provides a flexible, customizable, and voluntary approach to training and skills recognition for WAP implementers, utility programs, private-sector workers, and contractors. In Fiscal Year 2018, DOE, along with the Crew Leader scheme committee, determined the Retrofit Installer Technician (RIT) Job Task Analysis (JTA) could be eliminated and its tasks inserted in the Crew Leader JTA. The RIT tasks became the basis of the Installer Badges. The Badges Toolkit was updated in 2020 to add licensing and copyright agreements. Users must cite the copyright information when using or distributing copies of the Badges Toolkit in any way. The technical content has remained unchanged from previous versions of the Badges Toolkit. The Toolkit for home retrofits consists of 25 Badges, each representing different energy efficiency tasks that an installer could perform on a home. Each Badge defines the desired outcome, criteria to verify, applicable material requirements, and references to Standard Work Specifications (SWS) or other relevant standards. The Badges provide a consistent approach to training by ensuring that installers in different regions are learning the same skills nationwide. Organizations can also customize the Toolkit by choosing only those Badges that are relevant to their program. The Badges Toolkit includes five pieces: "How to Use the Badges Toolkit" provides a brief overview of how a Grantee, Subgrantee, or training provider may approach using the toolkit. The "Badges Toolkit: Worksheet" includes what to consider when determining whether and how to best incorporate the Badges into a weatherization assistance program. The "Crew Leader Job Task Analysis Spreadsheet" indicates how the Badges align with specific areas of the JTA. The "Installer Badges Passport" features separate pages for each Badge, which include places for the installer and the supervisor/trainer to record the number of times a task has been successfully completed. The "Installer Badges Verification Criteria" includes sample inspection checklists for each Badge. These can be modified as needed based on approved variance requests or more stringent requirements. They also provide a basis for consistent inspections and awarding of Badges. Note: All elements of the Badges Toolkit are designed for use by potential program implementers. They are not off-the-shelf products intended for immediate deployment. Program implementers must review and modify as needed, revise verification criteria to match local requirements, complete worksheets, and otherwise define the parameters of their own badging program.

Desai, Jal↗

U.S. Offshore Wind Energy Noise Reduction Associated with Installation of Fixed-Bottom Foundations: Workshop Report

As offshore wind energy development grows in the United States, solutions are needed to reduce the underwater noise and substrate vibration generated during fixed-bottom turbine installation to help protect marine life. Monopiles are currently the main turbine foundation type installed globally and impact pile driving, the primary installation method, can be a major source of noise and vibration generation during wind farm construction. Opportunities exist to reduce the amount of noise and vibration produced during future offshore wind farm development. The use of alternative foundation types and installation methods, as well as innovative noise abatement technologies, would help reduce the potential detrimental effects on sensitive marine species. To explore these opportunities, the Department of Energy’s Wind Energy Technologies Office, in collaboration with the Bureau of Ocean Energy Management and the National Oceanic and Atmospheric Administration, funded the National Renewable Energy Laboratory and the Pacific Northwest National Laboratory to organize, host, and facilitate a virtual workshop in December 2022. The goal of the workshop was to gather input from the offshore wind energy community on noise reduction strategies for the installation of fixed-bottom offshore wind turbines in U.S. waters across multiple regions, including the U.S. Atlantic Coast, Gulf of Mexico, and Great Lakes to inform recommendations on future research. The joint lab team convened industry representatives, subject matter experts, and regulators to discuss potential pathways to reduce noise and vibration associated with fixed-bottom turbine installation, including the practicality of using alternative foundations and installation methods, the effectiveness of noise abatement technologies, as well as research and monitoring needs. In preparation for the workshop, the team invited experts to be part of a steering committee and worked with its members to help focus activities to meet the workshop goals. Additional pre-workshop activities included developing the invitee list and workshop agenda, reviewing existing Construction and Operations Plans (COP) for proposed offshore wind projects, distributing a brief questionnaire to industry representatives, and drafting the workshop discussion questions and Mural boards. In total, 128 workshop participants provided over 600 comments in response to the 17 group discussion questions used over two workshop sessions. Overarching recommendations highlighted across themes included future investments to provide data sharing, consistency, transparency, and opportunities for sharing best available science, knowledge, and expertise. The joint lab team synthesized the comments and identified four key research and development themes that could help advance the successful implementation of noise and vibration reduction strategies (see report). This report provides an overview of the workshop goals and scope, reviews the pre-workshop activities, presents brief summaries of participant feedback, and concludes with detailed research themes and recommendations for future investments. Appendix A includes the group discussion questions, Appendix B includes the results of the COP review, and Appendix C includes the results of the industry questionnaire. Overall, there was a high level of interest and engagement in the workshop. The sessions provided an opportunity for significant exchange of information between workshop participants from across sectors. Participants identified a variety of opportunities for next steps towards the noise reduction of offshore wind turbine installation in U.S. waters, including recommendations for future investments to provide certainty in the use of new technologies associated with alternative foundation types, noise abatement systems, and efficacy monitoring.

