Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims
The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.