17 WIND ENERGY↗

Installation aerodynamics of wing-mounted, single-rotation propfans

The installation of advanced (M = 0.8) turboprop propulsion systems on transport aircraft represents a challenging task to design engineers. The installation aerodynamics of wing-mounted, single-rotation, tractor turboprop systems have been extensively investigated by NASA Ames using a large powered semispan wind tunnel model. Two configurations have been studied: a straight under-the-wing (UTW) nacelle and a contoured over-the-wing (OTW) configuration. The installation characteristics of these two configurations are presented in terms of installed drag, wing pressure distributions, and surface oil flows. Through the use of wing leading-edge modifications, the installed drag of the UTW nacelle was reduced to less than isolated nacelle drag at the cruise condition of M = 0.8 with a wing C(L) of 0.5. At this condition, the favorable interference is attributed to the recovery of a portion of the swirl in the slipstream generated by the single rotation propeller. The OTW installation represented a much more difficult task. For the configuration tested, the installed drag was unacceptably high and demonstrated the sensitive nature of installing a nacelle/slipstream combination in the transonic flow regime.

Bencze, Daniel P.↗

Thiokol/Wasatch installation evaluation of the redesigned field joint protection system (concepts 1 and 3)

The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).

Cook, M.↗

Using Residential Solar PV Quote Data to Analyze the Relationship Between Installer Pricing and Firm Size

The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low prices are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.

14 SOLAR ENERGY↗

Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.

17 WIND ENERGY↗

LED System Performance in a Trial Installation—One Year Later: Yuma Border Patrol, Yuma, Arizona

The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpected delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Installation caused flow distortion and its effect on noise from a fan designed for turbofan engines

A ground test stand was used to obtain acoustic data on a full scale prototype fan designed for quiet subsonic aircraft engines. The fan was installed in three different ways in the test stand. In two of the installations the fan was driven by a shaft in the inlet; in the third installation the fan was driven from the rear. These three installations, and the structures associated with them, resulted in various amounts of inlet flow distortion to the fan. The rear drive installation had less inlet flow distortion than the two front drive installations. Some measurements of inlet flow distortion were made and used in a blade passage noise generation theory to predict the effects of distortion on noise. Good agreement was obtained when the predicted and measured power level differences between the front drive and rear drive installations were compared.

Povinelli, F. P.↗

Installation caused flow distortion and its effect on noise from a fan designed for turbofan engines.

Use of a ground test stand to obtain acoustic data on a full-scale prototype fan designed for quiet subsonic-aircraft engines. The fan was installed in three different ways in the test stand. In two of the installations the fan was driven by a shaft in the inlet; in the third installation the fan was driven from the rear. These three installations, and the structures associated with them, resulted in various amounts of inlet flow distortion to the fan. The rear-drive installation had less inlet flow distortion than the two front drive installations. Differences in blade passage sound pressure levels of more than 10 dB were measured between the rear-drive and front-drive versions, with the rear-drive installation producing less noise. Perceived noise levels were computed and the influence of the distortion on these levels was determined.

Povinelli, F. P.↗

The Effect of Various Wing-Gun Installations on the Aerodynamic Characteristics of an Airplane Model Equipped with an NACA Low-Drag Wing, Special Report

An investigation was made in the NACA 19-foot pressure wind tunnel to determine the effect of various win-gun installation on the aerodynamic characteristics of a model with an NACA low-drag wing. Measurements were made of lift and drag over an angle-of-attack range and for several values of dynamic pressure on a four-tenths scale model of a high-speed airplane equipped with the low-drag wing and with various wing-gun installations. Two installations were tested: one in which the blast tube and part of the gun barrel protrude ahead of the wing and another in which the guns is mounted wholly within the wing. Two types of openings for the latter installation were tested. For each installation three simulated guns were mounted in each wing. The results are given in the form of nondimensional coefficients. The installations tested appear to have little effect on the maximum-lift coefficient of the model. However, the drag coefficient shows a definite change. The least adverse effect was obtained with the completely internal mounting and small nose entrance. The results indicate that a properly designed wing-gun installation will have very little adverse effect on the aerodynamic characteristics of the low-drag wing.

Muse, Thomas C.↗

The Effect of Several Armament Installations on the Drag of 1/8-Scale Model of the B-32 Airplane

The effect of several armament installations on the drag of a 1/8 scale model of the B-32 airplane was determined. Turrets in the following positions were tested: nose, tail, upper forward, upper aft, and lower. The nose and tail turrets were each equipped with two.50-caliber guns. Upper turrets were of three types: two.50-caliber guns, four.50-caliber guns, and 20-millimeter cannon. Lower turrets were of two types: two.50-caliber guns and four.50-caliber guns. The effect of streamlining the upper two- and four-gun turrets and of extending the lower two-gun turret was determined. The tests were conducted in the Langley 19-foot. pressure tunnel at a Reynolds number of approximately 2,960,000 and a Mach number of 0.13. Large increases in drag coefficient were caused by the complete armament installations. At a lift coefficient of 0. 4 the installations with nonstreamlined upper turrets and the lower turret retracted increased the drag coefficient by 0.0022 and 0.0027 for the two-gun and four-gun turret installations, respectively. Streamlining the upper turrets reduced the drag of these installations by approximately 40 percent with the upper turrets streamlined, the drag increase was about the same for either the two- or four-gun turret installation. The streamlined two-cannon upper turrets increased the drag about the same amount as the two-gun upper turrets that were not streamlined. Extension of the lower turret. increased the drag slightly more than the whole streamlined gun-turret installation.

Fairbanks, R. W.↗

The Effects of Market Concentration on Residential Solar PV Prices: Competition, Installer Scale, and Soft Costs

Competition among residential solar photovoltaic (PV) installers may reduce PV price markups and yield lower prices. At the same time, competition may reduce installer experience and opportunities for cost reductions through learning-by-doing and economies of scale. These dynamics suggest that PV non-hardware or 'soft' costs and installed prices depend on the distribution of market shares among installers, also known as market concentration. This study leverages a rich data set of 226,769 residential PV systems to examine the relationship between market concentration, soft costs, and PV prices. The results show that PV prices are lower, on average, in more concentrated markets, i.e., markets with fewer installers or where few installers hold high market share. The study provides evidence that this relationship is non-linear, such that prices are minimized in markets with an optimal balance of the benefits of market concentration and the benefits of competition.

14 SOLAR ENERGY↗

Evaluation of Installation Time for SMASHmount by SMASHsolar

The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

14 SOLAR ENERGY↗

The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016

Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning around 2010 with the emergence of alternative customer financing options.

14 SOLAR ENERGY↗

The Effects of Market Concentration on Residential Solar PV Prices: Competition, Installer Scale, and Soft Costs

Competition among residential solar photovoltaic (PV) installers may reduce PV price markups and yield lower prices. At the same time, competition may reduce installer experience and opportunities for cost reductions through learning-by-doing and economies of scale. These dynamics suggest that PV non-hardware or 'soft' costs and installed prices depend on the distribution of market shares among installers, also known as market structure. This study leverages a rich data set of 226,769 residential PV systems to examine the relationship between market structure, soft costs, and PV prices. The results show that PV prices are lower, on average, in more concentrated markets, i.e., markets with fewer installers or where a subset of installers holds a large market share. The study provides evidence that this relationship is non-linear, such that prices are minimized in markets with an optimal balance of the benefits of market concentration and the benefits of competition.

14 SOLAR ENERGY↗

Linker Installation: Engineering Pore Environment with Precisely Placed Functionalities in Zirconium MOFs

Precise placement of multiple functional groups in a highly ordered metal–organic framework (MOF) platform allows the tailoring of the pore environment, which is required for advanced applications. To realize this, we present a comprehensive study on the linker installation method, in which a stable MOF with coordinatively unsaturated Zr 6 clusters was employed and linkers bearing different functional groups were postsynthetically installed. Specifically, a Zr-MOF with inherent missing linker sites, namely, PCN-700, was initially constructed under kinetic control. Twelve linkers with different substituents were then designed to study their effect on MOF formation kinetics and therefore resulting MOF structures. Guided by the geometrical analysis, linkers with different lengths were installed into a parent PCN-700, giving rise to 11 new MOFs and each bearing up to three different functional groups in predefined positions. Systematic variation of the pore volume and decoration of pore environment were realized by linker installation, which resulted in synergistic effects including an enhancement of H2 adsorption capacities of up to 57%. In addition, a size-selective catalytic system for aerobic alcohol oxidation reaction is built in PCN-700 through linker installation, which shows high activity and tunable size selectivity. Altogether, these results exemplify the capability of the linker installation method in the pore environment engineering of stable MOFs with multiple functional groups, giving an unparalleled level of control.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